HomeMy WebLinkAbout20070245 Ver 8_MARSOC PCN Rev 3-23-21_20210323Staff Review
Does this application have all the attachments needed to accept it into the review process?*
r Yes r No
ID#* Version* 8
20070245
Is this project a public transportation project?* r Yes
r No
Reviewer List:* Rick Trone:eads\rvtrone
Select Reviewing Office:* Central Office - (919) 707-9000
Does this project require a request for payment to be sent?*
r
Yes
r
No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: * r
For the Record Only (Courtesy Copy)
r
New Project
r
Modification/New Project with Existing ID
r
More Information Response
r
Other Agency Comments
r
Pre -Application Submittal
r
Re-Issuance\Renewal Request
r
Stream or Buffer Appeal
Is this supplemental information that needs to be sent to the Corps?*
r Yes r No
Project Contact Information
Name: Kim Williams
Who is subrritting the inforrration?
Email Address: kwilliams@lmgroup.net
Project Information
Existing ID #:
20070245
20170001(no dashes)
Existing Version:
8
1
Project Name: MARSOC Motor Transportation Maintenance Expansion
Is this a public transportation project?
r Yes
r No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
County (ies)
Onslow
Please upload all files that need to be submited.
C7ickthe upload button or drag and drop files here to attach document
MARSOC PCN Rev 3-23-21.pdf 329.19KI3
Only pdf or lm7 files are accepted.
Describe the attachments
or comments:
PCN includes revised point of contact and owner representative information.
Sign and Submit
V By checking the box and signing box below, I certifythat:
■ I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to
the best of my knowledge and belief.
■ I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
■ I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
■ I intend to electronically sign and submit the online form.
Signature:
r�r'ltct
Submittal Date: Is filled in autorretically.
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 26, 2020 Ver 3.3
Please note: fields marked with a red asterisk *below are required. You will not be able to submit the form until all mandatory questions are answered.
Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form.
Below is a link to the online help file.
https://edocs.deq.nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf (https://edocs.deq.nc.gov/WaterResources/0/doc/603610/Page1.aspx)
County (or Counties) where the project is located:*
Add additional county
Is this a NCDMS Project *
Is this project a public transportation project?*
1a. Type(s) of approval sought from the Corps:*
Has this PCN previously been submitted?*
Please provide the date of the previous submission.*
1b. What type(s) of permit(s) do you wish to seek authorization?*
This form may be used to initiate the standard/individual permit process with the Corps. Please contact your Corps representative concerning submittals for standard permits.
All required items that are not provided in the E-PCN can be added to the miscellaneous upload area located at the bottom of this form.
1c. Has the NWP or GP number been verified by the Corps?*
1d. Type(s) of approval sought from the DWR:*
A. Processing Information
Onslow
Yes No
Click Yes, only if NCDMS is the applicant or co-applicant.
Yes No
This is any publicly funded by municipal,state or federal funds road, rail, airport transportation project.
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Yes
No
1/21/2021
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
Yes No
check all that apply
401 Water Quality Certification - Regular 401 Water Quality Certification - Express
Non-404 Jurisdictional General Permit Riparian Buffer Authorization
Individual Permit
Pre-Filing Meeting Information
1e. Is this notification solely for the record because written approval is not required?
*
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after-the-fact permit application?*
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?*
1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)?*
1j. Is the project located in a designated trout watershed?*
Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx
(http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx)
1a. Who is the Primary Contact?*
1b. Primary Contact Email:*
1c. Primary Contact Phone:*
1d. Who is applying for the permit?*
1e. Is there an Agent/Consultant for this project?*
Before submitting this form please ensure you have submitted the Pre-Filing Meeting Request Form as we will not be able to accept your application without this important first
step. The Pre-Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) “At least 30 days prior to submitting a certification request, the project
proponent shall request a pre-filing meeting with the certifying agency” and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include
documentation that a pre-filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here
(https://www.epa.gov/sites/production/files/2020-07/documents/clean_water_act_section_401_certification_rule.pdf) to read more information on when this form is needed prior
to application submission or here (https://edocs.deq.nc.gov/Forms/DWR-Pre-Filing-Meeting-Request)to view the form.
