Loading...
HomeMy WebLinkAboutNCC211390_ESC Approval Submitted_20210323ROY COOPER Governor MICHAEL S. REGAN,�; Secretary BRIAN WRENN NORTH CAROLINA Director Envimntental Quality February 16, 2021 LETTER OF APPROVAL WITH MODIFICATIONS City of Conover Attention: Donald Duncan, City Manager Post Office Box 549 Conover, North Carolina 28613 RE: Project Name: PPE -NC Initiative MSC Phase II Acres; Approved: 3.29 Project ID: CATA-2021-011 County: Catawba City: Conover Address: 5' Avenue South East River Basin: Catawba Stream Classification: Other Submitted By: , City of Conover Date Received by LQS: January 22, 2021 Plan Type: New Dear Mr. Duncan: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (CDC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the rcommencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOL Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr,gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the'NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. /-�QQ2� North Carolina Department of Environmental Quality I Division of Energy, Mineral and, Land Resources D Mooresville: Regional Office ( 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704.663,1699 Letter of Approval City of Conover February 16, 2021 Page 2 of 3 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change n the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated Sincerely, Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet c: Eagle Engineering Attention: Frank L. Gray, PE 2013A Van Buren Avenue Indian Trail, North Carolina 28079 Inspection Department Letter of Approval City of Conover February 16, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: PPE -NC Initiative MSC Phase II Project ID: CATAW-2021-011 County: Catawba 1. The new NCGOI Construction stormwater permit requires Ground Stabilization and Materials Handling and Self -Inspection, Recordkeeping and Reporting requirements on your plans. The NCGO1 compliance plan sheets for these can be found at https://deq,tic. gov/about/division s/energy- mineral-land-resources/energy-mineral-land-permits/stormwater-permits/construction-sw. � a o �J CD 0 N p C O (D r � d Ca. In, . pi • `-� UQ (D n UQ 0 'Cp p CD O �\ ., �A. l 1 (D N p n (D OilCOD CD cD ... CDN p cD (D (D O � y N r CD C Z Z CD (p A� �t GREATSF�! F' * 4 O t� �CD (AC/)� 0 0 w aw r " " a� an JCD M CD CD CD CD O CD w CD r wCD Q� w CD ar T �°,(Da��