Loading...
HomeMy WebLinkAbout20110362 Ver 1_Certification of Completion_20120907FFfFF,-- , cCloskey Project DWQ# 11 -0362 May 3, 2011 Page 3 of 3 DWQ Project No 1) - D 3 &1 County &t le- Applicant Aia -,V-A^A /i ry,�- Project Name Vn c- GL o s k cal Date of Issuance of 401 Water Quality Certification �j Zo /( V Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send certificates from all of these App Certific �t on I, , hereby state that, to the best of my abilities, due care and diligence was used in the servation of the construction such that the construction was observed to be built within substantial complian a and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting enals F-F Signa Date Agent's C ification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Date Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Penmttee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Date Registration No �Qb SFp , 'S