Loading...
HomeMy WebLinkAbout040031_Application_20200619State of North Carolina Department of Environment and Natural Resources Division of Water Quality Animal Feeding Operations Permit Application Form (THIS FORM MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) State General Permit - Existing Animal Waste Operations 1. GENERAL INFORMATION: 1.1 Facility name: Live Oak Farms 1&2 1.2 Print Land Owner's name: Lee R. Lookabill 1.3 Mailing address: PO Box 1106 City, State: Wadesboro, NC Zip: 28170 Telephone number (include area code): (704 ) 694 - 0382 1.4 Physical address: 1196 Gatewood Station Rd. City, State: Wadesboro, NC Zip: 28I70 Telephone number (include area code): ( 1.5 County where facility is located: Anson 1.6 Facility location (directions from nearest major highway, using SR numbers for state roads): 1196 Gatewood Station Rd 1.7 Farm Manager's name (if different from Land Owner): 1.8 Lessee's / Integrator's name (if applicable; circle which type is listed): Smithfield Hog Production 1.9 Facility's original start-up date: 2. OPERATION INFORMATION: 2.1 Facility number: 04-31 2.2 Operation Description: Please enter the Design Capacity of the system. waste management structures were designed. Tv e of Swine No. of Animals Wean to Feeder 7104 ❑ Feeder to Finish ❑ Farrow to Wean (# sow) LI Farrow to Feeder (# sow) ❑ Farrow to Finish (# sow) ❑ Wean to Finish (# sow) ❑ Gilts ❑ Boar/Stud ❑ Other Type of Livestock on the farm: Date(s) of facility expansion(s) (if applicable): The "No. of Animals" should be the maximum number for which the Type of Poultry No. of Animals Type of Cattle No. of Animals ❑ Layer ❑ Beef Brood Cow ❑ Non Layer _ ❑ Beef Feeder ❑ Turkey ❑ Beef Stocker Calf ❑ Turkey Poults ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow Milk Cow No. of Animals: FORM: AWO-STATE-G-E 1/10/06 Page 1 of 5 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 18.71 Required Acreage (as listed in the CAWMP): 18.71 2.4 Number of lagoons: 2 Total Capacity (cubic feet): 347.699 Required Capacity (cubic feet): 323,980 Number of Storage Ponds: Total Capacity (cubic feet): Required Capacity (cubic feet): 2.5 Are subsurface drains present within 100` of any of the application fields? YES 2.6 Are subsurface drains present in the vicinity or under the waste management system? 2.7 Does this facility meet all applicable siting requirements? or a (circle one) or 1V (circle one) or NO (circle one) 3. REQUIRED ITEMS CHECKLIST; Please indicate that you have included the following required items by signing your initials in the space provided next to each item. 3.1 One completed and signed original and two copies of the application for State General Permit - Animal Waste Operations, 3.2 Three copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied and a county road map with the location of the facility indicated; 3.3 Three copies of the entire Certified Animal Waste Management Plan (CAWMP). If the facility does not have a CAWMP, it must be completed prior to submittal of a permit application for animal waste operations. The CAWMP must include the following components. Some of these components may not have been required at the time the facility was certified but should be added to the CAWMP for permitting purposes: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application 3.3.4 The soil series present on every land application field 3.3.5 The crops grown on every land application field 3.3.6 The Realistic Yield Expectation (RYE) for every crop shown in the WUP 3.3.7 The PAN applied to every land application field 3.3.8 The waste application windows for every crop utilized in the WUP 3.3.9 The required NRCS Standard specifications 3.3.10 A site schematic 3.3.11 Emergency Action Plan 3.3.12 Insect Control Checklist with chosen best management practices noted 3.3.13 Odor Control Checklist with chosen best management practices noted 3.3.14 Mortality Control Checklist with the selected method noted 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.); please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility 3.3.16 Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (Composting, waste transfers, etc.) 4. APPLICANT'S CERTIFICATION: FORM: AWO-STATE-G-E 1/10/06 Page 2 of 5 This form must be completed by the appropriate DWQ regional office and included as a part of the project submittal information. INSTRUCTIONS TO NC PROFESSIONALS: The classification of the downslope surface waters (the