HomeMy WebLinkAboutNCC211626_ESC Approval Submitted_20210324RECEIVED APR 0 1 2019
PITT COUNTY
PLANNING & DEVELOPMENT DEPARTMENT
DEVELOPMENT SERVICES BUILDING
1717 W. 5" STREET
GREENVILLE, NORTH CAROLINA 27834-1696 JAMES F. RHODES, A1CP
Cag TELEPHONE: (252) 902-3250 DIRECTOR
FAX: (252) 830-2576
March 27, 2019
PEI-L 7Fk r, -4,r SC H2ACn-,
rZS2-1o2 -32-<-S3
Viscus Development, LLC
PO Box 3353
Greenville, NC 27836
Dear Mr. Evans:
This is to advise you that the Technical Review Committee conditionally approved your soil erosion and
Sedimentation control plan and construction plan for COUNTRY CLUB CREEK PHASE 1 on March 27,
2019. Copies of the draft minutes from the meeting will be available upon request prior to the next
Technical Review Committee meeting. Enclosed please find a copy of the conditionally approved plan
and the review agencies' conditions and requirements placed on the approval. Also included are general
comments concerning the site.
This letter serves as your permit to begin land -disturbing activities. As stipulated on the financial
responsibility form, you are responsible for ensuring compliance with all aspects of the approved plan
and the Pitt County Soil Erosion and Sedimentation Control Ordinance. Your primary objectives
include, but are not limited to, preventing offsite sedimentation, preventing sediment from entering
watercourses, and establishing vegetation on all disturbed areas within 7-14 calendar days, following
any completion of a phase of grading. Beginning March 10, 2003, all approved projects will receive a
National Pollutant Discharge and Elimination System (NPDES), Phase II construction permit. This
permit contains monitoring requirements and is enforced by the Division of Water Quality (252) 946-
6481.
Please be aware that your project will be covered by the enclosed NPDES Construction
Stormwater General Permit NCGO10000. Please become familiar with all the requirements and
conditions of this permit in order to achieve compliance.
Upon discovery of noncompliance by our office, the following actions may be taken:
1. No further permits for building or other construction will be issued.
2. The authority to continue construction, other than for erosion control measures, will be
terminated.
3. Penalties of up to $5000 per day may begin to accrue. Failure to immediately comply
upon notice of noncompliance will result in injunctive and/or criminal action.
Other Comments:
4. This erosion control plan shall expire three years following the date of approval if no land,
disturbing activity has been undertaken.
5. The Division of Water Quality may pursue legal action against you in order to enforce
requirements of the NPDES, Phase II permit.
6. The Pitt County Soil Erosion and Sedimentation Control Ordinance authorizes County
officials to inspect sites to ensure compliance with the Sedimentation Pollution Control
Act.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the
job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply
to this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project. Construction shall not begin until an onsite
preconstruction meeting has taken place.
If you need further information or assistance, please contact me at (252) 902-3250.
Sincerely,
i
Mark Nottingham, AICP, CFM
Planner III
cc: Rivers and Associates, Inc.