Loading...
HomeMy WebLinkAbout090006_30 Day POA_20210317PLAN OF ACTION (PoA) FOR HIGH FREEEOARAT ANID_ FACILITIES Facility Number:((`` 19 _ Co Facility Name: 3aVdh !IS County: Oozier) Certified Operator Name: G ° /') Merin Operator 100ct3(12 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 13 Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check all applicable items CylinSb/t 13fiam ,1r1/8%zl Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are within acceptable ranges. ----Liquid�evehs--v ithirI-tlie 25-year 24-I }our slut m el ne or more s ructures. A 30-day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 3 ) ill 2 I 1 hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. 69ren f'lelvin Facility Owner/Manager (print) /v Facility Owner/Manager (signature) Phone: ` o -27 (v - 11,80 Date: 3) 17 l 2 j PoA Cover Page 2/21/00 62/ II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Sandhills Farm 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n.lines 1+2+3+4+5+6= line m = 1527.3 Ib PAN line m = lb PAN line m = Ib PAN line m = Ib PAN fine m = Ib PAN line m = Ib PAN 1527.3 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' T1127 F1 3 bermuda 4.40 150.00 660.0 Mar -Sept T1127 F1 1B bermuda 4.40 150.00 660.0 Mar -Sept Mar -Sept T1127 F1 6 bermuda 4 40 150;00- 660.0 T1127 F1 4 bermuda 2.20 150.00 330.0 Mar -Sept T1127 F1 5 bermuda 4.40 150.00 660.0 Mar- Sept T1127 F1 7 bermuda 4.40 150.00 660.0 Mar- Sept ** did not use all pulls/fields to meet PAN balance. Guestimates 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crops remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 3630.0 Ib. PAN 1527.3 Ib. PAN 3630.0 Ib. PAN -2103 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will pump as soon as conditions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Sandhills Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) 206976 ft2 17.0 19.0 inches inches 2.0 inches e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 8800 certified herd # 258030 gallons 180 290117 8800 days ft3 actual-waste-produ d—=—current-herd-#- x -line-g = 290117 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 2/15/2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 124775 ft3 517232 gallons 1.97 Ibs/1000 gal. 1527.3 Ibs. PAN PoA (30 Day) 2/21/00