Loading...
HomeMy WebLinkAbout20120582 Ver 1_Emails_20120921Adams, Amy From: Adams, Amy Sent: Friday, September 21, 2012 1:17 PM To: Huggett, Doug Cc: Howell, Jonathan; Govoni, Daniel; Dunn, Maria T.; Hart, Kevin; Wheeler, Tracey L SAW Subject: George Knox Bulkhead Project Doug, After meeting on -site with the applicant this morning and assessing the site, I have a better understanding of the request for a pipe. The pipe will be placed outside of the wetlands and extend to the new bulkhead in order to maintain the hydrologic connection to surface waters. The pipe is not intended to drain the wetlands, but to maintain connectivity. In this instance, the pipe is allowable. All stormwater will still be allowed to diffuse flow across the new buffer. I am waiting on a written response from the applicant to remove the project from hold status. I can resume processing at that time. Thanks, Amy Adams Environmental Senior Specialist 401/Wetlands Unit NC Division of Water Quality Surface Water Protection Washington Regional Office www.ncwatergualitV.org 252.946.6481 **E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. **