HomeMy WebLinkAboutNCC211756_Site Plan or Location Map_20210323EROSION CONTROL NOTES: 7. THIS SITE IS SUBJECT TO ALL EROSION AND STORMWATER REQUIREMENTS ASSOCIATED WITH CHATHAM COUNTY ORDINANCES. 2. ALL EROSION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF CHATHAM COUNTY. THESE CURRENT STANDARDS AND SPECIFICATIONS CAN BE FOUND A https://www.chathamnc.org/government/departments-programs/watershed-protection/erosion-control/standard-details AND SHALL BE SUPERCEDE ANY EROSION DETAILS THAT HAVE BEEN PROVIDED. 3. MEASURES PROPOSED FOR THIS SITE ARE STANDARD PRACTICE FOR SITES WITH MINIMAL GRADE CHANGE, HOWEVER, ALL APPLICABLE LAWS AND REGULATIONS REQUIRING DUE CARE AND TREATMENT OF CONSTRUCTION RELATED SEDIMENT LADEN RUNOFF SHALL STILL APPLY AND BE STRICTLY ADHERED TO. 4. SILT FENCE OUTLETS HAVE BEEN SHOWN AT LOCATIONS WHERE IT APPEARS SITE RUNOFF WILL POND OR DRAIN TO. ADDITIONAL OUTLETS SHALL BE PROVIDED AS NEEDED WHERE SITE CONDITIONS DIFFER AND STORMWATER PONDS DURING CONSTRUCTION. 5. SEE DETAIL SHEET C-2.2 FOR SEEDING REQUIREMENTS. ALL AREAS SHALL BE SODDED, MULCHED OR OTHERWISE COVERED PER THE STABILIZATION CHART BELOW HEREIN. 6. ALL SLOPES GREATER THAN 3:7 SHALL BE COVERED WITH NORTH AMERICAN GREEN (NAG) SC750 OR APPROVED EQUAL. ALL OTHER AREAS SHALL BE COVERED/MATTED AS SPECIFIED ON THE PLANS. 7. CONTRACTOR SHALL MAINTAIN AND REPLENISH THE CONSTRUCTION ENTRANCE AS NEEDED TO MAINTAIN EFFECTIVENESS AT CLEANING TIRES OF CONSTRUCTION EQUIPMENT PRIOR TO EXITING THE SITE. 8. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPLETE THE FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE (HTTP://DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL-LAND-RESOURCES/EROSION- SEDIMENT-CONTROL/FORMS). COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX." (GS113A- 54.1 (E), 15A NCAC 04B.0731 NCG07 SECTION 118 (3)). 9. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES OCCUR. A COPY OF THE E&SC PERMIT, THE COC, AND A HARD COPY OF THE PLAN MUST BE KEPT ON SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE DURING INSPECTION." THE COC CAN BE OBTAINED BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT (E- NOI) FORM AT DEQ.NC.GOV/NCG07. PLEASE NOTE, THE E-NO/ FORM MAY ONLY BE FILLED OUT ONCE THE PLANS HAVE BEEN APPROVED. 70. SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. 77. OBTAIN ALL THE APPROVALS AND PERMITS NECESSARY TO BEGIN AND COMPLETE THE PROJECT. THESE APPROVALS AND PERMITS INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: APPROVAL OF SITE DESIGN, ZONING, ETC.; APPROVAL OF DESIGNS FOR STREETS, UTILITIES, ETC.; EROSION CONTROL PLAN APPROVAL AND GRADING PERMIT; ZONING COMPLIANCE PERMIT, • DRIVEWAY PERMIT FROM NCDOT. THE APPROVALS MUST BE OBTAINED BEFORE THE DISTURBANCE BEGINS SO THAT WORK WILL NOT BE INTERRUPTED DUE TO LACK OF APPROVED PLANS. 