surface waters that any overflow from the facility would flow toward) in which this animal waste management system will be operated must be determined by the appropriate DWQ regional office. Therefore, you are required, prior to submittal of the application package, to submit this form, with items 1 through 6 completed_ to the appropriate Division of Water Quality Regional Aquifer Protection Supervisor (see page 6 of 10). At a minimum, you must include an 8.5" by 11" copy of the portion of a 7.5 minute USGS Topographic Map which shows the location of this animal waste application system and the downslope surface waters in which they will be located. Identify the closest downslope surface waters on the attached map copy. Once the regional office has completed the classification, reincorporate this completed page and the topographic map into the complete application form and submit the application package. 6.1 Farm Name: 62 Name & complete address of engineering firm: Telephone number: ( ) 6.3 Name of closest downslope surface waters: 6.4 County(ies) where the animal waste management system and surface waters are located 6.5 Map name and date: 6.6 NC Professional's Seal (If appropriate), Signature, and Date: TO: REGIONAL AQUIFER PROTECTION SUPERVISOR Please provide me with the classification of the watershed where this animal waste management facility will be or has been constructed or field located, as identified on the attached map segment(s): Name of surface waters: Classification (as established by the Environmental Management Commission): Proposed classification, if applicable: Signature of regional office personnel: Date: (All attachments must be signed) FORM: AWO-STATE-GE 1/10/06 Page 4 of 5 DIVISION OF WATER QUALITY REGIONAL OFFICES (9/05) Asheville Regional APS Supervisor 2090 U.S. Highway 70 Swannanoa, NC 28778 (828) 296-4500 Fax (828) 299-7043 Avery Macon Buncombe Madison Burke McDowell Caldwell Mitchell Cherokee Polk CIay Rutherford Graham Swain Haywood Transylvania Henderson Yancey Jackson Fayetteville Regional APS Supervisor 225 Green Street, Suite 714 Fayetteville, NC 28301-5094 (910) 486-1541 Fax (910) 486-0707 Anson Blarhen Cumberland Harriett Hoke Montgomery Moore Richmond Robeson Sampson Scotland Winston-Salem Regional APS Supervisor 585 Waughtown Street Winston-Salem, NC 27107 (336) 771-5000 Fax (336) 771-4631 Alamance Alleghany Ashe Caswell Davidson Davie Forsyth Guilford Rockingham Randolph Stokes Surry Watauga Wilkes Yadkin Washington Regional APS Supervisor 943 Washington Square Mall Washington, NC 27889 (252) 946-6481 Fax (252) 975-3716 Beaufort Jones Bettie Lenoir Camden Martin Chowan Pamlico Craven Pasquotank Currituck Perquimans Dare Pitt Gates Tyrell Greene Washington Hertford Wayne Hyde Mooresville Regional APS Supervisor 610 East Center Avenue Mooresville, NC 28115 (704) 663-1699 Fax (704) 663-6040 Alexander Cabarrus Catawba Cleveland Gaston Iredell Lincoln Mecklenburg Rowan Stanly Union Raleigh Regional APS Supervisor 1628 Mail Service Center Raleigh. NC 27699-1628 (919) 791-4200 Fax (919) 571-4718 Chatham Durham Edgecombe Franklin Granville Halifax Johnston Lee Nash Northampton Orange Person Vance Wake Warren Wilson Wilmington Region APS Supervisor 127 Cardinal Drive Extension Wilmington, NC 28405-3845 (910) 796-7215 Fax (910) 350-2004 Brunswick New Hanover Carteret Onslow Columbus Fender Duplin FORM: AWO-STATE-G-E 1/10/06 Page 5of5 Ids app ation for has been -lewd by me is accurate and complete appticati n are not completed ....d that r _, package will be Signature F 5. apph at has been applicati package Signature THE 6. SU FORM: for viewed by me and is accurate and complete to the best of rare- knowledge. T understand that if all required P r acility rianie listed in question L I) are not completed ant that if an required supporting information and attachments are ant included, this application ill be tamued as incomplete. (Land Owwllex's name listed in goon 121 attest that (Facility woe listed in question 1.1) to the best ofrnv knowledge. I understand that ifall tugnired parts of this rtbrg information and attachments are not included; this application Date NAGS R'S CERTIFICATION: (complete only ifditiercut from the Land Owner) (Manager's name fisted in question 1.6), attest that this Hate :70MPLEI ED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORIVIATION AND MATERIALS_ SHOULD BE SENT TO TEE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY AQUIFER