ID#Version
Pre-fling Meeting or Request Date *
Attach documentation of Pre-Filing Meeting Request here:*
20070245 7
11/9/2020
×
Upload
Pre Filing Request.pdf (/Forms/handlers/downloadattachment.ashx?req=DownLoad&aid=562245&a…49.54KB
Yes No
Yes No
Yes No
If so, attach the acceptance letter from mitigation bank or in-lieu fee program.
Yes No
Click the upload button or drag and drop files here to attach document
FILE TYPE MUST BE PDF
×
Upload
Credit Reservation_MARSOC Camp Lejeune.doc.pdf (/Forms/handlers/downloadattachment.ashx?r… 135.2KB
Yes No
Yes No Unknown
Yes No
B. Applicant Information
Jessi Baker
jessi.baker@usmc.mil
(xxx)xxx-xxxx
(910)451-4542
Owner Applicant (other than owner)
(Check all that apply)
Yes No
2. Owner Information
Add another owner
4. Agent/Consultant (if applicable)
2a. Name(s) on recorded deed:*
2b. Deed book and page no.:
2c. Responsible party:
2d. Address *
2e. Telephone Number:*
2f. Fax Number:
2g. Email Address:*
US Government
(for Corporations)
Neal Paul, Deputy Public Works Officer; Marine Corps Install
City
Camp Lejeune
State / Province / Region
NC
Postal / Zip Code
28547
Country
USA
Street Address
1005 Michael Road
Address Line 2
(xxx)xxx-xxxx
(910)451-3228
(xxx)xxx-xxxx
neal.paul@usmc.mil
4a. Name:*
4b. Business Name:
4c. Address *
4d. Telephone Number:*4e. Fax Number:
4f. Email Address:*
Kim Williams
(if applicable)
Land Management Group
City
Wilmington
State / Province / Region
NC
Postal / Zip Code
28403
Country
USA
Street Address
3805 Wrightsville Avenue; Suite 15
Address Line 2
(910)452-0001
(xxx)xxx-xxxx
(910)452-0060
(xxx)xxx-xxxx
kwilliams@lmgroup.net
1a. Name of project:*
1b. Subdivision name:
1c. Nearest municipality / town:*
2a. Property Identification Number: 2b. Property size:
2c. Project Address
2d. Site coordinates in decimal degrees
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based
on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the
decimal place.)
Latitude:*Longitude:*
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
3b. Water Resources Classification of nearest receiving water:*
Surface Water Lookup (https://ncdenr.maps.arcgis.com/apps/webappviewer/index.html?id=6e125ad7628f494694e259c80dd64265)
3c. What river basin(s) is your project located in?*
Add another river basin
Agent Authorization Letter *
Please provide the Agent Authorization Letter if you are submitting this document.
FILE TYPE MUST BE PDF
Upload
C. Project Information and Prior Project History
1. Project Information
MARSOC Motor Transportation Maintenance Expansion
(if appropriate)
Camp Lejeune
2. Project Identification
(tax PIN or parcel ID)
N/A
(in acres)
~ 25
City
Camp Lejeune
State / Province / Region
NC
Postal / Zip Code
28547
Country
USA
Street Address
Rifle Range Road
Address Line 2
34.581693
ex: 34.208504
-77.450706
-77.796371
Stones Bay
SA; HQW
White Oak
3d. Please provide the 12-digit HUC in which the project is located.*
River Basin Lookup (http://ncdenr.maps.arcgis.com/apps/PublicInformation/index.html?appid=ad3a85a0c6d644a0b97cd069db238ac3)
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000).
Project History Upload
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
4f. List the total estimated acreage of all existing wetlands on the property:
4g. List the total estimated linear feet of all existing streams on the property:
4h. Explain the purpose of the proposed project:*
030203020209
Site supports existing MARSOC facilities. Other areas are undeveloped and forested. Some freshwater
wetlands exist throughout the site. Adjacent land use is undeveloped and forested or other Base facilities.