72. SUBMIT DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY (NCG070000) TO STORMWATER INSPECTIONS THROUGHOUT THE PROJECT. LATH AND FLAGGING ON 3 SIDES 10' MINIMUM 0 O O a s O A A O O O O O O O VARIES 10 mil PLASTIC LINING 1L CHATHAM COUNTY NOR'! H CAROLINA WATERSHED PROTECTION DEPARTMENT EXISTING ROADWAY SANDBAG 10 mil PLASTIC LINING -IIII=1' SECTION A -A 3' NOT TO SCALE IIII-IIII=III' BERM SANDBAG PLAN NOT TO SCALE BERM TYPE "BELOW GRADE" STAPLES STRAW BALE BINDER WIRE (2 PER BALE) 10 mlI PLASTIC LINING PLYWOOD NATIVE MATERIAL "X24" BLACK LETTERS PAINTED (OPTIONAL) EIGHT CONCRLAG SCREWS SECTION B-B K NOT TO SCALE WOOD OR METALSTAKES(2 PER BALE) 36"WOOD POST 10' MINIMUM 3.6 Xfi 3 6^X " 36" iiii-iiii-1111_'il u1-ili B B CONCRETE WASHOUT SIGN DETAIL (OR EQUIVALENT) VARIES 2�� 1.12" DIA STEEL WIRE STAPLE 10 mil PLASTIC LINING PLAN STRAW BALE DETAIL NOT TO SCALE (TYP) TYPE "ABOVE GRADE" WITH STRAW BALES 10 mil PLASTIC LINING WOOD FRAME SECURELY FASTENED AROUND SECTION B-B ENTIRE PERIMETER NOT TO SCALE WITH TWO STAKES NOTES 1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD. I 10'MINIMUM TWO -STACKED 2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED UGH WOOD FRAME WITHIN 30' OF THE TEMPORARY CONCRETE WASHOUT. B e 3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT SHALL BE REMOVED FROM THE STAKE SITE AND DISPOSED OF OR RECYCLED. VARIES (TVP) 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT SHALL BE BACKFILLED REPAIRS AND STABILIZED TO PREVENT PLAN TYPE "ABOVE GROUND" EROSION. 10 mil PLASTIC LINING NOT TO SCALE WITH WOOD PLANKS DETAIL NUMBER STANDARD CONCRETE/PAINT WASHOUT 2018_U22 SHEET 1 of 1 EXISTING ROAM st J� CHATHAM COUNTY NORTH CAROLINA WATERSHED PROTECTION DEPARTMENT 70'-0" MINIMUM BUT SUFFICIENT TO KEEP SEDIMENT ON SITE 2"-3" STONE TO BE USED (SURGE STONE OR RAILROAD BALLAST) PLAN VIEW 25-FT OR WIDTH OF PROPOSED STREET, WHICHEVER IS GREATER. 70'-0" MINIMUM CROSS SECTION NOTES: GRAVEL CONSTRUCTION ENTRANCE SHALL BE MAINTAINED ROUTINELY TO AVOID SEDIMENT LEAVING PROJECT. SEDIMENT ENTERING ROADWAY FROM PROJECT SHALL BE REMOVED IMMEDIATELY. NEW CONSTRUCTION STANDARD GRAVEL CONSTRUCTION ENTRANCE DETAIL NUMBER 2018-003 SHEET 1 of 1 CONSTRUCTION SEQUENCE: 7. THE CONTRACTOR SHALL THOROUGHLY REVIEW PLANS AND "EROSION CONTROL NOTES" PRIOR TO STARTING WORK. 2. LOCATE A JOB-SITE/INSPECTION BOX IN A SECURE PLACE ON SITE TO HOUSE THE GRADING PERMIT AND APPROVED EROSION CONTROL PLAN AND TO PROVIDE A PLACE FOR INSPECTORS TO LEAVE INSPECTION REPORTS, COMPLIANCE NOTICES, ETC. SITE PERSONNEL SHOULD CHECK THE BOX DAILY FOR THIS CORRESPONDENCE. PROVIDE CONTACT INFORMATION WITH NOTE TO "CONTACT C3 DESIGN & ENGINEERING @ 979-230-0996 SHOULD ANY ISSUES ARISE DURING CONSTRUCTION". 