PROTECTION SECTION ANIMAL FEEDING OPE.RATI{NS UNIT 1636 MAIL SERvi E CENTER IAALEIGH, NORTH CAROLLNA 27699-1636 TELEPHONE NUMBER: (919) 733-3221 FAX NUMBER: (9.19) 715-6048 PACE WATER CLASSIFICATION: WO-STATEG-E 1/10/06 Page 3 of 5 General tnforrnation: Name of Farm: Owner(s) Name: Mailing Address: Farm L tiara_ Latitudeelnd Longitude: Animal Waste Management Plan Certification (Please type or pin all'infarrnation that does not require a signature) Live Oak Farms 1t32 Lee R Lookabill PO Box 1106 Wadesboro. NC 28170 Facility No: 04-31 Phone No: 704-694-8521 County Farm is located in: Anson Please attach a copy of a county road map�with location identified anddescribed perm (Be names, cfrections, milepost, etc): t t`' _ � Integrator. evilre: roa - Murphy Brown Operation Description: Type pftwee Wean to Feeder ❑ Feeder to Finish E3 Farrow to Wean ❑ Farrow to Feeder Farrow to Finish ❑ Wean to Finish Guts Boars I No. ofAmmais 7104 Type of Poufiy No. ©f Animals d Layer Pullets Type of Cattle ❑ Dairy © Beef Acreage Available for Application: 18.71 Required Acreage: 18.71 Number cf Lagoons / Storage Ponds: 2 Total Capacity: 347,699 Cubic Feet (ft3) Are subs rface drains present on the farm: Yes or No (please circle one) If YES: a e subsurface drains present in the area of the LAGOON or SPRAY FIELD (pleAsc• circle one) .*rvrsfliea4..-A-N'e`tryskinF******llilrk****:*.-4-i[k#3f4-#fHF:hk*******IrInkYil1-1-**R.*hffZii.Ffhf..Ni3*" MlA• .l ts�l w-s*;gk}RYyRyyi.,�i ,,y„�,� Owner f Manager Agreement I (we) vertfy that ail the above information is cos t and will be updated upon changing. 1 (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion t0 the existing design capacity of the waste treatment and storage system or construction of new facilities wilt require a new cert'rrication to be submitted to the Division of Environmental Management before the new anim Ifs are stocked. 1 (we) understand that there must be no disci -large of anima/ waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the 25 - year, 24 - hour ;torm and there must not be run-off front the application of animal waste. I (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical .standards developed by the Natural Resources Conservation Service. —he approved plan will be filed at the farin and at the office of the local Soil and Water Conservation f3istrict_ 1 (we) know that any Modification must be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to impiernen)ation. A change in land ownership requires written notification to DEM or a new certification (if the approved plan is changed) Wthin 60 days of a title transfer. No. orNrU3mdls Name of 1.,ap91 Signature: Name of Manager (if different from owner): Signature: Date: AWC — August 1, 1997 1 Date Technical Specialist Certification I. As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005. I certify that the animal waste management system for this farm named above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Environmental Management (DEM) as specified in 15A NCAC 2H.201 and the USDA -Natural Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001.0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC, I), the technical specialist should only certify parts for which they are technically competent. 11. Certification of Design A) Calle, tion. Storage, Treatment System Check t appropriate box Existing facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity: storage capability consistent with waste utilization requirements. New, expanded or retrofitted facility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagoons and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agency,: P.O. Box 856, W-arsaw, NC 2839€ Phone No. (910) 293-3434 Signature: ( � 1 t,,�_` Date: a_ \gHD-Q B) Land Application Site (WUP) The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management hydraulic and nutrient loading rates. Name of Technical Specialist (Please Print): Toni King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agency): P.O. Box 856, ,Warsaw, NC 2839E Phone No.: (910) 293-3434 Signature: ��� � ) � Date: -Vk- 2( C) Runoff Controls from Exterior Lots Check the appropriate box Facility without exterior lots (SD or WUP or RC) This facility does not contain any exterior lots. Facility with exterior lots (RC) Methods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Age y): P.O. Box 856, raw, NC 2839E Phone No.' (910) 293-3434 Signature: ` q ) Date: AWC -- August 1, 1997 