Yes No Unknown
SAW-2007-286-067
Click the upload button or drag and drop files here to attach document
File type must be PDF
××
Upload
2017 MARSOC USACE mod.pdf (/Forms/handlers/downloadattachment.ashx?req=DownLoad&aid=… 1.35MB
Original IP 2007.pdf (/Forms/handlers/downloadattachment.ashx?req=DownLoad&aid=562248&auth… 567.73KB
Click the upload button or drag and drop files here to attach document
File type must be pdf
Upload
Click the upload button or drag and drop files here to attach document
File type must be pdf
Upload
5 acres
(intermittent and perennial)
N/A
The purpose of the project is to complete the SOF consolidation into MARSOC’s Stone Bay Complex in order
to fulfill training and operational requirements. See attached narrative for additional details.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
4j. Please upload project drawings for the proposed project.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
7b. If yes, explain.
Please see attached narrative for overall project description. Construction limits will be cleared of vegetation
and fill material will be brought to the site to level the project areas as needed. See attached narrative for
additional details.
Click the upload button or drag and drop files here to attach document
File type must be pdf
Upload
Yes No Unknown
The project area was delineated many years ago. The JD is
Preliminary Approved Not Verified Unknown N/A
Example: SAW-2017-99999
Unknown
Click the upload button or drag and drop files here to attach document
File type must be PDF
Upload
Yes No
MARSOC is a large complex of buildings and its purpose and need has consistently evolved over time.
Therefore, impacts related to its development have been authorized in several permit modifications over
several years.
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related
activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don’t require pre-construction
notification.
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
"W." will be used in the table below to represent the word "wetland".
2a. Site #(?)*2a1 Reason (?)*2b. Impact type (?)*2c. Type of W.*2d. W. name *2e. Forested *2f. Type of
Jurisdicition (?)*
2g. Impact
area *
Add
2g. Total Temporary Wetland Impact
2g. Total Permanent Wetland Impact
2g. Total Wetland Impact
2h. Comments:
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then
individually list all open water impacts below.
4a. Site #*
(?)
4a1. Impact Reason 4b. Impact type (?)*(?)4c. Name of waterbody 4d. Activity type *4e. Waterbody type *4f. Impact
area *
Unknown
D. Proposed Impacts Inventory
Wetlands Streams-tributaries Buffers
Open Waters Pond Construction
1 Fill P Headwater Forest N/A Yes Both 0.110
(acres)
2 Fill P Headwater Forest N/A No Both 0.270
(acres)
3 Fill P Headwater Forest N/A Yes Both 0.580
(acres)
0.000
0.960
0.960
Wetland Impact W2 has already been installed but was not previously authorized.
O1 Fill for develop P N/A Fill Other 0.01
(acres)
O2 Fill for develop P N/A Fill Other 0.02
(acres)
Add another impact
4g. Total temporary open water Impacts:
4g. Total permanent open water impacts:
4g. Total open water impacts:
4h. Comments:
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
2c. If yes, mitigation is required by (check all that apply):
2d. If yes, which mitigation option(s) will be used for this project?
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased/Requested (attach receipt and letter)
Type: Quantity:
Add additional credits
O3 Fill for develop P N/A Fill Other 0.01
(acres)
O4 Fill for develop P N/A Fill Other 0.01
(acres)
0.00
0.05
0.05
Total impacts are actually 0.028 but table rounds up to nearest tenth.
E. Impact Justification and Mitigation
Please see attached narrative describing alternatives considered and avoidance and
minimization efforts.
A sedimentation and erosion control permit and stormwater permit will be obtained prior to
construction.
Yes No
DWR Corps
Mitigation bank Payment to in-lieu fee
program
Permittee Responsible
Mitigation
Bachelors Delight Mitigation Bank
Non-riparian wetland 2
Attach Receipt and/or letter
3c. Comments
NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS (https://ribits.usace.army.mil/ribits_apex/f?
p=107:27:2734709611497::NO:RP:P27_BUTTON_KEY:0) website.
