HomeMy WebLinkAbout20210289 Ver 1_Modification Request_20210317Staff Review For
Updated September 4, 2020
Staff Review
Does this application have all the attachments needed to accept it into the review process?*
c Yes No
Comments:
Please resubmit this with all the uploaded attachments you have included in this
submittal PLUS the PCN application. This can not be processed without the PCN
attached as well.
Rease type in reason why this project can not be reviewed.
Project Submittal Form
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type:*
✓ For the Record Only (Courtesy Copy)
✓ New Project
✓ Modification/New Project with Existing ID
✓ More Information Response
✓ Other Agency Comments
✓ Pre -Application Submittal
✓ Re-Issuance\Renewal Request
✓ Stream or Buffer Appeal
Pre -Filing Meeting Information
Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not
be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in
accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project
proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section
121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was
submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read
more information on when this form is needed prior to application submission or here to view the form.
Attach documentation of Pre -Filing Meeting Request here:
ColiceHall_DWR_PMR.pdf
Date for Meeting Request 2/9/2021
ID#
Project Contact Information
Name: Douglas Taylor
Who is submitting the inforrration?
Email Address: Douglas.Taylor@sunenergy1.com
Project Information
Existing ID #:
20210289
20170001 (no dashes)
Project Name: Colice Hall
Is this a public transportation project?
r Yes
a No
55.63KB
Version
Existing Version:
2
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
County (ies)
Hertford
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach docurrent
08499a - Colice Hall Solar Wetland Crossing
1.03MB
Documents - 2021-02-08.pdf
08499a - Colice Hall Solar Wetland Crossing
765.15KB
Drawings - 2021-02-08.pdf
Colice Overhead Exhibit 03172021.pdf 933.62KB
Semi -trailer Turn Radius Spec.pdf 54.58KB
WB-62 Colice Hall Ln Inside Turn.pdf 321.73KB
WB-62 Colice Hall Ln Outside Outside Turn.pdf 321.75KB
Only pdf or krre files are accepted.
Describe the attachments
or comments:
Here are all of the documents needed for the information request, from Anthony Scarbraugh, regarding the
Colice Hall PCN. Our justification for not being able to avoid impacting the wetlands is that we have no other
access to the Simons property. The semi -trailer spec and Outside/Inside Turn documents illustrate this. The
overall view of the property can be found on page 2 of the Wetland Crossing Documents, for further
illustration.
I have also included the drawings and narrative that I don't think were originally submitted, as well as the utility
pole map and detail per his request.
The total wetland impacts are .39ac. and the stream impacts are 60 feet permanent/ 90 feet temporary, as
these were not listed on the wetland impact plans.
Sign and Submit
17 By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to
the best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
Submittal Date: Is filled in autonetically.
Land Planning – Engineering – Surveying – Environmental – Construction Management
P.O. Box 3989, 115 W. Saint Clair St., Kill Devil Hills, North Carolina 27948
Phone: 252-441-2113 www.AlbemarleAssociates.com Fax: 252-441-0965
Colice Hall Solar
Summary of Analysis of Horse Swamp / Wetland Crossing
February 8, 2021
The Colice Hall Solar Farm consists of two parcels of land, with the north parcel having access
via roadway frontage on East Modlin Road (SR1130) and the south parcel being accessible
by Colice Hall Lane. The two parcels are separated by a wooded wetland area surrounding a
drainage ditch named “Horse Swamp”. Colice Hall Lane is a narrow (14’ wide) gravel drive
with obstructions on either side of the access along US13 which make it not accessible by
larger vehicles needed to construct and maintain the solar farm. Therefore, in order to facilitate
overhead transmission lines and access between the south and north parcel a 26’ wide access
road is required to cross a wetland area and Horse Swamp.
The crossing has been designed to minimize wetland impacts while maintaining drainage.
Horse Swamp runs along the northwest edge of the south parcel with the upstream extending
west across NC11 and collecting runoff from the land bounded by NC11, SR1106 and
SR1130. Based upon USGS maps, aerial photography and the delineation of the drainage
area for Horse Swamp in the Hertford County GIS maps, the contributing drainage area is
approximately 1062 acres at the location the crossing will be provided. Due to the large
drainage area, the SCS TR-55 method was used to estimate the peak flow for a 10-year
rainfall event which is calculated to be 190 cfs. This was calculated considering soil types and
land uses to determine the curve number (CN=80).
