Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6210302_Report (SW)_20210323
Sform wafer Mcnagemenf Reporf March 17, 2021 Utility Improvements to Serve�MAL Maxwell Ridge `I�,Y Calloway Road ll/fffl�is� Hoke County, NC Prepared for: Double D Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 Prepared by: Triangle Site Design, PLLC 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 553-6570 License#P-0619 TRIANGLE S I T E D E S I G N TABLE OF CONTENTS OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP WATER SURFACE CLASSIFICATIONS HUC NOAA POINT PRECIPITATION FREOUENCY ESTIMATES SHWT REPORT WATER QUANTITY -INFILTRATION BASIN DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION OVERVIEW This report contains the storm water management calculations for the proposed residential development Maxwell Ridge on Calloway Road in Hoke County. The project site is currently un—developed wooded area. The proposed site consists of 14.237 ac and approximately 2.437 ac will be disturbed as part of this project for the construction of the site improvements. The proposed site is located in Flood Zone `X' as shown on FEMA FIRM Panel 3710848800J with an effective date of 10/17/06. Flood zones are subject to change by FEMA. There are existing stream or wetland features on the proposed property, The proposed storm water management facility (infiltration basin) outlined in this report have been designed for post —development peak attenuation to treat the impervious areas of the development. The infiltration basin is designed to capture a drainage area of 9,81 ac with an impervious area of 2.21 ac. The balance of the site is wooded and will by—pass the proposed SCM. The SCM is designed to treat a 1.0" storm event. Soils The County Soils Survey indicates that Autryville Loamy Sand, Blaney Loamy Sand and Vaucluse Loamy Sand soils are present on the site. FIGURES _=z .61 m*e kL m=e .6/ $ ) / r \ % >) (DCl) ¥± \\ _0 N f§�2\ ) R \ / z ( k } \ ) §) O a \ $ ) } 7 f k ® A2 \ §d) �{ �q cCL - / o =f \� � 5 Z O a 0 Z Ca C Z W 0 W J a fa a) a m m E 3 0 7 CD rn n E O U ca L O O a C UO N N E U O m m n m m yc -CMID0 ° c _ � N '" a 3 Nm m cc O a) E m > w c > L C.m. Ot C 0V y 75 T w m U cQ m E ., cna E °mow O) c'o CD m rn m�Eo E a) r ai m 0a) C (6 W E u w (p N .m75N Cl) m ` N y o r ca 2 m v cn a) a) -p 3 c a �' E O E Nw N o N E OM E —y C ?Q)"O >> m `� U a m 0 y 'O m E ,p o � �` Cmn Ur cn m E N m� w L m M C a to f0 m a) a) U C ° o w0 .L.,, w w C 5 a) a cn co o 10 NCD-0m Z mo 3 a oow> E W m d p d 0 L N O L 3 '� `° CDL L U N m -0C n N m co D O C m a) m i CO O Q L m CD U - m C 0 ca i� o d 3 Z > cc 0)a O m m a E cD T U w n y p E? a) y Z 'P O m O L p UT)a a) m E CD a> m a) 2 U (D C O o N -0mn m m[[ ii a m� a �Q 8 � a) N S m m on m Z=1 E T S? m aCo m° L 0)) (6 ac) 2 O m m is y (D m o N E-0*E 0 0) w o c m?> Eco co U 'y Q� m w E T ov am T� �UN o 7•` yE mo amcE d ° O c E��� O O CD 00.2 O O > Z a mOL c, 0 a� m L a) U) m cn =a $ w U c � f0 a.a? m o a '�Lm. 7 T Zo c wjO' m c' E a) a) a E p a) p Un U cSi m O ; d U 2 a v¢ m L w H o O O Un Un O LP Un — m p O N api m L p E L H 0.9 m CU a m MA m T f0 o C c ca U 3 L L n A O c m S N y N c N O O L m N E �o o UL c0 W of O N U m U 0 Z U O (L J 9 Q � m C 3 m � 1] m D m m m N y O C O C _ y C O O C 0 (0 O O am Q rn¢ a m m U U 0 Z 0)¢ a m m U U 0 Z ¢ a m m d = c c 46 ❑ ❑ ❑ ❑ ❑ ❑ a © © M 0 ME L� o N N a U) �! N O O N N CO m Cl) d m Z �i� Hydrologic Soil Group —Hoke County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AuA Autryville loamy sand, 0 A to 2 percent slopes 5.1 33.8% BaB Blaney loamy sand, 2 to C 8 percent slopes 2.1 13.6% BaD Blaney loamy sand, 8 to 15 percent slopes C 1.5 9.7% VaB Vaucluse loamy sand, 2 to 8 percent slopes C 6.5 42.9% Totals for Area of Interest 15.1 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 3/16/2021 1011111111111 Conservation Service National Cooperative Soil Survey Page 3 of 4 C-Ac 5 a Q m c 0 N m N n CL m N 5 mv`�' c d N v cLa z CL m EA m LLaCW W° ma TT LLg7ivg7 8Lo8Cr7v�Op fY d LL vC xr` U3 m c p 7C 00 ��pp O Li eo a v Fr LL M .E:.NW cyA 0 o d 2m y 8c�E 9NmE �«r o Ea c o Wyots°o vO o ° L wc *m$ m,2m�wvLa 'o go -mg m 7 c O r m m m c E cE«mca 0 LLog °0to: a m�W a >° waycm umtfi avO O nmuivrmO dd m Ccm U m mm vja o Z O~L~mNn w 96 ONQ`0 LL >n 1 EmQ O NO c �°LL C a mai m m y m A �c N L m� E E m°o2.WNE0 N aOm— O c U Q Oi U U O 2 _°.0 �a W U. E c iO L4Le 'ym .0 :daE 0C nm c>nEyE wm a go oc ' Z m vLL p� COJ Nam) m Omm Ev G Gx Q Qw WW 8,1 �'�AZ7 Ev°�Qmvn O IA W � x x 2 n g > v %o O L d m n `m C m Z W O F LL Q WU �� d E'a°L° g`owia~E EdraAm g a C x 2 K C7 fL LL 7(a d« �n d ai O 2t E m M E 7 LU u W gg� W O ~ (~/1 �� LL H 9 F IVO N 3 Q F d ? IL 7 J y U) Q W W 0) �o �o N 0 0 0 0 0 0 0 LO 0 0 (Y' r r� t' S� S3 pia e �y eye v a„ Mc,"Ory Ln UAWtr Rur • Surface Water classifications: Stream Index: Stream Name: Description: Classification: Date of Class What does this Class. mean-, River Basin_ Zoom to 4 5 14-2-14 Quewhiffle Creek From source to Drowning Creek C November 34 1963 Lumber P'Ckler ,, Dr ••• 1 Kearns Ln y�. IL fr 40 12-D!Ot HUC (Subwatershed) 12-Digit Name: Quewhiffle Creek 12-Digit Code: 030402030205 IG-Digit Name: Lower Drowning Creek 10-Digit Code: 0304020302 nAf%An,3ni ti A !i9meste-aa iiis," 9/1/2020 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Raeford, North Carolina, USA* Latitude: 34.99010, Longitude:-79.1321' 7%& Elevation: 205.79 ft***source: ESRI Maps+ - source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G M Bonnin, D Martin, B, Lin, T. Parcybok, M Yekta, and D Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) �17trratiorl 000 10 25 50 100 200 5{rtin 0. 99 60 0,396 tZ 48 ❑- i7 569 0 0 664 4-&fl 733 .668 p 817 071 76180 934 0.8fY2 0 989EEM1. 10{nln 0.695 0-632.0769 ❑ 747 0 909 0-872--100& .962--16-17 1-07-I1830 MI(O 1. (1 21-31.49 1,2741357 1.35--1?6 1 405975 15{rtin 0.869 1.03 1.21 1.34 1.50 1.61 1.71 1.80 1.92 2.00 0 790-0-962 0-939-1-14 1.10-1.35 1.22-1-48 7-5-1-65 7 45=1 77 1.53.1-88 1-61-1-98 1.69-2.11 1 75-220 1.43 1.73 1.95 2.22 2.42 2.62 2.81 3.05 3.24 30{ninF(I .19 8-1.32 t1 30-1:5&} (1.57-1 91) (1 76-2.15 (2 00-2.44) 2 18-2.66 {2.34 2.8 (2-50-3.08) 2.70-3-35] 60{rtln-37 41964 (1 637998) 2012 -45 2.30--2290 66.3.25 2 95.3.51 3.23 336 7_5 3.094.32 3-B7 4881 4.1575-19 2-hr 6 1 56 1395 1.89-2-36 2-37-2,96 2 74 3542 22-4 05 3.61 4 55 3.99 5 05 4,3795.56 4. 8-6-26 5. -6.82) 3-hr (1 652 07) (2- 02250) 1 t2 23.1e} I a93.3 68] 1 (3.49.4.40) 1 (3.94-4-99) 5 t4.39-80 4-86-6.24 5-5147.15] 6,020689 8-hr 1 8-12 44 2AO-2,95 3.02 3573 3: 24 35) (4.205 22 4 7535.93 5-32 6,58 5.9077..46] (6 71 8,59 (7 5 93511 2.5 77-56471 47615) 26 12-hr 88 33 2 2-82-3,49 3-574.43 4. 65619 5. 26 26 (5. 0 6 1 8310 7. 5 -9 12 8 9-610.6 (9.02- 1 8 3. 771 24-hr 2 20328 (34163.97 (4, 2 5.04 5-04-5.88 -- 6.01`7305 6. 047.98 7.60 8,96 8.43 996 9-56-11.4 10-4- 2.5 2{lay 3 28 3279 3-964557 4.985575 5 8 9369] 6.8747398 7. 4 9002] 1 (8-62--10-1) (9.531.2) 1(10 8-182.83 1118-14.0 3�ay (3 0-4 01 4-21 41B3 5.28 6404) 6 9.77..00) 22.8.33 8.181 9839 9 03--10-5 (9.96111:6 71 2-13- 12 2-4.5 4�ay 7�iay 3.96 3 72-423 (4 31 4 192) 4.77 4.47.5-09 (5 6 5-89) 5.93 5-55.6.33 (6-337825] 6.86 G-40.7 31 (7.2G 8832) 8.14 7 57-8 57 (B-51 9678) 9.16 8 49.9.76) t9 510-131.q) 10.2 9 43-10.9 (10 5- 2 2) 11.3 10.4-12.1 11 6-13.4 12.8 11.7-13. 1310-15.2) 14.0 12 7-14.9 14 15 6-5 10 day 8 6 3 1 4.97 561 .93-6 570 6 8 7 .1p 8: 919 9- 1010 10 4-121.8 11 4-13,❑ 4 12 4-.2 1318-15;a 14.8-17 2 7.12 8.44 10.0 11.3 14.3 15.7 17.0 18.9 20.3 20�ay 6.72-7.58 1-97-8-96 9-47-10.7] 10-6.12.❑ �13.0 [1_ 2 13.8] 13-4-15-2 14 6-16.7] 15.9-18,1 17 5-20 1 18.8.21.7 30 day (8. B 953 9.88--141 1 11 6-12.9 1218- 4.4 1415-6-3 15-t8--187.8 17 18 9 3 1$ 3-20.8 0.0, 2-7 21-2. 4-3 45�ay 10.6-121.8) (12-5-13-9) 143-16.0 1516--17-$) L17-6-19.7. 19-0-21-3) 1 (20_3. 2.8) 1 (216324.4 23-a 6-4) (24z6--2 .0) 5.7 11.7 2324.6 0 60�Jay 1213 4 1} 7419--1s-5) 7,0- 8-8 1a-5.20.6 202fi 2.9 23.S26.3 25os27:9 2628-301 2530 r 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5% Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values Please refer to NOAA Atlas 14 document for more information Back to Tog PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=34.9901 Won =-79.1321 &data=depth&units=english&series=pds 1/4 Scott Cole, NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 Double D Engineering, PLLC Attn: Mr. Lee Humphrey 150 S. Page Street Southern Pines, NC 28387 February 6, 2021 Re: Seasonal High -Water Table Identification and Soil Infiltration Rates: Maxwell Ridge; Hoke County NC Parcels (Altparno) 10034 and 10035 (Calloway Road) Soil conditions and infiltration rates were evaluated and measured on the above -referenced property within the proposed storm water BMP device. Work was conducted in accordance with Parts