3. FLAG LIMITS OF DISTURBANCE. 4. STAKE SILT FENCE, TREE PROTECTION FENCE AND CONSTRUCTION ENTRANCE. S. SCHEDULE AND HOLD A PRECONSTRUCTION CONFERENCE BEFORE STARTING ANY DEMOLITION, TIMBERING, CLEARING, OR GRADING WITH THE OWNER (OR REPRESENTATIVE), THE CONTRACTOR(S) RESPONSIBLE FOR THE DISTURBANCE AND EROSION CONTROL, AND EROSION CONTROL PERSONNEL TO DISCUSS THE PROJECT AND THE EROSION CONTROL PLAN. COUNTY INSPECTOR IS TO BE NOTIFIED AT LEAST 48 HOURS PRIOR TO COMMENCEMENT OF LAND DISTURBING ACTIVITIES AT 979-545-8268. THE LAND DISTURBANCE PERMIT WILL BE ISSUED AT THIS MEETING. 6. AFTER THE PRECONSTRUCTION MEETING IS COMPLETED, CLEAR ONLY ENOUGH TIMBER TO INSTALL A SAFE AND ADEQUATE CONSTRUCTION ENTRANCE. 7. STOP ALL CLEARING AND STABILIZE CONSTRUCTION ENTRANCE WITH APPROPRIATE STONE. 8. ONCE CONSTRUCTION ENTRANCE IS INSTALLED, CLEAR ONLY ENOUGH TREES TO INSTALL SILT FENCE, SILT FENCE OUTLETS AND TREE PROTECTION FENCE. INSTALL ADDITIONAL SILT FENCE OUTLETS AS NEEDED WHERE LOW AREAS EXIST OR DEVELOPED SITE CONDITIONS CREATE PLACE FOR SITE RUNOFF TO COLLECT/POND. 9. STOP ALL ACTIVITIES AND CALL JUSTIN HASENFUS (910-773-0638) FOR AN INSPECTION. 70. AFTER INSPECTION IS APPROVED, STAKE SEDIMENT BASINS IF APPLICABLE. 11. ONCE BASINS ARE STAKED, CLEAR ONLY ENOUGH TO INSTALL SEDIMENT BASINS. 12. STOP ALL ACTIVITIES AND CALL JUSTIN HASENFUS (970-773-0638) FOR AN INSPECTION. 13. ONCE INSPECTION IS APPROVED AND THE BASINS ARE INSTALLED THE REMAINDER OF THE SITE MAY BE CLEARED OF TIMBER AND GRUBBING/GRADING ACTIVITIES MAY BEGIN. 74. STOP ALL ACTIVITIES - ONCE SITE IS CLEARED OF TIMBER AND GRUBBING HAS BEEN COMPLETED STAKE ALL REMAINING EROSION CONTROL DEVICES AND CALL JUSTIN HASENFUS (910-773-0638) FOR AN INSPECTION. 75. CALL FOR INSPECTION AT 979-545-8268 IF REQUIRED BY THE PERMIT OR DISCUSSED AT THE PRE -CONSTRUCTION MEETING FOR INSPECTION OF INITIAL E&S CONTROL MEASURES. 16. BEGIN EARTHWORK AND EXCAVATION ACTIVITIES TO ACHIEVE THE ROADWAY GRADES AS SOON AS POSSIBLE. 17. ANY BORROW MATERIAL BROUGHT ONTO THIS SITE MUST BE FROM A LEGALLY OPERATED MINE OR ANOTHER APPROVED SOURCE. ANY SOIL WASTE THAT LEAVES THIS SITE CAN BE TRANSPORTED TO A PERMITTED MINE OR SEPARATELY PERMITTED CONSTRUCTION SITES WITHOUT ADDITIONAL PERMITS UNDER NCGS 74-49(7)(D). DISPOSAL AT ANY OTHER LOCATION WOULD HAVE TO BE INCLUDED AS A PERMIT REVISION FOR THIS APPROVAL. 78. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED AS NEEDED, AT LEAST ONCE PER WEEKAND AFTER EVERY 1" RAINFALL EVENT. 19. TEMPORARY SEED AND MULCH ALL AREAS DISTURBED WITHIN MINIMUM REQUIRED TIMEFRAME. SEE TEMPORARY SEEDING SCHEDULE AND THE STABILIZATION TIMEFRAME NOTED ON THIS SHEET. PER NPDES PERMIT, "GROUND STABILIZATION WILL BE APPLIED WITHIN 74 CALENDAR DAYS FROM LAST LAND DISTURBING ACTIVITY. FOR STEEP SLOPES, THAT AREA MUST BE STABILIZED WITHIN 7 CALENDAR DAYS". 20. INSPECT AND MAINTAIN THE EROSION CONTROL DEVICES SO THEY CONTINUE TO FUNCTION PROPERLY. REFER TO THE EROSION CONTROL DETAILS FOR SPECIFIC INSTRUCTIONS FOR EACH DEVICE. THE PERSON RESPONSIBLE FOR EROSION CONTROL IS ALSO RESPONSIBLE FOR TAKING THE INITIATIVE IN INSPECTING AND MAINTAINING THESE DEVICES, • DO NOT WAIT FOR THE EROSION CONTROL INSPECTOR TO POINT OUT THE NEED FOR MAINTENANCE REPAIRS. KEEP MUD AND DEBRIS OFF THE PUBLIC STREET AT ALL TIMES. IF MUD OR DEBRIS IS TRACKED FROM THE SITE, USE A SHOVEL AND BROOM TO REMOVE IT IMMEDIATELY. 21. IF IT IS DETERMINED DURING THE COURSE OF CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE DESPITE PROPER IMPLEMENTATION AND MAINTENANCE OF THE APPROVED EROSION CONTROL PLAN, THE PERSON RESPONSIBLE FOR THE LAND -DISTURBING ACTIVITY IS OBLIGATED TO TAKE ADDITIONAL PROTECTIVE ACTION AND NOTIFY ENGINEER OF THE NEED FOR ADDITIONAL MEASURES. 22. INSTALL SITE UTILITIES, CONDUIT AND STORM DRAINAGE AS CONSTRUCTION PERMITS. 23. ONCE SITE GRADING IS COMPLETE, PERMANENTLY STABILIZE ALL DISTURBED AREAS, INCLUDING THE REMOVAL OF THE CONSTRUCTION ENTRANCE TO INSTALL BASE FOR PAVING. INSTALL SIDEWALKS AND CURB/GUTTER IN ALL PERMANENT DRIVES SO THAT THEY CAN BE STABILIZED WITH STONE BASE. 24. PLACE TOPSOIL AND PERMANENTLY SEED OR OTHERWISE STABILIZE THE REMAINING LANDSCAPED AREAS PER THE PLANS. 25. ONCE STONE BASE IS APPLIED, CALL EROSION CONTROL INSPECTOR FOR APPROVAL TO DECOMMISSION AND REMOVE THE SEDIMENT BASIN. CONTRACTOR SHALL USE A SILT BAG IF PUMPING OF WATER IS REQUIRED. IF SOILS ARE OVERLY WET AND UNABLE TO BE TRANSPORTED, CONTRACTOR SHALL PROVIDE A SUITABLE AREA ADJACENT TO THE BASIN WHERE THE SOUPY SOILS CAN BE PLACED AND COMPLETELY SURROUNDED WITH SILT FENCE. SOILS SHALL BE DEPOSITED HERE AND ALLOWED TO DRAIN/DRY UNTIL THEY CAN BE LOADED INTO A TRUCK AND HAULED AWAY OR USED ON -SITE. 26. IF APPLICABLE, DECOMMISSION SKIMMER BASIN. DEWATER USING SILT BAGS PER DETAIL AND ALL REMAINING SILT MUST BE MUCKED OUT AND DISPOSED OF ACCORDINGLY. REGRADE AREA FOR THE FINAL SURFACE TREATMENTS AND SITE IMPROVEMENTS SHOWN. SUITABLE FILL SHALL BE USED TO ACHIEVE PERMANENT GRADES AS SHOWN. SUITABLE FILL AND PIPE BACKFILL TO BE CONFIRMED AND TESTED BY THIRD PARTY CMT FIRM. 27. SITE STABILIZATION IS REQUIRED PRIOR TO FINAL APPROVAL OF GRADING PERMIT AND ISSUANCE OF CERTIFICATE OF OCCUPANCY. GRASS UTILIZED AS PERMANENT GROUND COVER MUST BE AT A MOWABLE HEIGHT THAT GENERALLY PROVIDES AT LEAST 80% COVERAGE THROUGHOUT THE SITE, WITH NO LARGE BARE PATCHES OR EVIDENCE OF EROSION. 