Two 60” HDPE culverts are being provided within Horse Swamp to allow for a hydraulic
connection within the ditch beneath the access road based upon the hydraulic analysis using
HY-8. This analysis indicates the culvert can pass the 10-yr rainfall event without overtopping
the top of the access route. I spoke with Michael Hill within the NCDOT District 2 Resident
Engineer’s Office in Ahoskie and he indicated that the NC11 culvert crossing upstream of this
location consisted of (3) 42” culverts while the US13 crossing downstream had (2) 60”
culverts, thus providing confirmation of the culvert sizing.
The outlet velocity is calculated to be 5.67 ft/sec and thus rip-rap should be provided for long
term stabilization. The culvert invert is to be placed 12” below the bottom of the ditch as
required for culverts 48” or larger under Nationwide Permits. Attached support data for this
report includes:
· Drainage Area Soils Map and Table
· Weighted CN Calculations
· Time of Concentration Calculations
· Peak Discharge Calculations (10 year & 25 year)
· HY-8 Summary Table
Soil Map—Hertford County, North Carolina
(Colice Hall Wetland Crossing Drainage Area)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/2/2021
Page 1 of 34019300401970040201004020500402090040213004021700402210040193004019700402010040205004020900402130040217004022100317200317600318000318400318800319200319600320000320400320800321200321600
317200 317600 318000 318400 318800 319200 319600 320000 320400 320800 321200 321600
36° 19' 39'' N 77° 2' 15'' W36° 19' 39'' N76° 59' 10'' W36° 18' 2'' N
77° 2' 15'' W36° 18' 2'' N
76° 59' 10'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84
0 1000 2000 4000 6000
Feet
0 300 600 1200 1800
Meters
Map Scale: 1:21,100 if printed on A landscape (11" x 8.5") sheet.
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
CaA Caroline fine sandy loam, 0 to
2 percent slopes
145.1 13.0%
CaB Caroline fine sandy loam, 2 to
6 percent slopes
26.5 2.4%
CrA Craven fine sandy loam, 0 to 1
percent slopes
85.4 7.7%
CrB Craven fine sandy loam, 1 to 4
percent slopes
9.9 0.9%
CsA Craven-Urban land complex, 0
to 2 percent slopes
2.4 0.2%
GoA Goldsboro fine sandy loam, 0
to 2 percent slopes
4.7 0.4%
LF Leaf loam 817.7 73.4%
Ln Lenoir loam 22.6 2.0%
Totals for Area of Interest 1,114.4 100.0%
Soil Map—Hertford County, North Carolina Colice Hall Wetland Crossing
Drainage Area
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/2/2021
Page 3 of 3
Colice Hall Solar Horse Swamp / Wetland Crossing
Drainage Area Curve Number
total area 1062 ac
Soil Group Land Use CN %
CaA C farm 88 13.0%11.44
CaB C farm 88 2.4%2.112
CrA C farm 88 7.7%6.776
CrB C farm 88 0.9%0.792
CsA C industrial 91 0.2%0.182
GoA B woods (good)55 0.4%0.22
LF D woods (good)77 73.4%56.518
Ln C residential (1/2)80 2.0%1.54
100.0%79.58
TR55 Tc Worksheet
Hydraflow Express by Intelisolve
SCS
Colice Hall Solar - Horse Swamp Crossing
Description A B C Totals
Sheet Flow
Manning's n-value = 0.800 0.011 0.011
Flow length (ft) = 300.0 0.0 0.0
Two-year 24-hr precip. ((in)) = 3.57 0.00 0.00
Land slope (%) = 0.08 0.00 0.00
Travel Time (min) = 308.92 + 0.00 + 0.00 = 308.92