*** Recent changes to the stormwater rules have required updates to this section .***
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
For a list of options to meet the diffuse flow requirements, click here
(https://files.nc.gov/ncdeq/Water%20Quality/Surface%20Water%20Protection/401/Buffer%20Clarification%20Memos/Options%20for%20Meeting%20Diffuse%20Flow%20Provisio
If no, explain why:
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT’s Individual NPDES permit NCS000250?*
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?*
To look up low density requirement click here 15A NCAC 02H .1003(2)
(http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental%20quality/chapter%2002%20-%20environmental%20management/subchapter%20h/15a%20ncac%2002
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state-approved local government
stormwater program?*
2d. Which of the following stormwater management program(s) apply (check all that apply):*
State Stormwater Programs *
Click the upload button or drag and drop files here to attach document
FILE TYPE MUST BE PDF
×
Upload
Credit Reservation_MARSOC Camp Lejeune.doc.pdf (/Forms/handlers/downloadattachment.ashx?r… 135.2KB
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
Yes No
Site is located in White Oak River Basin
Yes No
Yes No
Yes No
N/A - project disturbs < 1 acre
Hint: projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally-implemented stormwater programs through use of
community in-lieu programs should answer no to this question.
Local Government State
If you have a local government approval please include the SMP on their overall impact map.
Phase II Coastal Counties
HWQ or ORW Other
Comments:
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?*
1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final
approval letter.)*
NEPA or SEPA Final Approval Letter
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or
Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?*
2b. If you answered “yes” to the above question, provide an explanation of the violation(s):
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water
quality?*
3b. If you answered “no,” provide a short narrative description.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
Engineer is currently preparing a stormwater plan.
G. Supplementary Information
Yes No
Yes No
Yes No
Click the upload button or drag and drop files here to attach document
FILE TYPE MUST BE PDF
×
Upload
NEPA Info.pdf (/Forms/handlers/downloadattachment.ashx?req=DownLoad&aid=562252&authkey=… 38.95KB
Yes No
Some of the impacts shown on the site plan were installed prior to obtaining
authorization from the USACE and NCDWR, specifically at P-1288. Unfortunately,
wetland and channel impacts within this area were not discovered until after this project
Yes No
MARSOC is a large complex and its purpose and need has changed over time.
Modifications to existing Section 404/401 permits have been obtained as needed and
are looked at cumulatively. Impacts have been minimized as much as practicable and
Yes No N/A
4b. Describe, in detail, the treatment methods and dispositions (non-discharge or discharge) of wastewater generated from the proposed project. If the
wastewater will be treated at a treatment plant, list the capacity available at that plant.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
5d. Is another Federal agency involved?*
5e. Is this a DOT project located within Division's 1-8?*
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?*
5g. Does this project involve bridge maintenance or removal?*
Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf (http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-
SLOPES&apps.pdf)
5h. Does this project involve the construction/installation of a wind turbine(s)?**
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers,
etc.?*
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?*
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ (http://gis.ncdcr.gov/hpoweb/)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g.,
National Historic Trust designation or properties significant in North Carolina history and archaeology)?*
Site will tie into municipal wastewater treatment system.
Yes No
Yes No
Yes No Unknown
Yes No
Yes No
Yes No
Yes No
Yes No
The Base has an endangered species program that focuses on conservation and
protection of species and their management. While federally protected species are known
to occur on Base, none are known to occur within the specific project area.
Click the upload button or drag and drop files here to attach document
File type must be PDF
Upload
Yes No
NOAA EFH Mapper
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps:https://msc.fema.gov/portal/search (https://msc.fema.gov/portal/search)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
8c. What source(s) did you use to make the floodplain determination?*
Comments
Miscellaneous attachments not previously requested.
*
x The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief’; and
x The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable
period of time.
x I have given true, accurate, and complete information on this form;
x I agree that submission of this PCN form is a “transaction” subject to Chapter 66, Article 40 of the NC General Statutes (the “Uniform Electronic Transactions
Act”);
x I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the “Uniform Electronic Transactions Act”);
x I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
x I intend to electronically sign and submit the PCN form.
Full Name:*
Signature *
Date
The site has been investigated for cultural resources and contains no known
archaeological or historic sites.
Click the upload button or drag and drop files here to attach document
File must be PDF
Upload
Yes No
FEMA Flood Map Service website
Miscellaneous
Click the upload button or drag and drop files here to attach document
File must be PDF or KMZ
Upload
Signature
By checking the box and signing below, I certify that:
Sign
Date captured on form submission
Submit Save as Draft