Loading...
HomeMy WebLinkAboutNCC211455_ESC Approval Submitted_20210323ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director Duke Energy -Piedmont Natural Gas Attn: Joseph Heckman, Project Manager 4740 Corporation Drive Fayetteville, NC 28306 NORTH CAROLINA Environmental Quality September 21, 2020 LETTER OF APPROVAL Express Option RE: Project Name: FB — Fort Bragg NG Distribution — Project A-8 Acres Approved: 2.75 Project ID: CUMBE-2021-028 County: Cumberland, City: FortBragg, Address: Gruber Road River Basin: Cape Fear Stream Classification: Other Submitted By: AECOM Date Received by LQS: September 21, 2020 Plan Type: New Dear Mr. Heckman: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as required by Title 15A NCAC 4B.0129. This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 NORTH CAROLINA - DWpn ��meori,uome��iu�ar� /� 910.433.3300 Letter of Approval Duke Energy -Piedmont Natural Gas September 21, 2020 Page 2 of 2 Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, V -Qa Jodi Pace, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval cc: Rick Douglas, AECOM (electronic copy) Lee Ward, Water Management Branch (electronic copy) DEMLR - Fayetteville Regional Office File