A-2 and C- 1 of the North Carolina Department of Environmental Quality Stornni,ater Design Manual. Soil samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoximorphic (redox) features with a chroma of 2 or less (in Munsell color notation) in mottles or the horizon matrix. Colors of chroma 2 or less due to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SHWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High Water Table (SHWT). SATURATED HYDRAULIC CONDUCTIVITY Kk„ Soils evaluated on this property are typical of those within the Blaney Loamy Sand series (BaB, BaD) and the Vancluse Loamy Sand series (VaB). These soil series consist of deep, well drained soils with varying rates of permeability. Infiltration rates were measured to determine if soil conditions were suitable for the installation of stormwater infiltration trenches. Infiltration rates were measured using a Johnson Constant Head Permeameter. Measurements were recorded at varying intervals until equilibrium was reached. A summary of observations within the proposed Stormwater BMP Device is shown in the table below. BMP Device Site #1 SHWT Munsell Color Ksat Ksat (inches below Notation (48"; SL/SCL (78"; SCL/SC) round surface) Transition 84"(7') (SHWT 2.5Y 8/1 6" / hour .8" / hour elevation 344') 2.5Y 7/1 CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates; however, methods used to measure these rates can influence the results. Side walls of the bore hole are "smeared" by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both of these factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench, it is recommended the trench bottom Scott Cole, NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 and sidewalls be raked and dusted with pulverized limestone. These are practices that have been in place within the on -site wastewater industry to help loosen the soil and aid in restoration of soil structure. I am pleased to be of service in this matter and can be contacted at your convenience should you have any questions concerning information within this report. Thank you. Scott Cole North Carolina Licensed Soil Scientist •r r , � m r n '■ �� �~r 1 rrrJ r r r a r r r r It 1 .�� �r� rrrrrrr 1 „ter ,r r r r ` � r � r 1 � 1 � m .— -VIP �� O. !Y rIn CL fL U) ` r co L EN I L rL `•�'�_�-^L O �~ _ram-_ , mcn L Cam,' V1 •��� � •Lti r4 •~~—�� ly - 4-- O -Lo F I I � 1 WATER QUANTITY -INFILTRATION BASIN SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name 2 Project Area (ac) 3 Coastal Wetland Area ac 4 Surface Water Area (ac) 5 1 Is this project High or Low Density? 6 Does this project use an off -site SCM? lity Improvements to Serve Maxwell No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 30 8 Will the ve etated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: _11 Infiltration System 1 12 Bioretention Cell 0 0 13 Wet Pond 14 Stormwater Wetland 0 15 1 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 0 26 1 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Organization: Street address: City, State, Zi : Phone number(s): Email: Matt Lowder, PE Triangle Site Design, PLLC 28 29 4004 Barrett Drive Suite 101 30 Raleigh, NC 27609 31 919-553-6570 32 mlowder@trianglesitedesign.com Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the Information provided here. CI it V- 4 4� � �r r� •v 4/��V� �i 4�Yt1+ 44 1 00 ip�.iuuW''t �y ffr•�7i� t�nnl!`-3z 4Siq,.tu,e.f Designer Date 5/(7 1 -)- DRAINAGE AREAS 1 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM - Infiltration Basin 5 Total drainage areas .ft 427388 427388 6 Onsite drainage area (sq ft 427388 427388 7 Offsite drainage areas ft 8 Total BUA in project (sq ft 96311 sf 96311 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10 New BUA not on subdivided lots (subject to permitting) (sf) 11 ^ Offsite BUA s ft 12 Breakdown of new BUA not on subdivided lots: Parkin sq ft - Sidewalk (sq ft 3805 sf 3805 sf - Roof (sq ft 64000 sf 64000 sf Roadway s ft 28506 sf 28506 sf Future (sq ft Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15[permitting) Existing BUA that will remain (not subject to sq ft) _ 16 1 Existing BUA that is already permitted (sq ft) 17 1 Existina BUA that will be removed (sq ft) _ 18 Percent BUA 23% 19 Design storm inches 1.0 in 20 Desi n volume of SCM cu ft 9004 cf 21 Calculation method for design volume Simple Method ADDITfONAL INFORMATION 22 Please use this space to provide any additional information about the [drainage area(s): INFILTRATION SYSTEM F2 1 Drainage area number 1 Minimum required treatment volume (cu ft) 9004 c 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10 ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC 9 ? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Is there an O&M Plan that complies with General MDC (12)? Yes r15 16 Does the SCM follow the devices ecific MDC? Yes 17 Was the SCM desioned by an NC licensed arofessional? Yes 18 1 Proposed slope of the subgrade surface (%) 0% 19 jAreterraces or bafflesprovided? No 20 1 Type of pretreatment: Forebay snlls Data 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWT elevation (fmsl) 344.00 23 De th to SHWT per soils report (in) 84.00 24 Ground elevation at boring in soils report (fmsl) 351.00 25 1 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes 26 ISoil infiltration rate (in/hr) 6.00 27 IFactor of safe (FS) (2 is recommended)- 2.00 Elevations 29 Bottom elevation (fmsl) 347 ft 30 Stora a elevation fmsl 349. ft 31 Bypass elevation (fmsl) 351.7 ft For Basins On! 32 1Bottom surface area(ft)5205 ft 33 IStorage elevation surface area(ft) 8660. ft For Trenches Only 34 Length (ft) 35 Width ft 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone porosity 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection ort been provided? Volumes/Drawdown 44 Design volume of SCM cu ft) 9004 cf 45 1 Time to draw down hours 72 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 1 8:57 AM 3/17/2021 oar e ' --f q A Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin Drainage Area (DA) = 9.81 Acres 427388 sf Impervious Area (IA) = 11 2.21 Acres 963sf Percent Impervious (1) = 22.5 % Required Water Quality Volume Design Storm = 1 inch Determine Rv Value = 0.05 + .009 (1) = 0.25 in/in Water Quality Volume = 0.207 ac-ft Water Quality Volume = 9,004 cf Water Quality Volume = 0.253 inches of runoff NOAA 1 ear, 24-hour event = 3,07 inches Minimum Surface Area SA = (12"FS"DV)/(K*T) Factor of Safety (FS) = 2 Design Volume (DV) = 9004.1 cf Hydraulic Conductivity of Soil = 6.00 in/hr Max Dewatering Time = 72 hours SA = 500.2 sf Triangle Site Design, PLLC Maxwell Ridge, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions #1 Drainage Area (acres): 9.81 Existing Soil Groups: soil Grouo Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 3.08 31% C BaB Blaney Loamy Sand 1.01 10% C BaD Blaney Loamy Sand 1.33 14% C VaB Vaucluse Loamy Sand 4.39 45% Existing Land Uses: Land Use Description Exisfino Soil Groyp Acres Curve # WeOhled CN Wooded - Good Stand A 3.08 50 15.7 Wooded - Good Stand C 6.73 70 48.0 Cumulative Curve # = 63.7 Triangle Site Design, PLLC Maxwell Ridge, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions to Infiltration Basin # Drainage Area (acres Z 9.81 Existing Soil Groups: Soil Grouo Map Svmbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 3.08 31% C BaB Blaney Loamy Sand 1.01 10% C BaD Blaney Loamy Sand 1.33 14% C VaB Vaucluse Loamy Sand 4.39 45% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Impervious Area -Residential Lots A/C 1.47 98 14.7 Impervious Area-Sidewalk/Road A/C 0.74 98 7.4 Wooded - Good Stand A 2.30 50 11.7 Wooded - Good Stand C 5.30 70 37.8 Cumulative Curve # = 71.6 Impervious Area Summary Impervious Area to Wet Pond SF Acres Road 28,506 0.654 Sidewalk 3,805 0.087 Lots (1-16) (@4,00sf/Lots) 64,000 1.469 IA i 96,311 i 2.21 1 I ' TOP OF EYRWKYENf ElEV=353.0. 1 rr r/ GRASS SPILLWAY Yl REFER O DETAJL TM S SHEET I YANAGEHTEER / t w// EASEMENT •J / OBSERVATION WILL Lh p C31* T / rIr 11 I 1 GRAPHIC SCALE 30 15 37 1 INCH = 30 FEET PLAN VIEW ' STAGE/STORAGE TABLE INFILTRATION BASIN STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) i (FT) _ AREA (�F _STORAGE (CJ STORAGE (CFS 0.0 347.0 5205 0 0 1.0 348.0 6905 6055 6055 2.0 349.0 8660 7783 13838 3.0 350.0 10470 9565 23403 4.0 351.0 12340 11405 34808 5.0 352.0 14265 13303 48110 6.0 353.0 16245 15255 63365 STORMWATER MANAGEMENT DESIGN INFILTRATION BASIN RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: LUMBER QUEWHIFFLE CREEK 14-2-14 C 03040203 POND DESIGN SUMMARY DRAINAGE AREA TO POND: 9.81 ACRES SITE IMPERVIOUS AREA TO POND: 2.21 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 2.21 ACRES PRE -DEVELOPED POST -DEVELOPED DRAINAGE AREA: 9.81 AC 9.81 AC CURVE NUMBER: 63.7 71.6 