2 D). Application and Handling Equipment Check t appropriate box I I Existing or expanding facility with existing waste application equipment (WUP or I) Animal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates. A schedule for timing of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). ❑ New, expanded or existing facility without existing waste application equipment for spray irrigation. (I) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan: (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established: required buffers can be maintained: calibration and adjustment guidance are contained as part of the plan). ❑ New, expanded or existing facility without existing waste application equipment for land spreading not using spray irrigation. (WUP or I) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan: (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates: a schedule for timing of applications has been established; required buffers can be maintained: calibration and adjustment guidance are contained as a part of the plan). Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agen 8 )): P.O. Box 6�Warsaw, NC 2839E Phone No: (910) 293-3434 Signature: �Q, `,� w Date: E) Odor Control, Insect Control, Mortality M clement and Emergency Action Plan (SD. SI, WUP, RC or I) The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality Management Plan and the Emergency Action Plan are complete and can be implemented by this facility. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agen ): P.O. B 85 , Warsaw, NC 2839E Phone No: (910) 293-3434 Signature: CAI,- t Date: F) Written Notice of New or Expanding Swir' Farm �y The following signature block is only to be used for new or expanding swine farms that begin construction after June 21, 1996. If the facility was built before June 21, 1996, when was it constructed or last expanded . i (we) certify that I (we) have attempted to contact by certified mail all adjoining property owners and all property owners who own property located across a public road, street or highway from this new or expanding swine farm. The notice was in compliance with the requirements of NCGS 106-805. A copy of the notice and a list of property owners notified is attached. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature: Date AWC -- August 1, 1997 3 111. Certification of Installation A) Collection, Storage, Treatment Installation New, expanded or retrofitted facility (SI) Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed in accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing facilities without retrofits, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation Date Work Completed: Address (Agency): Phone No.: Signature: Date: B) Land Application Site (WUP) Check the�ap opriate box I r'I The cropping system is inplace on all land as specified 9 Y pec ed in the animal waste management plan. 0 Conditional Approval: all required land as specified in the plan is cleared for planting: the cropping system as specified in the waste utilization plan has not been established and the owner has committed to establish the vegetation as specified in the plan by (month/day/year); the proposed cover crop is appropriate for compliance with the waste utilization plan. Also check this box if appropriate If the cropping system as specified in the plan can not be established on newly cleared land within 30 days of this certification, the owner has committed to establish an interim crop for erosion control: Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Ag cy): P.O. B x 856 Warsaw, NC 2839E Phone No.: (910) 293-3434 Signaturk Date: -- 1Pt-._() This following signature block is only to be used when the box for conditional approval in Ili. B I (we) certify that I (we) have committed to establish the cropping system as specified in my (our) waste utilization plan, and if appropriate to establish the interim crop for erosion control, and will submit to DEM a verification of completion from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature: Date AWC -- August 1, 1997 4 C) Runoff Controls from Exterior Lots (RC) Facility with exterior lots Methods to minimize the run off of pollutants from lounging and heavy use area have been installed as specified in the plan. For facilities without exterior lots, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation Date Work Completed: Phone No.: Address (Agency): Signature: Date: D) Application and Ha dlinq