Shallow Concentrated Flow
Flow length (ft) = 430.00 0.00 0.00
Watercourse slope (%) = 0.08 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) = 0.46 0.00 0.00
Travel Time (min) = 15.70 + 0.00 + 0.00 = 15.70
Channel Flow
X sectional flow area ((sqft)) = 676.00 5625.00 0.00
Wetted perimeter ((ft)) = 13.60 26.90 0.00
Channel slope (%) = 0.07 0.15 0.00
Manning's n-value = 0.045 0.045 0.015
Velocity (ft/s) = 1.35 2.55 0.00
Flow length (ft) = 5650.0 7340.0 0.0
Travel Time (min) = 69.63 + 47.99 + 0.00 = 117.62
Total Travel Time, Tc .............................................................................. 442.00 min
Hydrology Report
Hydraflow Express by Intelisolve Friday, Feb 5 2021, 10:32 AM
Colice Hall Solar - Horse Swamp Crossing
Hydrograph type = SCS Peak discharge (cfs) = 190.23
Storm frequency (yrs) = 10 Time interval (min) = 1
Drainage area (ac) = 1062.000 Curve number (CN) = 79
Basin Slope (%)= See Worksheet Hydraulic length (ft)= See Worksheet
Tc method = TR55 Time of conc. (min) = 442
Total precip. (in) = 5.48 Storm Distribution = Type III
Storm duration (hrs) = 24 Shape factor = 200
Hydrograph Volume = 12,401,300 (cuft); 284.695 (acft)
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
Q (cfs)
Time (hrs)
Runoff Hydrograph
10-yr frequency
Runoff Hyd - Qp = 190.23 (cfs)
Hydrology Report
Hydraflow Express by Intelisolve Friday, Feb 5 2021, 10:33 AM
Colice Hall Solar - Horse Swamp Crossing
Hydrograph type = SCS Peak discharge (cfs) = 260.74
Storm frequency (yrs) = 25 Time interval (min) = 1
Drainage area (ac) = 1062.000 Curve number (CN) = 79
Basin Slope (%)= See Worksheet Hydraulic length (ft)= See Worksheet
Tc method = TR55 Time of conc. (min) = 442
Total precip. (in) = 6.79 Storm Distribution = Type III
Storm duration (hrs) = 24 Shape factor = 200
Hydrograph Volume = 16,922,710 (cuft); 388.492 (acft)
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
Q (cfs)
0.00 0.00
40.00 40.00
80.00 80.00
120.00 120.00
160.00 160.00
200.00 200.00
240.00 240.00
280.00 280.00
Q (cfs)
Time (hrs)
Runoff Hydrograph
25-yr frequency
Runoff Hyd - Qp = 260.74 (cfs)
HY-8 Analysis Results
Customized Table
Culvert Crossing: Colice Hall Wetland Crossing
Discharge
Names
Total
Discharge
(cfs)
Culvert
Discharge
(cfs)
Headwater
Elevation (ft)
Outlet Depth
(ft)
Tailwater
Depth (ft)
Outlet
Velocity (ft/s)
Tailwater
Velocity (ft/s)
10 190.00 190.00 43.02 4.00 5.56 5.67 2.96
25 261.00 210.86 44.10 4.00 6.36 6.29 2.94
Albemarle & Associates, Ltd.
115 West St. Clair Street
P.O. Box 3989
Kill Devil Hills, NC 27948
Phone: (252) 441-2113
Fax: (252) 441-0965
www.AlbemarleAssociates.com
Cert. of Licensure No. C-1027
This document is the
PROPERTY of Albemarle &
Associates, Ltd. All rights
reserved. Any unauthorized
use or alteration is prohibited.
ACCESS PATH AT WETLANDS PLAN
SUN ENERGY 1, LLC
COLICE HALL SOLAR
Albemarle & Associates, Ltd.
115 West St. Clair Street
P.O. Box 3989
Kill Devil Hills, NC 27948
Phone: (252) 441-2113
Fax: (252) 441-0965
www.AlbemarleAssociates.com
Cert. of Licensure No. C-1027
This document is the
PROPERTY of Albemarle &
Associates, Ltd. All rights
reserved. Any unauthorized
use or alteration is prohibited.
