HomeMy WebLinkAbout20090229 Ver 3_More Info Received_20120919�t
v
la'';NVIRONMEN`C`IL
PROFESSIONALS
P1.AMI ANC FOR
ENVIRONMENT
September 19, 2012
North Carolina Division of Water Quality
Attn: Mr. Roberto Scheller
943 Washington Square Mall
Washington, NC 27889
Dear Mr. Scheller,
This letter is with reference to the Heritage of Faith Family Church and our discussion regarding
stormwater management of the project. During our discussion, we agreed that the site resides on the ridge
which directs water towards the south and the Atlantic Ocean. We also discussed that in order to allow for
the development to utilize infiltration as the stormwater measure, that the project must not exceed 24% lot
coverage.
By reducing drive aisle widths and parking spaces, the lot coverage was reduced to 24 %.
I appreciate your review of this revision and receipt of your comments.
Sincerely,
Environmental Professionals, Inc.
06orge H. Wood, CEP, PWS
cc: Heritage of Faith Family Church/Attn: Rev. David Stowe
Division of Water Quality /Attn: Ms. Karen Higgins
U.S. Army Corps of Engineers /Attn: Mr. Josh Pelletier
P.O. BOX 3368 m KILL, DEVIL HILLS, NORTH CAROLINA 27948 m 292 -44I -0239
FAX: 252 - 441 -0721 m EMAIL: ohwood�_Dyahoo.com