Loading...
HomeMy WebLinkAbout090210_30 Day POA_20210315PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: - 33 County: Blare() j� Facility Name: I 6-Doc/en hn rhtag Certified Operator Name: David en Operator # 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the darn for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): aa Level (inches): I iJ a 3 2. Check all applicable items ey-k(AS(ons 12wni 2 In 121 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 3 1 i31 21 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. IJ 0 v e 0 d a-...-- r) Facility Owner/Manager (print) Facility Owner/Manager (signature) (300419-11/990 Phone: Date: 3,115121 PoA Cover Page 2/21/00 • II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: David Gooden 1 2 3 n. lines 1 + 2 + 3 + 4 + 5+ 6= line m = 282.3 Ib PAN line m = 489.9 Ib PAN line m = 456.2 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 1228.5 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 4696 14A bermudagrass graze 3.70 150.00 555.0 Mar -Sept 4696 14B bermudagrass graze 3.60 150.00 540.0 Mar -Sept Mar -Sept 4696 15A overseed graze 3.30 150.00 495.0 ** guesimate on PAN left 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1590.0 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = NARRATIVE: 1228.5 Ib. PAN 1590.0 Ib. PAN -362 Ib. PAN Pumping will begin as soon as field conditions as allow. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): David Gooden 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 18.0 19.0 inches inches 1.0 inches 95836 ft2 59738 gallons 180 days volume-otwaste-prnducedaccording to structural desig h. current herd # 4410 certified herd # 4410 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/22/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 145388 ft3 0 58333 ft3 ft3 253972 gallons 0.90 Ibs/1000 gal. 282.3 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): David Gooden 3 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2940 certified herd # 24.0 28.0 inches inches 4.0 inches 81600 ft2 203456 gallons 180 96925 2940 days ft3 actual_waste produced = currentherd = 95925 ' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/22/2000i REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 64033 51680 ft3 ft3 265089 gallons 0.80 Ibs/1000 gal. 374.8 Ibs. PAN PoA (30 Day) 2/21/00