Equipment Installation (WUP or I) Check the appropriate ck Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and adjustment materials have been provided to the owners and are contained as part of the plan. Animal waste application and handling equipment specified in the plan has not been installed but the owner has produced leasing or third party application and has provided a signed contract: equipment specified in the contract agrees with the requirements of the plan: required buffers can be maintained: calibration and adjustment guidance have been provided to the owners and are continued as part of the plan. Conditional approval: Animal waste application and handling equipment specified in the plan has been purchased and will be on site and installed by (month/day/year); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping system contained in the plan; and calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Age): P.O. Box 856, Warsaw, NC 2839E Phone No.: (910)293-3434 Signature: ��Lsj _ �w� Date: - `g-p_v The following signature block is only used when the box for conditional approval in III D above has been checked. I (we) certify that I (we) have committed to purchase the animal waste application and handling equipment as specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation from a Technical Specialist within 15 days following the date specified in the conditional certification. l (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature: Date E) Odor Control, Insect Control and Mortality Management (SD, SI, WUP, RC or I) Methods to control odors and insects as specified in the Plan have been installed and are operational. The mortality management system in the Plan has also been installed and is operational. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agenc P.O. Box 856, Warsaw, NC 2839E Phone No. (910)293-3434 Signature: ,� ) • � Date: ,' ` i—`�rJ U AWC -- August 1, 1997 5 Please return the completed form to the Division of Water Quality at the following Address: Department of Environment Health, and Natural Resources Division of Water Quality Water Quality Section, Compliance Group P.O. Box 29535 Raleigh, NC 27626-0535 Please remember to submit a copy of this form along with the complete Animal Waste Management Plan to the local Soil and Water Conservation District Office and to keep a copy in your files with your Animal Waste Management Plan. AWC -- August 1, 1997 6 Murphy -Brown, LLC 1/28/2020 NUTRIENT UTILIZATION PLAN 2822 Hwy 24 West P.O. Box 856 Warsaw, NC 28398 Grower(s): Farm Name: County: Permit Capacity: Lee R Lookabill Live Oak Farms 1 & 2 Facility 04-31 Anson Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish Gilts Boars 7104 Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 days Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2 Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWR regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 11 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft3, tons, etc.): Capacity Type Waste Produced per Animal Total 7104 Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish Gilts Boars 3203 gal/yr 3861 gal/yr 10478 gal/yr 191 gal/yr 776 gal/yr 927 gal/yr 1015 gal/yr 2959 gal/yr gallyr gallyr gallyr 1,356,864 gal/yr gal/yr gallyr gallyr gal/yr Total 1,356,864 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): Capacity Type Nitrogen Produced per Animal Total 7104 Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish Gilts Boars 3.84 Ibslyr 6.95 Ibslyr 18.86 Ibslyr 0.34 Ibslyr 1.4 Ibslyr 1.67 lbs/yr 1.83 Ibslyr 5.33 Ibslyr Ibslyr Ibslyr Ibs/yr 2,415 Ibslyr Ibslyr Ibslyr Ibslyr Ibslyr Total 2,415 I bsly r Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: Total N Required 1st Year: Total N Required 2nd Year: Average Annual Nitrogen Requirement of Crops: Total Nitrogen Produced by Farm: Nitrogen Balance for Crops: 18.71 3837.47 0.00 3,837.47 2,415.36 (1,422.11) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 11 Reception Area Specifications my Q N O cq-Q' O N O v. c0 up0 m ,0 l< COF 0 mQ a+ z 1- .a J 6 N mrn r cm 0.)9 2nd Crop Time to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Total Ibs N Code Apply Yield Ibs NLUnit Residual /Ac Utilized m C) 0 CO .. K V V) VI en O 10 O O 10 10 OD C N v. OS W 1D O 0 N O 0 0 0 Q a Q 0 .Q .Q a a O n 0 0 Y Y Y 1st Crop Time to let Crop 1st Crop Lbs WAG Lbs N Total Ibs N Code Apply Yield Ibs NlUnit Residual !Ac Utilized a CA 0 F) (0 r w m o N Om 0 ' N" r t- (0 m CO r r- 0 n 6 CO CO co v/ c] CC 7 C] 0 c March -Se t March -Sept 0 0 CO I CO 0 Q m m CO rn d d N 1: tp CO m N N Cl V I 2098 2098 'Reception Area Specifications 2 _ N O n H 4 O O G1 6 Z 15 H N J 2nd Crop Time to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Total Ibs NI Code Apply Yield Ibs N1Unit Residual /Ac Utilized I Tract Field Irrigated Soil 1st Crop Time to let Crop 1st Crop Lbs NIAc Lbs N Total Ibs N Acreage Type Code Apply Yield Ibs NIUnit Residual lAc Utilized O M W O 0 0 i This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (Le. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended aver broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop A B C B/C D E F G H J K L M N 0 P S CC SWG Barley Grazed Hybrid Bermudagrass Hybrid Bermudagrass Hay Comb. Hybrid Bermudagrass Corn - Grain Corn - Silage Cotton Grazed Fescue Fescue Hay Oats Rye Grazed Overseed Overseed Hay Grain Sorghum Wheat Soybean Pine Trees Small Grain Cover Crop Swithgrass Description -Harvested As Grain Crop Pasture/Grazed Hay Graze/Hay Combination Grain Crap Silage Cotton Lint Pasture/Grazed Hay Grain Crop Grain Crop Pasture/Grazed (Seeded in Bermudagrass) Hay (Seeded in Bermudagrass) Grain Crop Grain Crop Grain Crop Pine Trees Grain Crop/ Hay (After Grain Crop) Not Harvested; Burned/Disked In Biomass Crop Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 11 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications Farrow to Wean Farrow to Feeder Farrow to Finish 7104 Wean to Feeder Wean to Finish Feeder to Finish Gilts Boars PAN/yr/animal Farm Total/yr 0.8 0.96 3.9 0.07 0.27 0.34 0.39 0.55 497.28 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 497.28 pounds of plant available nitrogen per year and will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 2486.4 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 8 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 19.8912 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5 of 11 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop in/Fir * inches 2098 2 AeB B 0.5 1 2098 3 PgB B 0.45 1 2098 4 PgB B 0.45 1 6of11 Additional Comments: This plan revision is to combine Live Oak 1 (04-31) and Live Oak 2 (04-32). Rates have been updated but no crop changes have been made. 7 of 11 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Live Oak Farms 1 & 2 Facility 04-31 Owner: Lee R Lookabill Manager: OwnerlManager Agreement: Ifwe understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above_ /we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to QWR before the new animals are stocked. Ifwe understand that 1 must own or have access to equipment. primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. 1 also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NGDWR upon request. Name of Facility Owner: Lee R Lookabill Signature: Name of Manager (if different from owner): Signature: 4i_-"9-did Date Date Name of Technical Specialist: Toni W. King AWliafion_ Address: Signature: Murphy -Brown, LLG. 2822 Hwy 24 West, PO Drawer 856 Warsaw, NC 28398 Telephone: (910) 293-3434 8of11 Date NUTRIENT UTILIZATION PLAN 1 2 3 REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. Animal waste shall be applied to meet, but riot exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 6 7 8 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See 'Weather and Climate in North Carolina" for guidance). Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9of11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 10 of 11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 11 of 11 Live Oak Farms # 1 Swine Farm Swine Waste Irrigation Application System Layout Map Scale: I " = 200' well, d 2 11og Operation Legend 1 100 ft. buffer around well • Gun Diamctcr ® Hydrant - with gun cart pull 20ft. Field Boundary - Fence Line 25 ft. buffer along perennial water rx % x distance - gun spacing y distance - lateral spacing NOTES to Operation and 'Wettable Acres" Determination Map surveyed in field with total station Operation sited 1/18/95, Construction complete 6130/95, 0.200 certifed S/32/95 Setback Requirements - 25' from surface wafer, 100' from well Operator:Live 'Oak ## Count:: ANS_€h Date: / 195 Leroy L: Et al Distance so nearest residence (other than owner); 120:� 0 < sc[:�_.