INFILTRATION RATE: 6.0 IN/HR 1.0" STORM EVENT: 0.062 CFS 1-YEAR STORM EVENT: 3.117 CFS 13.24 CFS 2-YEAR STORM EVENT: 6.083 CFS 20.14 CFS 10-YEAR STORM EVENT: 16.84 CFS 41.65 CFS 100-YEAR STORM EVENT: 37.84 CFS 80.58 CFS POST DEVELOPED THROUGH POND 0.000 CFS 0.000 CFS 0.000 CFS 0.000 CFS 51.14 CFS L1 - i s 0 i i log dBG X o W S P rn Z O a W J W 3 M J J a N H Z W m Y Z m ! O m Q M W W N M W J O W O h z 2 a a J � at W 32 V z 3 N cn � to N V) 00 3 � CV m N 2 M C9 LL f Z O O OJ Lti cn LL- 3 0 O � � a N O a L N Z� N 3 o rri N M Ln M II Z Z W O Y Q m W W � Q 0 3 J � O N 1p o c� 3Z _ Z � J N W Z C) p H z W Z J J w z U RO Q Z _ Z CL J N W CL W R 1 O O Z p F H O z Q 3 J N W Z CL O � (N O w �o �N V) 0 z¢ 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 51.14 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 56,030 cuft Inflow hyd. No. = 2 - SCM Past -Developed Reservoir name = BMP Pond Max. Elevation = 352.73 ft Max. Storage = 58,616 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table ( Printed values - 1.00% of Op.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.93 80.58 << 352.07 ----- ------ --- --- 11.80 ----- -- ----- 2.001 11.80 11.97 79.19 352.49 ----- ----- ---- _- 36.68 ----- - -- _--- 2.117 36.68 12.00 62.90 352.69 << _--- -_--- ----- ----- 51.14 ----- ---- 2.171 51.14 << 12.03 39.93 352.68 ----- ----- ----- ----- 50.27 ----- ----- ----- 2.167 50.27 12.07 22.13 352.55 ----- ----- ----- ----- 40.59 ----- ----- ----- 2.132 40.59 12.10 13.80 352.39 ----- ----- ----- ----- 30.07 --- ----- ----- 2.090 30.07 12.13 11.36 352.27 ----- ----- ----- ----- 22.43 ----- ----- ----- 2.055 22.43 12.17 10.89 352.18 ----- ----- ----- ----- 17.55 ----- ----- ----- 2.032 17.56 12.20 10.45 352.13 ----- ----- ----- ----- 14.52 ----- ----- ---- 2.016 14.52 12.23 10.01 352.08 ----- ----- ----- ----- 12.45 --- ----- ----- 2.005 12.45 12.27 9.562 352.05 ----- ----- --- ----- 11.02 ----- ---- --- 1.996 11.02 12.30 9.111 352.03 ----- ----- ----- ----- 9.889 ----- ----- ----- 1.989 9.889 12.33 8.656 352.01 ----- ----- ---- -- 8.970 ----- ----- ----- 1.984 8.970 12.37 8.199 351.99 ----- ----- ----- ----- 8.204 ----- ----- ----- 1.979 8.205 12.40 7.738 351.97 -- -- ----- ----- ----- 7.543 ----- ---- - --- 1.974 7.544 12.43 7.275 351.96 -__ ----- ----- ----- 6.943 --- -- -- -_-- 1.970 6.944 12.47 6.810 351.94 ----- ----- ----- -- 6.385 ----- ----- ----- 1.966 6.385 12.50 6.342 351.93 5.855 ----- ----- ---- 1.963 5.856 12.53 5.909 351.92 ----- ----- ----- ----- 5.350 ----- ----- ----- 1.959 5.351 12.57 5.586 351.91 ----- ----- ----- --- 4.884 ----- ----- ----- 1.956 4.884 12.60 5.384 351.90 --- ----- --- -- 4.515 --- ----- ----- 1.953 4.515 12.63 5.256 351.89 ----- ----- ----- -- 4.240 ----- ----- ----- 1.951 4.241 12.67 5.152 351.88 --_-- ----- ----_ ----- 4.005 ----- ----- ----- 1.949 4.005 12.70 5.048 351.87 ----- ----- ----- ----- 3.801 ----- ---- ----- 1.947 3.801 12.73 4.943 351.87 ----- ----- ----- ----- 3.622 ----- ----- ----- 1.945 3.622 12.77 4.838 351.86 ----- ----- ---- ----- 3.460 ----- ----- ----- 1.944 3.460 12.80 4.733 351.86 ----- ----- ----- ----- 3.313 ----- ----- ----- 1.943 3.313 12.83 4.627 351.85 ----- ----- ----- ----- 3.175 --- ----- ----- 1.941 3.175 12.87 4.521 351.85 ----- ----- ----- ----- 3.046 ----- ----- ----- 1.940 3.046 12.90 4.415 351.84 ----- ----- --w- ----- 2.922 ---- ----- ----- 1.939 2.922 12.93 4.308 351.84 ----- ----- ----- ----- 2.802 ----- ----- ----- 1.938 2.803 12.97 4.201 351.83 ----- ----- ----- ----- 2.687 ----- ----- ----- 1.937 2.687 13.00 4.094 351.83 ----- ----- ----- ----- 2.573 ----- --- ---- 1.936 2.573 13.03 3.991 351.83 ----- ----- ----- ----- 2.462 ----- ----- ----- 1.935 2.462 13.07 3.904 351.82 ----- ----- ----- --- 2.355 ----- ----- ----- 1.934 2.355 13.10 3.834 351.82 ---- - --- ----- 2.255 ----- ----- ----- 1.933 2.254 13.13 3.773 351.82 ----- ----- ----- ----- 2.163 ----- ----- ----- 1.932 2.163 13.17 3.716 351.81 ----- ----- ----- ----- 2.079 ----- ----- ----- 1.932 2.079 13.20 3.659 351.81 ----- ----- _---- ----- 2.002 ----- ----- ----- 1.931 2.002 13.23 3.601 351.81 ----- ----- ----- ----- 1.930 ----- ----- ----- 1.930 1.930 Continues on next page... 9 Post Through SCM Hydrograph Discharge Table Time Inflow Elevation (hrs) cfs ft 13.27 3.544 351.81 13.30 3.486 351.81 13.33 3.428 351.80 13.37 3.370 351.80 13.40 3.312 351.80 13.43 3.254 351.80 13.47 3.196 