February 16, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
City of Conover
Attention: Donald Duncan, City Manager
Post Office Box 549
Conover, North Carolina 28613
RE: Project Name: PPE -NC Initiative MSC Phase II
Acres; Approved: 3.29
Project ID: CATA-2021-011
County: Catawba
City: Conover
Address: 5' Avenue South East
River Basin: Catawba
Stream Classification: Other
Submitted By: , City of Conover
Date Received by LQS: January 22, 2021
Plan Type: New
Dear Mr. Duncan:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval with Modifications. The Modifications Required for
Approval are listed on the attached page. The enclosed Certificate of Approval must be posted at the job
site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (CDC) under the NCG010000 Construction
Stormwater General Permit. This form MUST be submitted prior to the rcommencement of any land
disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOL
Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr,gov or Paul Clark
at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to
you within three business days. Initially, DEMLR will not charge a fee for coverage under the'NCGOI
permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the
DEMLR Stormwater Central Office in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
/-�QQ2� North Carolina Department of Environmental Quality I Division of Energy, Mineral and, Land Resources
D Mooresville: Regional Office ( 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
704.663,1699
Letter of Approval
City of Conover
February 16, 2021
Page 2 of 3
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
n the information included on the form. In addition, it would be helpful if you notify this office of the
proposed starting date for this project.
Your cooperation is appreciated
Sincerely,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
c: Eagle Engineering
Attention: Frank L. Gray, PE
2013A Van Buren Avenue
Indian Trail, North Carolina 28079
Inspection Department
Letter of Approval
City of Conover
February 16, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: PPE -NC Initiative MSC Phase II
Project ID: CATAW-2021-011
County: Catawba
1. The new NCGOI Construction stormwater permit requires Ground Stabilization and Materials
Handling and Self -Inspection, Recordkeeping and Reporting requirements on your plans. The
NCGO1 compliance plan sheets for these can be found at https://deq,tic. gov/about/division s/energy-
mineral-land-resources/energy-mineral-land-permits/stormwater-permits/construction-sw.
� a o �J
CD 0
N p C O
(D r
� d Ca. In, .
pi • `-� UQ (D n UQ
0 'Cp p CD O �\
., �A. l 1
(D N p n (D
OilCOD CD cD ...
CDN
p cD
(D (D
O � y N
r CD C
Z Z CD (p A� �t GREATSF�!
F' * 4 O
t� �CD (AC/)�
0 0
w aw r " " a�
an JCD
M CD
CD
CD CD
O
CD
w CD r
wCD
Q� w CD ar
T �°,(Da��