� feet 1. AVERAGE LIVE :EIGHT (ALA) 0 sows (farrow to finish) 1417 its. 0 Its O sows (farrow to feeder) x 522 lbs. 0 ibs �O hEad (finishing only) x 135 lbs. = 0 lbs J sows (farrow to wean) x 433 lbs. _ 0 lbs 3552 had (dean to ) x 30 lbs. = 106560 lbs Describe other 0 Total Average Live WEi;j = 106560 its r � �=t MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON dO)L'.53E = 106560 its, ALA x Treatment Vol ue( F) lb, ALW Treatment `Y`.lume(CF)i)t3, ALA = 1 cF li:. ALA Voiv.me = 106560 cubit feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubit feet TOTAL OE'SIGNED VOLUME {{ Inside top length (feet) Inside top width (feet) Top of dike elevation (feet) Bottom o, lagocin` elevation (feet) Freeboard (feet) Side slopes (inside lagoon) 5 sides, 3 rt. angle corners 250.0 max. 120.0 min. .. _... 135.0 max. 65.0 min. 96.0 054 1.0 3.0 :1 avg Total design volume using prisr:rooidal formula SSiENDr1 SSIEND2 SS€SIDE1 Si SIDE2: LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 i_44 120 9.5 MX. ISiax. SEE ATTACHED SPsEnu5€ELT EVALUATION by R. Horton tr}r€ AREA OF TOP LENGTH * WIDTH _ //p 3( -718- y AREA{{ F T ) L-f"f IS[} LI 1.sV ii SiFi OOPti.€:�1 max. i?a:i. AREA OF BOTTOM LENGTH * WIDTH - 136 80 11742 ( AREA OF BOTTOM) rr€ah. max. AREA OF MIDSECTION LENGTH * WIDTH * 4 215 105 75091 (AREA OF MIDSECTION Ma . max, . FT. = [AREA! TOP 7 / 4*AnLA MIDSECTION) T rrrr Bi T sM1 # DEPTH/6 27188.0 75091.0 11742.0 1.53 C:aicutated Volume Available - 174830 CU. FT. Total Design Volume Available 174830 CU. FT. TEIPP0Ri i' STORAGE REQUIRED SEE ATTACHED SPREADSHEET EVALUATIONFVALUATION by R. :Grisr DRAINAGE AREA: Lagoon (top of dike) Length * Width 250.0 135.0 29200.0 square feet max. max. Buildings (roof and lot water) 2725.0 square feet TOTAL DA 31925.0 square feet Design temporary storage period to be 5A. Volume of waste produced Fei.i's & urine production in jai./day per 135 lb. A_ Describe this area. 180 days. 1.37 Volume = 106560 lbs. ALi/135 lbs. ALii * 1.37 gal/dad 180 days rlolulne = 194450 dais. or 26022.7 cubic feet 5B. Volume of wash water This is the amount of fresh water- used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water_ are accounted for in 5A. Vo?urre vo l ir;7se = 0.0 cubic feet 0.0 gallons/day * 180 days storage/ .48_ gallons per C i- 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall Vc:iume = 5.0 in * DA / 12 inches per focit Volume = 13302.1 cubic feet 5D. Volume of 25 year- 24 hour storm Volume = 6.3 inches / 12 inches per foot * DA Volume = 16760.6 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 26023 c'ubi! feet 58. 5 0 cubic feet 5"ir. 13302 cubic feet 5D. 16761 cubic feet 5.0 inches TOTAL 56085 cubic feet S. SUMMARY SEE ATTACHED SPREADSHEET EVALUATION by R. Horton Temporary s cra e period > 180 J days Rainfall in excess of evaperati:i;r > 5.0 inches 25 year - 24 hour rainfall ) 6.2 inches FreebuarC. 1.0 feet Side slopes > 3.0 .1 inside top length > 250.0 ft. max. 120.0 ft Inside top width 135.0 ft. max. 65,0 ft. Top of dike elevation ; 94.0 feet Bottom of Iapon eievaticm f 85.8 .8 Total required volume > 6. St�..64.J cu. ft. Actual design volume 174830 cu. ft. Seasonal high: watertable elevation SH1T:==-, 92,0 feet Stop pumping elev. 92.E feet Must be > or = to the SHE v _,-_> 9 t s3elt elev. F Fc:.« fees Must be > or = to min. rep;. treatment el.=> 92.1 feet Required minimum treatment volume - --t 1065 0I cu. s ft. Volume at stop pumping elevatiu:i > 116768 cu. ft. Start pumping elev. > 94.2 feet Must be at bottom of freeboard 8., 25 yr. rainfall .actual volume fiefs 25 yr.- 24 hr. rainfall==r 158069 cua ft. volume at Start Si.mpiri9 elevation 1 1578 2 ui tt. F +s 'JC'-v c -. Required volume to be Humped 39325 oil. ft. Actual volume panned to be pumped > 41095 cu. ft. Min. thickness of soil i inef when reOsu red==>• 1.5 ft, 7. DESIGNED BY; APPROVED ED BY �� DATE: DATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN dope Lces6 154,ce.e raft . i*+0•111041z L-5}1ry . ,.� c►d ��a�e1 lc«,Qa r `7k\ rg i, mock 5'1O� ?"+ 1? \.t, Ceara SM \ wCPtd Aa Sts LIVE OAK FARMS (Leroy Lookabill by R. Horton 4195 lagoon volume capacity calculations General Information: sea attached site drawing 5 - sides, 3 rt. angle corners Uniform (or uniform variable slope) bottom Elevation Top----) 96.0 Freeboard 1.0 ft. Elevation Bottom Min.-) 85.8 Max.-) 85.8 Length at top (ft) Min.-) 120 Max.-) 250 ))3)) 6.30 Width at Top (ft) Min.-) 65 Max.-) 135 )})y} 5,40 Side Slopes Ratio affect. 0 L/W lines calculations 1/1/1/111/ 1/i/1/1/- 3.10 2.70 CALCULATIONS: Length of Remaining Side (to nearest ft.) 148 ft. Surface Area (at top of lagoon) 29200 sq.ft. (pike vAi.c0 CAPACITY: Volume calculations using prismiodal formula Area @ 95.0 max.