Loading...
HomeMy WebLinkAbout310417_Compliance Evaluation Inspection_202103150 Division. of Water• Resources Facility'Nunlbei " = t}l 0`D4vision of Soil and Water Conservation° tJ 0 Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: I I p.•- Departure Time: 1 a County: LtlJ Region: A_ Farm Name: b a('o sTy-M -P fj( MP.-k Owner Email: Owner Name:y-,e i Phone: Mailing Address: -'- Physical Address: Facility Contact: OnsiteRepresentative: r-!21 !SA r9%Jel Certified Operator: Sx_ra4 Back-up Operator: Location of Farm: ,, Swi e, , a Title: Latitude: Phone:. Integrator: Certification Number: Certification Number: Longitude: Design . Current . Design . Current, Capacity" • Pop. Wet Poultry Capacity 'Pop: ' "' ; Cattle, Wean to Finish Wean to Feeder Feeder to Finish v p I q ot Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars ;Other, . . Other Layer Non -Layer Design- Current:° Ury Pnultry Canacitv Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other ,=Design .Current ` Capacity. Pop"n Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes dNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes N ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes 9To ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o 'No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facility Number: 3 Date of Inspection: - 5- Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes YNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes YNo ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): j q, Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes []No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes E 1Ve ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environments threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes YNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [ZNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [Z No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): &(X_0 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Q No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E2,No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E2*No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes EZ�N'o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 6/No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes []2No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes F3/No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes []No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E NT ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: 31 - Date of Inspection: 3-1197—off 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes ZNC ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop,a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes eNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No E3 A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [] No ❑ NA ❑ NE ❑ Yes ER/No ❑ NA ❑ NE ❑ Yes [Z/No ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE ❑ Yes ❑/�o ❑ Yes 70 ❑ Yes � No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pates as necessary). ,S{ro�J-i l� 5crt� CC Cc,n y ( VrC kSeC h',S ��C��•��/ 0.�nCA Is 1 j t�}41i N J �.r „i S �! S / �eJ CaCi N) P4P�r 1.1ork S Ui fo I da_tP Wi f — CVmv�ed r o+Y t iS• Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 10 pz'A42- Phone: Nos)613-9577 Date: 511212020