28. ONCE ALL AREAS ARE STABILIZED, CALL EROSION CONTROL OFFICER AT 919-545-8268 FOR INSPECTION AND APPROVAL TO REMOVE SILT FENCE AND OTHER REMAINING EROSION CONTROL MEASURES. 29. REMOVE MEASURES AND PLACE TOPSOIL AND PERMANENTLY SEED OR OTHERWISE STABILIZE THE REMAINING DISTURBED AREAS PER THE PLANS. 30. WHEN THE PROJECT IS COMPLETE, THE PERMITTEES SHALL CONTACT CHATHAM COUNTY TO CLOSE OUT THE E&SC PLAN. (NOTE: THIS PLAN OCCURS AT #78) SYMBOLS DISTURBED AREA: 130,680 SF (3.00 AC) ONSI TE: 87,120 SF (2.00 AC) 1 OFFSITE. 43,560 SF 0.00 AC) GRAPHIC SCALE 20 0 10 20 40 80 (IN FEET) Know what's below. 7 inch = 40 ft. Cal l before ou di Y 9' LEGEND & NOMENCLATURE LINETYPES ABBREVIATIONS Ex. iron pipe/rod or nail X Fence DB Deed Book 0 Ex. concrete monument SF Silt Fence PB or BM Plat or Map Book 10 New iron pipe LD Limited disturbance N/F Now or formerly IS Calculated point SD Prop. storm drain p9, Page © Cable pedestal /'�� Extents of Clearing/ SF Square feet Telephone pedestal New Tree Line Ac. Acres Existing Tree Line E❑ Electric pedestal ��,,,� Baffles R/W Right-of-way Fiber-optic marker Diversion NCSR NC State Route Traffic signal box NCDOT NC Dept. of Trans. 0 Water meter NOTES SYMBOLS R/W Right-of-way Fire hydrant CE O Construction Entrance/Exit Ex. Existing Valve (water or gas) RCP Reinforced concrete pipe ODD S Sanitary sewer manhole Temporary Diversion Ditch PVC Polyvinyl chloride pipe Sanitary sewer cleanout PD Permanent Diversion Ditch K Measured Storm curb inlet IP Inlet Protection AG Above ground Drainage inlet (w/grate) SB Slope Blanket BG Below ground OStorm drain manhole SF Silt Fence Utility pole FO Silt Fence Outlet Lamp post SW Straw Wattle Signal pole TS Temporary Seeding 1 Guy wire PS Permanent Seeding Sign post Straw Wattle TP Tree Protection Fence Silt Fence Outlet CW Concrete Washout Area 1.0000 0p0O00l Inlet Protection Silt Bag Dewatering o 0 0 (Block &Gravel or o00000o Hardware Cloth) NCDENR SELF -INSPECTION PROGRAM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR Q LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TAKE EFFECT OCTOBER 12010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FORM THE LAND QUALITY WEB SITE. h ttp://portal. ncdenr. org/web/lr/erosion LD - LD - LD - 46 4-------- J LD I - LD EXTEND SILT FENCE TO g REAR OF PROPERTYJUST BEYOND LARGE CEDAR TREE I ,I 9 L462 s / 460 N/F ALAN R. BERG AND WIFE, MELISSA PIN: 0789-25-0023 DB: 1537711627 BM: 19841884 EXISTING--------� (LOT 9) DRAINAGE CHANNEL J � 11 PROVIDE 12" BERM TO DIRECT / 2 \ CW WATER TO SFO AS SHOWN. THIS BERM IS TO BE REPAIRED DAILY FROM CONSTRUCTION TRAFFIC. PROVIDE STONE CHECK DAM OR EQUIVALENT AT OUTLET OF DIVERSION BERM. 11 0 PROVIDE SILT FENCE TO CONTAIN ALL DISTURBED F AREAS & MULCH PILES STABILIZE DISTURBED AREAS _ o ADJACENT TO DRAINAGE I CONVEYANCE, INCLUDING SIDE SLOPES WITH NATURAL GROUND COVER I 0 i I 0 -450- / N I o al V I o I 6 �I I I / o �I 0 4 N� I EXTEND EXISTING SILT l o FENCE ON BOTH ENDS _ TO INCLUDE 2 TREES TO / G BE REMOVED AND / DRAINS TO SILT FENCE/ r o OUTLET 5� o('SF�0I o TYP I STABILIZE 6 9 DISTURBED 6 REAS WI 1 I AGROUNDH I ° COVER v o 0 p \ [O g `p, D, `o PROVIDED NOTE THAT IT IS EXPECTED UTILITIES D �O DITCH ALONG WILL BE TRENCHED TO HOUSE IN THIS 6 DRIVEWAY GENERAL AREA. CONTRACTOR SHALL SEED & STRAW IMMEDIATELY STABILIZE DISTURBED BARE AREAS ON AREAS WITH SEED & STRAW SIDE OF DRIVE I I o I o I SF 1� /keg I I I EXISTING \ DRIVEWAY 1 0 PIPE ° I I VqLLEyL - o o so p ANE � / / U&IC Row °) /a v CE 75OLF FROM 50' PUBLIC ROW TO DRAIN FIELD VIA o 75' UTILITY EASEMENT ^ / 6' AREA FOR MAXIMUM 4" TRENCH WITH PUMP S SEWER LINEDTELLYOFFSITE SEPTIC.IMMED/ATELY 1 44 �'00, 1 STABILIZE WITH SEED AND � /z STRAW UPON TRENCH / e, COMPLETION SILT FENCE ON EAST SIDE OF PROPERTY TO MATCH WEST. ENSURE ALL UPLAND DISTUR AREAS ARE CAPTURED. N/F DONALD NYE AND WIFE, WHITNEY T. PIN: 0789-14-7985 DB: 171971736 BM: 79841884 (LOT 17) ADD SHORT SILT FENCE AND SILT FENCE OUTLET PROTECTION IN DITCH OR RIPRAP CHECK DAM TO FILTER WATER PRIOR TO ENTERING SWALE ALONG VALLEY LANE H � W Ln a 1 C r- z.oz 00 � 00 �� Ey ' a� Q M x Ln Irk W � I� J J U J L a 19 z O II InW UI W W z �o � CC Ov LD CL ❑W�DE. In U O ED Nl�p �ZM i � � O � M J O O U L^fj iWm�CaJN Ur0 Qj Z (v a U v al �I11 a - SEA r: N N W N Q O C o T 75OLF FROM DRAIN FIELD VIA 75' UTILITY [�E EASEMENT TO 50' - IMMEDIATELY SEED, a PUBLIC ROW STRAW, AND STABILIZE REPAIR SEPTIC AREA DISTURBED AREAS UPON \ \ / 0(1- INSTALLATION OF DRAIN FIELD AND - LD LD � DISTRIBUTION BOX. / LD LD � LD 7` LD LD LD LD LD \ / ,I / S 6' AREA FOR MAXIMUM 4" 6 00 TRENCH WITH PUMP \ L SEWER LINE TO OFFSITE SEPTIC. IMMEDIATELY STABILIZE WITH SEED AND o STRAW UPON TRENCH \ I COMPLETION. l a, D, / D pl D, Ol 0l � I D, C11- p, PUMP LINE. MINIMUM 5' - °' 01 - O, J SETBACK FROM PROPERTY LINE OFFSITE SEPTIC AREA SCALE: 1" = 40' .. .. .. .. .. .. .. .. .. .. .. .. . W H> W W UU� WWI �I Lrl �I MI N F-� N N �U OQ r_, Z o U O�� Z �-I U c� cc W C3 PROJECT #: 21-017 REVIEW PROJECT #: SHEET #: C-1.1