351.79 13.50 3.137 351.79 13.53 3.081 351.79 13.57 3.029 351.79 13.60 2.983 351.78 13.63 2.940 351.78 13.67 2.899 351.78 13.70 2.857 351.78 13.73 2.815 351.77 13.77 2.773 351.77 13.80 2.732 351.77 13.83 2.690 351.76 13.87 2.648 351.76 13.90 2.606 351.76 13.93 2.563 351.76 13.97 2.521 351.75 14.00 2.479 351.75 14.03 2.440 351.75 14.07 2.409 351.75 14.10 2.387 351.74 14.13 2.371 351.74 14.17 2.356 351.74 14.20 2.342 351.74 14.23 2.328 351.74 14.27 2.314 351.73 14.30 2.299 351.73 14.33 2.285 351.73 .End Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs ----- ----- ----- ----- 1.861 ----- ----- ----- 1.930 1.861 ----- ----- ----- ----- 1.795 ----- ----- ----- 1.929 1.795 ----- ----- ----- -- 1.732 ----- ----- ----- 1.929 1.731 1.669 ----- ----- ----- 1.928 1.669 -_-- ----- ----- ---- 1.624 ----- ----- ---- 1.927 1.624 ----- ----- ----- ----- 1.587 ----- -- ----- 1.927 1.587 -- -- -- -- 1.547 ----- ----- ----- 1.926 1.547 ----- ----- ----- ----- 1.505 ----- ----- ----- 1.925 1.505 ----- ----- ----- ----- 1.461 ----- ----- ---- 1.925 1.460 1.415 ----- ----- ----- 1.924 1.415 - - ----- ----- ----- 1.369 ----- ---- ---- 1.923 1.369 ----- ----- ----- ----- 1.323 ----- --- - ----- 1.923 1.323 ----- ----- ----- ----- 1.278 ---•_ ----_ ----- 1.922 1.278 ----- ----- ___ ___-- 1.234 ----- ----- ----- 1.921 1.234 1.190 ----- ----- --- 1.920 1.190 ----- ----- ----- ----- 1.146 ----- ----- ----- 1.920 1.146 ----- ----- ----- ----- 1.103 ----- _-_-- ----- 1.919 1.103 ---- ---- ---- ---- 1.060 ----- --- ----- 1.918 1.060 1.017 ----- ----- ----- 1.918 1.017 ----- ---- ---- ----- 0.975 ----- ----- -_-._ 1.917 0.975 __.._ ..... --- ..... 0.932 ----- --- ---- 1.916 0.932 -- -- --- - -- 0.890 ----- ----- ----- 1.915 0.890 ----- ----- -- --- ----- 0.848 ---_ ---- ----- 1.915 0.848 ----- ----- ----- ----- 0.806 ----- ----- - 1.914 0.806 ----- ----- ----- ----- 0.765 --- ----- ----- 1.913 0.765 ---- ----- --- ---- 0.727 ----- ----- ----- 1.913 0.726 ----- ----- ----- ----- 0.690 ----- ----- ----- 1.912 0.690 ----- ----- ----- ----- 0.658 ----- ----- ----- 1.912 0.657 ----- 0.627 - -- ---- ----- 1.911 0.627 ----- ----- ----- ----- 0.599 ----- ----- -_--- 1.911 0.599 ----- ----- ----- ----- 0.573 ----- ----- ---- 1.910 0.573 ----- ----- ---- --- 0.549 ----- ----- ----- 1.910 0.549 ----- ----- ----- ----- 0.526 ----- ----- ----- 1.910 0.526 9,33 - 103 3/17/2021 NORTH AMERIC►o1N GREEN' SPILLWAY ANALYSIS > > > Grass Spillway, ECMDS 7.0 Name Grass Spillway Discharge 51.2 Peak Flow Period 2.5 Channel Slope 0.5 Channel Bottom Width 20 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam (GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% North American Green 5401 St. Wend el -Cynthia na Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Depth Mannings N Shear Stress Shear Stress Factor Remarks Pattern Shoremax w/ Straight 51.2 cfs 13.75 ft/s 0.19 ft 0.025 8.5 Ibs/ft2 5.81 Ibs/ft2 1.46 STABLE F P550 Unvegetated Underlying Straight 51.2 cfs 13.75 ft/s 0.19 ft 0.025 8.05 Ibs/ft2 5.71 Ibs/ft2 1.41 STABLE F Substrate Shoremax w/ Straight 51.2 cfs 14.09 ft/s 0.18 ft 0.024 14 Ibs/ft2 5.66 Ibs/ft2 2.48 STABLE F P550 Reinforced Vegetation Underlying Straight 51.2 cfs 14.09 ft/s 0.18 ft 0.024 8.5 Ibs/ft2 5.56 Ibs/ft2 1.53 STABLE F Substrate https://ecmds.com/project/142852/spillway-analysis/200823/show# 1 /1 Pond Report 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Pond No. 1 - BMP Pond Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 347.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuff) 0.00 347.00 5,205 0 0 1.00 348.00 6,905 6,055 6,055 2.00 349.00 8,660 7,783 13,838 3.00 350.00 10,470 9,565 23,403 4.00 351.00 12,340 11,405 34,808 5.00 352.00 14,265 13,303 48,110 6.00 353.00 16,245 15,255 63,365 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) Inactive Inactive Inactive Inactive Crest Len (ft) = 20.