HomeMy WebLinkAboutNCC211760_ESC Approval Submitted_20210324Town of Southern Pines
140 Memorial Park Court
k Southern Pines, NC 28387
(910) 692-1983
21-0318 Approval for Minor Erosion and Sediment Control
SITE ADDRESS: 261 CH MPIONS RIDGE DR ISSUED: 03/1012021
PROJECT NAME: 261
Ch mpions Ridge Dr. EXPIRES:
PARCEL: 857200135446 LAT.- 35.18751 LONG:-79.42995
APPLICANT: OWNER: FINANCIALLY RESPONSIBLE PARTY.
INTEGRITY BUILDERS OF TIIE INTEGRITY BUILDERS OF THE
SANDHILLS LLC SANDHILLS LLC INTEGRITY BUILDERS OF THE SANDHILLS LLC
10205 NC HWY 15-501 10205 NC HWY 15-501 10205 NC HWY 15-501
SOUTHERN PINES, NC 2838 SOUTHERN PINES, NC 28387 SOUTHERN PINES, INC 28387
CITY: SOUTHERN PINES COUNTY: MOORE ACRES APPROVED: 0.75 MIN: NO
RECEIVING 1NATER: UNNA ED RIVER BASIN: LUMBER STREAM CLASSIFICATION: C
TRIBUTARY
DATE RECEIVED BY TOSP:1021-03-09 PLAN TYPE. STANDARD
The review of the above ref renced erasion control plan has been completed and the plan submitted has been found
acceptable.
Amendments to the plan sh uld be submitted to this office under the same procedure as followed for the original plan.
Title 15A NCAC 413 .0118(a) ar d the NCGO1 permit require that the following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the OC, once it is received.
3. Records of inspections made during the previous 30 days.
This project is subject to the National Pollutant Discharge Elimination System (NPDFS). As of April 1, 2019, all new construction activities
are required to complete and stibmit an electronic Notice of Intent (NOI) from requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Sor water General Permit. This form MUST be submitted prior to the commencement of any land disturbing
activity on the above named project. The NO] form may be accessed at deq.nc.govINCGO1. After you submit a complete and correct NO]
Form, a COC wiil be emailed to you within three business days. DEMLR will charge a fee for coverage under the NCGOf permit. This fee
is to be sent to the DEMLR Sto mwater Central Office staff in Raleigh. Please see North Carolina Department of Environmental Quality
(NCDEQ) documentation regar ing procedures for obtaining permit NCGO10000. Refer to the NCDEQNCG01 Ground Stabilization and
Materials Handling Sheet for ailditional details on compliance with these requirements. Should you have questions contact the Division of
Energy, Mineral and Land Resources, 919-707-3639.
Acceptance and approval of t4 plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules
In addition, local city or county or rules may also apply to this land -disturbing activity. This approval does not supersede any
other permit or approval.
This Approval Shall Expire:
1, There is no substantial construction, erection, alteration, excavation, demolition or similar work authorized by such permits within one (1)
year after issuance.
2. Work has commenced, butt ere is no substantial progress on the project for a period of one (1) year.
3. The project has not been completed within two (2) years of issuance of the permit.
Authorized Signature: r
9 (��� Date: 03/11/2021
Town Official Date