---27186 b ial, r g� 9.)Area @ 85.8 bottom-11742 ( t,ot ettu. tiavq Area of midsection-18773 [Area Top + (4*Area Midsection) + Area Bottom] * Depth/6 27188 75091 11742 1.53 Available Design Vol. to Min. Bottom: 174830 d 11 wl 1.0 244 130 10.2 186 80 5.6 215 105 12 128 105 116 w2 area 69 27188 59 11742 64 18773 BOTTOM DIMENSIONS @ elev.- 85.8 minimum bottom Length - (ft) Min.-) 80 Max.-) 186 Width - (ft) Min.--) 21 Max.-) 80 TOTAL DESIGN VOLUME AVAILABLE: 174830 DESIGN ELEVATIONS (VOLUMES) 7.1 206 97 107 51 17190 Min, Volume Elev. @ 92.1 Volume 107825 3.9 225 114 118 59 22191 6.9 207 98 108 52 17490 Stop Pumping Elev.@ 92.5 Volume 116768 3.5 228 116 119 61 22868 6.0 212 103 111 54 18791 Start Pump Elev. @ 94.2 Volume • 157863 1,8 239 125 124 65 25853 Actual volume Effluent Pumped ----- 41095 CAkC.t�1wkiC nS Ai1�Qt1 kn.6 `rC""'�j � 1egA ,� Dir.e'n 6 i caro 5 jUg115 . ;ei V et �� L �4qS _sw,ll,) ti COe'►Skrv,CkCk tiiD�ln+ Z0) 4 V E» rW V� Z o o 0 Q o co0 c6 —Ic ® Q co CL _a) °} I— 05 4 0 > CD E W N Q 7+ s E E QRS ca � � _ �In o co cb (n W .� }- u' a `ate c CD Q13 0E, m Q) Le r��r Lcu,kcGk7) k 41 e`C c3.1 W to Total Design Storage Elev. Invert Outlet Pipe Elev. Stop Pump Elev. 4\ Bottom Elev. cn a0c Q12, CO a W -aa�i 'go Z (2go 0 O U n 'a g a Q (!) N tv 'a al � W aa.Q-S Z v�°32 a� Operab*nLomy Lookabill et alnty� A�mn Da�� 5/Gy95 ^ u � AL'� �L Sr IVE H[lSHl (��) V mws (�Trow to fin�sh) 0 s�ws (��row to fesde ) x �� ]hs. 0 Da 0 �ead <fioixLinq V yve� <farmw tu wean) x 433 head (�on �o fe�er> x 30 lbs. ~ 10656V 1hs �escribe o�her � � lbs Total AvprayV65A0 lbs T8EATHEKT VOLUME DF LA80ON Vol�Ue = 106560 lbs. ALN z T/o�t�n� \�\me(CR/lh. Treatmeot Vn1ume Volumn = �nsme top (fep�) luside top width (fsU 128.V Top of dike p��a�ion (fe* ) 96.6 Buttom of iogoo: ele��ion <��t> O6.6 Freehoard <�eet) i.O Side s2opes (ieside ia���n) 2.6 � � Udl 0{ SS/END2 SS/SlDE� SS/SIDB L[�GT� 9lDTH UEP[H ��0F0P �cmsry L[NG H * 8IDTH = 168.V 76.O l2768 (AREA OF ��0�> \V|.4 99.� 7600.64 (A�[A 8F MlDSECTIUN * 4> 26377.4 76�V0.6 \276O.0 �.5 Vol�� = O,O cub|c fee. ��lNAG[ AREA� Lag on h�p of d��e) Length * Width = Duildi�� (nmf and lnt we�er) 2373.V s�are �e� 0eocrihe thi� orea. square fee� �esign temporary �torage od to be 00 5�. Volome nf woste nroduced Feces � urin� production in yal./day per 135 lh. ALW �.37 Vo�ume = �06560 lb�. ALN/�35 !bs ALH * 1.37 go}/day �80 days Volome ` l94�4Y.6 ga}s. or 26V22.7 cubic feet 5D. Volume of waxh wa�er Thia i� �a amu:nt of fre� wder uxed for waohinq Ooors or ml�le of fre� ma��r u�ed fnr a f}�� sys�om or excea wae-. tsat recirculate the lag000 water are for �n 5A. Volum* = A'O galluns/day * 18� ��s st��e/7.4B gaUons PPT CF | of rainfoll in exces of eva »ration �� Period of time whwn minfa!l a:���� evapor��ion by lar0eut �munt. 19� Jays excess rainfali 5.V inches * DA / 1� inches p*r ��ot 12722.1 cuhic ��� 50. Volof 25 ��r - 24 hour sbrw volume = 6.3 knches / 12 inches per �t2 V Z9.Smhic 5A. �. 5C. 5D. 26O�3 cubic �et 0 m�ic feet 12722 cubic �et �.v �ncocs t. bth9i?rh Rainfall in excess of evd-"rya_... 25 year - 24 to_ir r ainf 11 Slde .lope, lsidR top length Inside top idth Too o5 dikE elevation Bottom of lagoon elevation Total required volt:mu Ar tnai desidn ;1_- dad_ 5.0 inches 6,3 inches 3 2.6 - - �_ .ifeet 186.0 . 9&..6 feet ) 76.7 i2�� > 161335 cu. ft. '172869,i2 c , ft. _ca_.al%i high watertable elevation HW i=-=, ";jtlA teat 11�d{.1R►Ci J6` _ = iiSl eie ) 7�9- -, TES` )tr i e = t Die{ Must be . or = .. min: req_ trea ..._ ei. - �L.J Steer Required minimum tj eeatmRn b'a ) 10656 Volume at _£_!p pumping elevation .. 112-7; Y ft, Start tnl:oi ii eie - 95,0 feet Must e at1bottom of freeboard s =-J yr. rainfall Actual volume less 25 yr - 24 hr rain aia.54b39 co, it Volume at start pumping a i n 1 157357 cu. ft. Required volume v_ be poiBped , 88745 cu. ft. Actual pumped 45086 ;in. t iii;;ie__ E=1 soil liner when regu irer`,R, i:_i ";Feet Must or _ to the -.UT 7. DESIGNED V i . APPROVED _L! 2Y NOTE: SEE ATTACHED HED WASTE UTILIZATION P° rick 65\ .=1 k: C.:4=as s 4.4 Ve.k neik 11.A. Li'5n 0 -1 ro v s CO 5 co a a C - m o ro (D "D < o n -5' o ma) 0 c ECrn al co ro D o'co •na99 ad!d PRRn4 1.19AUI (SSIZ) SO N 'uouoH 40� < CT) N @ 0 ro 0:5 •• -.. m m co- ro a. cnpm co. : :a a. : n . a -nee efieiols u6rsap �e;ol is) 0 0' 3 CQ Cr) limo EC 0 tri 0 > > 0 0u o 0 o xi 0 V) z CJ) 0 N 0 Cn m CD Immo (U13o Z 2 6A