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 351.70 0.00 0.00 0.00 No. Barrels = 0 0 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad -- - -- Length (ft) = 0.00 0.00 0.00 0.00 Multistage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 6.000 (by Contour) Multistage = n/a No Yes No TW Elev. (ft) = 0.00 Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 8.00 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 16.00 24.00 32.00 40.00 48.00 56.00 64.00 Elev (ft) 353.00 352.00 351.00 350.00 349.00 348.00 347.00 72.00 80.00 Discharge (cfs) Hydrograph Summary Re p�flow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) SCS Runoff Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) 16,505 Inflow hyd(s) — Maximum elevation (ft) Total Hydrograph strge used description (cuft) — SCM Pre -Developed 1 3.117 2 732 — 2 SCS Runoff 13.24 2 718 26,925 ----•- ----- -- SCM Post -Developed 3 Reservoir 0.000 2 946 0 2 348.52 10,121 Post Through SCM 5 SCS Runoff 0.062 2 360 342 -- — 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 352 0 5 347.04 211 1.OinPost Through SCM Wednesday, Mar 17, 2021 Infiltration.gpw Return Period: 1 Year 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 3.117 cfs Storm frequency = 1 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 16,505 cuft Drainage area = 9.810 ac Curve number = 63.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 25.20 min Total precip. = 3.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 3.00 2.00 1.00 0.00 0 2 4 -- Hyd No. 1 Cam: SCM Pre -Developed Hyd. No. 1 -- 1 Year Q (cfs) 4.00 K 11 2.00 1.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) M Wydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Peak discharge = 13.24 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 26,925 cuft Drainage area = 9.810 ac Curve number = 71.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. - 3,03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 14.00 12.00 10.00 N. IX . KI 4.00 2.00 0.00 0 2 4 - Hyd No. 2 L SCM Post -Developed Hyd. No. 2 -- 1 Year Q (cfs) 14.00 12.00 10.00 M . 11 4.00 2.00 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) 4 Hydrograph Report Hydraflow, Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 15.77 hrs Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 348.52 ft Reservoir name = BMP Pond Max. Storage = 10,121 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 14.00 12.00 10.00 M. M 4.00 2.00 Post Through SCM Hyd. No. 3 -- 1 Year 4 8 12 16 20 24 28 Hyd No. 3 Hyd No. 2 Total storage used = 10,121 cult Q (cfs) 14.00 12.00 10.00 More, . Uff, 4.00 2.00 0.00 32 Time (hrs) 0 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 5 1.0 Post -Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 0.062 cfs Storm frequency = 1 yrs Time to peak = 6.00 hrs Time interval = 2 min Hyd. volume = 342 cuft Drainage area = 9.810 ac Curve number = 71.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution - SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0.0 1.0 Post -Developed to SCM Hyd. No. 5 -- 1 Year 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 5 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 7.0 Time (hrs) 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 6 1.OinPost Through SCM Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 5 - 1.0 Post -Developed to SCM Reservoir name = BMP Pond Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0.0 1.OinPost Through SCM Hyd. No. 6 -- 1 Year Wednesday, Mar 17, 2021 Peak discharge = 0.000 cfs Time to peak = 5.87 hrs Hyd. volume = 0 cuft Max. Elevation = 347.04 ft Max. Storage = 211 cuft 0.7 1.3 2.0 2.7 3.3 4.0 4.7 5.3 Hyd No. 6 Hyd No. 5 ® Total storage used = 211 cuft Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 6.0 Time (hrs) Hyd ro g ra p h Summary Re p `fiy�raflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 6.083 cfs Storm frequency = 2 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 27,272 cuft Drainage area = 9.810 ac Curve number = 63.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 25.20 min Total precip. = 3.67 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 M 5.00 4.00 3.00 2.00 1.00 0.00 0 2 4 Hyd No. 1 SCM Pre -Developed Hyd. No. 1 -- 2 Year Q (cfs) 7.00 AMC 5.00 4.00 4M 2.00 1.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Peak discharge = 20.14 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 40,372 cuft Drainage area = 9.810 ac Curve number = 71.