HomeMy WebLinkAbout20140664 All Versions_Inspection_20120912NCDENR o
North Carolina Department of Environment and Natural R
Division of Water Qualityr' S;
Beverly Eaves Perdue Charles Wakild P E SFp man
Governor Directory of 2 etary
084;0 s �RQUq` ol2
September 10 2012 Mti'gy�RryAvy01y
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
Subject Inspection
TIP No B 5113C
Bridge No 146
NCSR 2173
Buncombe County
Dear Mr Swain
On September 5 2012 I inspected the construction work on TIP Project No B 5113C Bridge No 146 over
Stony Fork Creek on NCSR 2173 in Buncombe County The inspection included a review of the construction
and compliance with the 401 Water Quality Certification
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters Also please refer to the attached inspection report for
any specific items noted during the inspection
If you have questions please call me at 828 296 4500
Sincerely
R i2-e-
Michael R Parker
Environmental Senior Specialist
Attachment
cc Cole Hood PE
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
B 5113C Bridge No 146 September 2012 Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296 4500 1 FAX 828 299 7043 One
Internet www ncwaterauahty ora NorthCarollna
An Equal Opportunity Affirmative Action Employer at rally
Site Inspection Report
Site Number WT000635
Site Name BD 5113C Bridge No 146
Site Address PO Box 3279
County Buncombe
Directions
Latitude
Site Owner Name NCDOT Division 13
Inspection Date 09/05/12
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person
On Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Facility compliance Status 0 Compliant
Program Area 401 (includes isolated /non -404)
Question Areas
N Permit (401 WQC)
Region Asheville
Longitude
n Not Compliant
Phone
Phone 828 296 -4500
Inspection Summary
Looked at site on September 5 2012 There was no one at the site at the time of inspection
Construction activity consisted of minor clearing and installation of sediment and erosion control devices
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment
■ ❑❑❑
■❑❑❑
■❑❑❑
Page 1
NCDENR sFA"`�
North Carolina Department of Environment and Natural Resourcek�, �N f�
Division of Water Quality s 4 �
Beverly Eaves Perdue Charles Wakild P E screen
Governor Director V4,4vetary
ycy
September 10 2012
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
Subject Stormwater Inspection
TIP No B 5113 B
Bridge No 15
NCSR 1608
Buncombe County
Dear Mr Swain
On September 5 2012 I inspected the construction work on TIP Project No B 5113B Bridge No 15 over the
South Fork Turkey Creek on NCSR 1608 in Buncombe County The inspection included a review of the
construction compliance with the 401 Water Quality Certification and stormwater records
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters Also please refer to the attached inspection report for
any specific items noted during the inspection
If you have questions please call me at 828 296 4500
Sincerely
I
Michael R Parker
Environmental Senior Specialist
Attachment
cc Garry Moore
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
B 5113B Bridge No 15 September 2012 Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 -8211
Phone 828 296-45001 FAX 828 299 7043 One
Internet www ncwaterouality orci NorthCarohna
An Equal Opportunity Affirmative Action Employer Naturally
I
it
r
Site Inspection Report
Site Number
WT000636
Site Name
BD 1553B Bridge No 15
Site Address
PO Box 3279
County
Buncombe
Directions
Latitude
Site Owner Name
NCDOT Division 13
Inspection Date
09/05/12
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person
On Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Facility compliance Status E Compliant
Program Area Construction SW (NCG010000)
Question Areas
E NCG010000 Permit
Region Asheville
Longitude
0 Not Compliant
Inspection Summary
Reviewed site There was no construction activity at the time of inspection
One end bent has been completed and work had started on the other one
Sediment and erosion control measures appeared to be working properly
Stormwater records appear to be neat and kept in an orderly manner
z
Phone
Phone 828 296 4500
Page 1
Site Number WT000636 Owner NCDOT Di sion 13
Inspection Date 09/05/12 Inspection Type Site Inspection (DOT) Reason for Visit Routine
NCG010000 Permit
Yes
No
NA
NE
# Is this inspection related to a DLR/delegated program inspection?
■
❑
❑
❑
If Yes what was the DLR/delegated program inspection date?
Is the site following its E &SC Plan as per DLR or delegated program?
■
❑
❑
❑
Is the site maintaining their E &SC measures as per DLR or delegated program9
■
❑
❑
❑
Is a copy of the approved E &SC plan on site?
■
❑
❑
❑
Is a rain gauge present on site or is MPE in use for the site?
■
D
❑
❑
Is rain gauge data or MPE data recorded?
■
❑
❑
❑
Are inspection records complete?
■
❑
❑
❑
Is the site compliant with other conditions of the NCG010000 permit?
■
❑
❑
❑
Comment
Page 2
A ��
NCDENR��
North Carolina Department of Environment and Natural Resourg "
14anDivision of Water Quality 2 Beverly Eaves Perdue Charles Wakild P E �y ��'�' ?,pie
Governor Director ��sIRO Secretary
�fygTFR �
yCy
September 10 2012
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
Subject Stormwater Inspection
TIP No B 5113A
Bridge No 550
NCSR 1383
Buncombe County
Dear Mr Swain
On September 5 2012 I inspected the construction work on TIP Project No B 5113A Bridge No 550 over
the South Fork Turkey Creek on NCSR 1383 in Buncombe County The inspection included a review of the
construction compliance with the 401 Water Quality Certification and stormwater records
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters Also please refer to the attached inspection report for
any specific items noted during the inspection
If you have questions please call me at 828 296 4500
Sincerely
Michael R parker
Environmental Senior Specialist
Attachment
cc Garry Moore
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
B 5113A Bridge No 550 September 2012 Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296-45001 FAX 828 299 7043 One
Internet www ncwaterouality ora NorthCarolina
An Equal Opportunity Affirmative Action Employer NaturallrY
5
i
Site Number
WT000637
Site Name
BD 5113 A
Site Address
PO Box 3279
County
Buncombe
Directions
Latitude
Site Owner Name
NCDOT Division 13
Inspection Date
09/05/12
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person
On Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Site Inspection Report
Region Asheville
Longitude
Facility compliance Status E Compliant Q Not Compliant
Program Area Construction SW (NCG010000)
Question Areas
N NCG010000 Permit
Inspection Summary
Reviewed site with inspector
Both end bents had been completed and contractor is waiting on beams
Sediment and erosion control measures appeared to be working properly
Stormwater records appear to be neat and maintained in an orderly manner
Phone
Phone 828 296 4500
Page 1
Site Number WT000637
Inspection Date 09/05/12
Owner NCDOT Divi ion 1"t
Inspection Type Site Inspection (DOT)
NCG_O10000 Permit
# Is this inspection related to a DLR/delegated program inspection?
If Yes what was the DLR/delegated program inspection date?
Is the site following its E &SC Plan as per DLR or delegated program?
Is the site maintaining their E &SC measures as per DLR or delegated program?
Is a copy of the approved E &SC plan on site?
Is a rain gauge present on site or is MPE in use for the site?
Is rain gauge data or MPE data recorded?
Are inspection records complete?
Is the site compliant with other conditions of the NCG010000 permit?
Comment
Reason for Visit Routine
0000
■nnn
■nnn
■nnn
■nnn
®nnn
■nnn
■nnn
Page 2