ACCESS PATH AT WETLANDS DETAILS
SUN ENERGY 1, LLC
COLICE HALL SOLAR SEAL028572N
O
R
TH CAROLINAP
R
OFESSIONALENGINEERMICHAEL J. MORW
AY
SEAL028572N
O
R
TH CAROLINAP
R
OFESSIONALENGINEERMICHAEL J. MORW
AY
K:\Active Projects\08499 - Colice Hall, Ahoskie\Cadd Files\08499A - Sheets.dwg, 2/9/2021 9:55:27 AM
Albemarle & Associates, Ltd.
115 West St. Clair Street
P.O. Box 3989
Kill Devil Hills, NC 27948
Phone: (252) 441-2113
Fax: (252) 441-0965
www.AlbemarleAssociates.com
Cert. of Licensure No. C-1027
This document is the
PROPERTY of Albemarle &
Associates, Ltd. All rights
reserved. Any unauthorized
use or alteration is prohibited.
ACCESS PATH AT WETLANDS DETAILS
SUN ENERGY 1, LLC
COLICE HALL SOLAR SEAL028572N
O
R
TH CAROLINAP
R
OFESSIONALENGINEERMICHAEL J. MORW
AY
K:\Active Projects\08499 - Colice Hall, Ahoskie\Cadd Files\08499A - Sheets.dwg, 2/9/2021 9:57:20 AM
A
OVERHEAD EXHIBIT
0 50'100'
SCALE: 1" = 50'
25'
34.5 Overhead Pole
Overhead Right of Way
15 ft Off Center Line
LEGEND
PROPERTY BOUNDARY
FENCE
GATE
PV ARRAY
OVERHEAD CONDUCTORS
WETLAND
SITE ACCESS ROAD
Typical 34.5 kV Line Pole
34.5 Overhead Lines
PROJECT NAMECJMLATEST REVISIONJOB NO.NO.DATEDESCRIPTIONCHECKEDDRAWNDRAWING TITLE 192 Raceway Dr.Mooresville, NC 28117DRAWING NO.COLICE HALL SOLAR, LLC17 MWAC PV POWER PLANT INAHOSKIE, NC0DS(T) 704-662-0375(F) 704-662-0352DRAWING LOGKEY PLAN
1217 MAR 2021345678AB2-099
wB-62 (AB-1J DESIGN VEHICLE
RADIUS f 45 ft (13. 7 m]
SCALE ■ 1 : 0 [ 1 : 001
l
of
orr
1
2. 5.9
r
0
r.
w
/ 4
0 1
1 � .o .
x
0
IP.40 Ps"
i 0
le."
e
4'
1
d
, "1
- , ,
, , .
-- - --. ILk
N.
40% tip 141 41
+�- 1."'-
T. 9 qt
E2.41 MIEN
Nom
11
ti
i
1
tormIn9 Terapiote for m1- Tr& Ier with b2 ft (18.9 m)
wheelbase (Radfusa45 ft (13.7 m))
Colice Hall Ln.
Hwy 13 Center Line
HWY 13 R-O-WHWY 13 R-O-WN
Colice Hall Ln.
Hwy 13 Center Line
HWY 13 R-O-WHWY 13 R-O-WN
DWR Pre-Fil ing Meeting Req u est Form
Contact Name *
Contact Email Addre ss *
Proje ct Owne r *
Proje ct Name *
Proje ct County *
Owne r Addre ss:*
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Ple ase list all e xisting proje ct ID's associate d with this proje cts.*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
Please give a couple of dates you are available for a meeting.
Jeffery McDermott
jeffrey.mcdermott@sunenergy1.com
Colice Hall Solar, LLC
Colice Hall Solar
Hertford
City
Mooresvillle
State / Province / Region
NC
Postal / Zip Code
28117
Country
United States
Street Address
192 Raceway Drive
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
SAW-2020-01253
Chris Pullinger
The proposed solar site is in Hertford county, located off of Colice
Hall Lane. The project parcels encompass approximately 54 acres.
The parcels are owned by John David Simons III, Russel P Harrell,
and Byrum’s Farm Service Center, Inc.
2/16/2021
2/17/2021
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature *
Submittal Date
2/18/2021
2/11/2021
2/23/2021
08499a - Colice Hall Solar Wetland Crossing
Documents - 2021-02-08.pdf
1.03MB
08499a - Colice Hall Solar Wetland Crossing
Drawings - 2021-02-08.pdf
766.26KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
2/9/2021