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 3.67 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 18.00 15.00 12.00 X M 3.00 0.00 0 2 4 • Hyd No. 2 L SCM Post -Developed Hyd. No. 2 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 •10 M 3.00 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31)® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 19.77 hrs Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 349.38 ft Reservoir name = BMP Pond Max. Storage = 17,459 cuft Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 4 — Hyd No. 3 Post Through SCM Hyd. No. 3 -- 2 Year 8 12 16 20 24 28 Hyd No. 2 ® Total storage used = 17,459 cuft Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 32 Time (hrs) 15 Hydrograph Summary Re p 1-Ipdraflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 16.84 2 730 65,067 ----•- SCM Pre -Developed 2 SCS Runoff 41.65 2 718 83,953 ------ ------ ------ SCM Post -Developed 3 Reservoir 0.000 2 800 0 2 351.64 43,302 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 --- ---- -----• 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 347.00 Year 0.000 Wednesday, 1.0inPost Through SCM Mar 17, 2021 Infiltration.gpw Return Period: 10 Hydrograph Report 16 Hydraflow Hydrographs Extension for AutoCAD® Civil 31D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 16.84 cfs Storm frequency = 10 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 65,067 cuft Drainage area = 9.810 ac Curve number = 63.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 25.20 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre -Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO2009 byAutodesk, Inc. v6.066 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 9.810 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 5.45 in Storm duration = 24 hrs 40.00 30.00 20.00 10.00 2 4 6 8 Hyd No. 2 SCM Post -Developed Hyd. No. 2 -- 10 Year 17 Wednesday, Mar 17, 2021 Peak discharge = 41.65 cfs Time to peak = 11.97 hrs Hyd. volume = 83,953 cuft Curve number = 71.6 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Q (cfs) 50.00 40.00 �41�k 20.00 10.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = 13.33 hrs Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 351.64 ft Reservoir name = BMP Pond Max. Storage = 43,302 cuft Storage Indication method used. Exfiltration extracted from Outflow. 40.00 30.00 20.00 10.00 0.00 0.0 2.0 — Hyd No. 3 Post Through SCM Hyd. No. 3 -- 10 Year 4.0 6.0 8.0 10.0 12.0 14.0 16.0 Hyd No. 2 Total storage used = 43,302 cuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 18.0 Time (hrs) 21 Hydrograph Summary Rep ydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) SCS Runoff Peak flow (cfs) 37.84 Time interval (min) Time to peak (min) Hyd. volume (cult) 140,045 Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) ------ Hydrograph description SCM Pre -Developed 1 2 728 ------ 2 SCS Runoff 80.58 2 716 164,263 — -- ------ ------ SCM Post -Developed 3 Reservoir 51.14 2 720 56,030 2 352.73 58,616 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 - ---- — 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 347.00 0.000 Wednesday, 1.0inPost Through SCM Mar 17, 2021 Infiltration.gpw Return Period: 100 Year 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 37.84 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 140,045 cuft Drainage area = 9.810 ac Curve number = 63.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 25.20 min Total precip. = 8.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 40.00 20.00 10.00 SCM Pre -Developed Hyd. No. 1 -- 100 Year 2 4 6 8 10 12 14 Hyd No. 1 Q (cfs) 40.00 30.00 20.00 10.00 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report 23 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Mar 17, 2021 Hyd. No. 2 SCM Post -Developed Hydrograph type - SCS Runoff Peak discharge = 80.58 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 164,263 cuft Drainage area = 9.810 ac Curve number = 71.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method USER Time of conc. (Tc) = 5.00 min Total precip. = 8.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 6 8 Hyd No. 2 SCM Post -Developed Hyd. No. 2 -- 100 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 10 12 14 16 18 20 22 24 Time (hrs) 24 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.0 Post Through SCM Hyd. No. 3 -- 100 Year Wednesday, Mar 17, 2021 Peak discharge = 51.14 cfs Time to peak = 12.00 hrs Hyd. volume = 56,030 cuft Max. Elevation = 352.73 ft Max. Storage = 58,616 cuft 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Hyd No. 3 - Hyd No. 2 ® Total storage used = 58,616 cuft Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 16.0 Time (hrs) F: ! a■ ! I 2 k® \F { k \t))\|! £$ � \} 7 }/ § § | ■ \� ¥� !!� � 22 � k. osi 0 � � ; �� M� iJ \ �0�.►��� � Girt