HomeMy WebLinkAbout090006_30 Day POA_20210317PLAN OF ACTION (PoA) FOR HIGH FREEEOARAT ANID_ FACILITIES
Facility Number:((`` 19 _ Co
Facility Name: 3aVdh !IS
County:
Oozier)
Certified Operator Name: G ° /') Merin Operator 100ct3(12
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 13
Lagoon Name/Identifier (ID):
Spillway (Yes or No):
Level (inches):
2. Check all applicable items CylinSb/t 13fiam ,1r1/8%zl
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached Hydraulic and agronomic balances are within
acceptable ranges.
----Liquid�evehs--v ithirI-tlie 25-year 24-I }our slut m el ne or more s ructures. A 30-day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 3 ) ill 2 I
1 hereby certify that 1 have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
69ren f'lelvin
Facility Owner/Manager (print)
/v
Facility Owner/Manager (signature)
Phone: ` o -27 (v - 11,80
Date: 3) 17 l 2 j
PoA Cover Page 2/21/00
62/
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Sandhills Farm
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
n.lines 1+2+3+4+5+6=
line m = 1527.3 Ib PAN
line m = lb PAN
line m = Ib PAN
line m = Ib PAN
fine m = Ib PAN
line m = Ib PAN
1527.3 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
T1127 F1
3
bermuda
4.40
150.00
660.0
Mar -Sept
T1127 F1
1B
bermuda
4.40
150.00
660.0
Mar -Sept
Mar -Sept
T1127 F1
6
bermuda
4 40
150;00-
660.0
T1127 F1
4
bermuda
2.20
150.00
330.0
Mar -Sept
T1127 F1
5
bermuda
4.40
150.00
660.0
Mar- Sept
T1127 F1
7
bermuda
4.40
150.00
660.0
Mar- Sept
** did not use all pulls/fields to meet PAN balance. Guestimates
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) =
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
x. Crops remaining PAN balance (line v from section III) =
y. Overall PAN balance (w - x) =
3630.0 Ib. PAN
1527.3 Ib. PAN
3630.0 Ib. PAN
-2103 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Will pump as soon as conditions allow.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Sandhills Farm
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation) 206976 ft2
17.0
19.0
inches
inches
2.0 inches
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. current herd #
8800
certified herd #
258030 gallons
180
290117
8800
days
ft3
actual-waste-produ d—=—current-herd-#- x -line-g = 290117 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
2/15/2021
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0
124775
ft3
517232 gallons
1.97
Ibs/1000 gal.
1527.3 Ibs. PAN
PoA (30 Day) 2/21/00