HomeMy WebLinkAbout20120793 Ver 1_EEP Receipt_20120917i
,Eosystem
1_ Ali fiarycement
PROGRAM
RECEIPT
September 17, 2012
Herbert Stein Heirs
attn Christopher May, Jr
PO Box 233
Crownsville, MD 21032
Project
Lot 6, BLC Jackson Dunes
County
Hyde
DWQ#
12 -0793
COE#
2012 -01422
EEP #
20824
Amount Paid
$6,211 00
Check Number
391
�K^ DI ° 3
The North Carolina Ecosystem Enhancement Program (NCEEP) has received a check as indicated above as payment for the
compensatory mitigation requirements of the 401 Water Quality Certification/Section 404 /CAMA Permit(s) issued for the above
referenced project This receipt serves as notification that your compensatory mitigation requirements assigned to NCEEP associated
with the authorized activity as specified below have been satisfied You must also comply with all other conditions of this
certification and any other state, federal or local government permits or authorization associated with this activity including SL 2009-
337, An Act to Promote the Use of Compensatory Mitigation Banks, as amended by S L 2011 -343
The NCEEP, by acceptance of this payment, acknowledges that the NCEEP is responsible for the compensatory mitigation
requirements indicated below associated with the project permit and agrees to provide the compensatory mitigation as specified in the
permit Mitigation responsibility assigned to the NCEEP is nontransferable The mitigation will be performed in accordance with the
N C Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28,
2010
River Basin
Stream Credits
Wetland Credits
Buffer I& II
HUC
(linear feet)
(acres)
(Sq Ft )
Cold
Cool
Warm
Ri arian
on-Riparian
Coastal Marsh
Tar - Pamlico
0
0
0
0
020
0
0
03020105
Refunds of payments made to NCEEP are only approved under certain conditions All refund requests must be submitted in
accordance with EEP's refund policy at www nceep net If you have any questions or need additional information, please contact
Kelly Williams at (919) 716 -1921
Sincerely,
Suzanne Klimek
Acting Director
cc Karen Higgins, NCDWQ Wetlands /401 Unit
William Wescott, USACE - Washington
Roberto Scheller, NCDWQ- Washington
Doug Huggett, NCDCM- Morehead City
Brian Rubino, agent
File
_ ... Protecti, Orr, r State,
e &n
NCDEE R
North Carolina Ecosystem Enhancement Program 1652 Mad Service Center Raleigh NC 27699 -1652 / 919 - 715 -0476 / www nceep net
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatory Mitiization Responsibility Transfer Form
Action ID SAW- 2012 -01422 Permlttee Herbert Stern Heirs attn Christopher M May, Jr
Project Name lot 6, Block C Jackson Dunes S/D NCDOT Project Reference
County Hyde
Instructions to Permittee The Permittee must provide a copy of this form to the Mitigation Bank or In -Lieu Fee (ILF)
Sponsor, who will sign the form to verify the transfer of the mitigation credits Once the Sponsor has signed this form, it is
the Permittee's responsibility to ensure that to the U S Army Corps of Engineers (USACE) Project Manager identified on
page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below
If more than one mitigation Sponsor will be used to provide mitigation associated with a single permit action, separate
forms shall be provided to each mitigation Sponsor
Instructions to Sponsor The Sponsor should verify that the mitigation requirements shown below are available and ensure
that they have received payment before signing this form By signing below, the Sponsor Is accepting responsibility for the
identlfled mitigation Once the form is signed, the Sponsor must update the appropriate ledger and provide a copy of the
signed form to the Permittee and to the USACE Bank /ILF Manager The Sponsor must also comply with all reporting
requirements established in their authorizing Instrument
Permitted Impacts and Compensatory Mitigation Requirements -"a, ,'aw z)
Permitted Impacts Requiring Mitigation" &digit HUC and Basin 03020105, P River Basin
Stream impacts (linear feet)
Wetland Impacts
(acres)
Warm
Cool
Cold
Riparian
Riparian
Non - Riparian
Coastal
Riverine
Riverine
Non- riverme
020
010
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor
Compensatory Mitigation Requirements 8-digit HUC and Basin 03020105, Pasquotank River Basin
Stream (credits)
Wetland (credits)
Warm
Cool
Cold
Riparian
Riparian
Non - Riparian
Coastal
Riverine
Non- riverine
020
Statement of Mitigation Liability Acceptance I, the undersigned, verify that 1 am authorized to approve mitigation
transactions for the Mitigation Bank /ILF Sponsor shown below, and certify that the Sponsor agrees to accept full
responsibility for providing the mitigation identified in this document (see table above), associated with the USACE
Permittee and Action ID number shown I also verify that released credits (or advance credits for ILF programs), as
approved by the USACE, are currently available at the bank /ILF site Identified below Further, I understand that If the
Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue
measures against the Sponsor to ensure compliance
Mitigation Bank/ILF Sponsor North Carolina Ecosystem Enhancement Program
Mitigation Site Debited 1 Le Gic{.uay' o_a ('.(P(.C.! 1
(List the bank site to be debited, or indicate "Advance Credits" for ILF use of advance credits)
Name of Sponsor's Authorized Representative Kelly Williams
'X"LkL2,:�� 17 4ti6_?p1&z 2012-
Signatur of Sp nsors uthorized Representative Date of Signature
Page 1 of 2 Form Updated 14 August, 2012
USACE Wilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Conditions for Transfer of Compensatory Mitigation Credit
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated In the permit conditions
i Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only
after the USACE is In receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has
accepted responsibility for providing the mitigation requirements listed herein For authorized Impacts conducted by
the North Carolina Department of Transportation ( NCDOT), construction within jurisdictional areas may proceed upon
permit issuance, however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of
permit issuance NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming
that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein
I Signed copies of this document must be retained by the Permittee, Mitigation Bank /ILF Sponsor, and in the USACE
administrative records for both the permit and the Bank /ILF Instrument It is the Permittee's responsibility to provide a
signed copy of this form to the USACE Project Manager at the address below
If changes are proposed to the type, amount or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and /or North Carolina
Interagency Review Team (NCIRT) If approved, higher mitigation ratios may be applied, as per current District
guidance and a new version of this form must be completed and Included In the USACE administrative records for both
the permit and the Bank /ILF Instrument
Comments /Additional Conditions-
This form is not valid unless signed by the mitigation Sponsor and USACE Project Manager For questions regarding this
form or any of the conditions of the permit authorization, contact the Project Manager at the address below
USACE Project Manager. William Wescott
USACE Field Office Washington Regulatory Field Office
US Army Corps of Engineers
2407 West Fifth Street
Washington, NC 27889
Email William G Wescott @usace army mil
\ 46-t?--
September 5, 2012
USACE Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http Bribits usace army mil
Page 2 of 2
The Wilmington District is committed to providing the highest level of support to the public To help us ensure we continue to do so please complete the
Customer Satisfaction Survey located at our website at htto //regulatory usacesurvey com/ to complete the survey online