HomeMy WebLinkAbout310485_Compliance Evaluation Inspection_20210308U' Division of Water Resources p� —
Facility Number 3 - yT 5 0 Division of Soil and Water Conservation
0 Other Agency
Visit: D Co 7 Hance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time:'�`L Departure Time: County: Region: U I P-0
Farm Name: Doss T 0 & Owner Email:
Owner Name: . \e.rrN Qhs Phone:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator: �.rjja hj
IL
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Title:
Integrator:
Phone:
Certification Number: ' a�
Certification Number:
Latitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
Non -Layer
Design Current
Dry Poultry Canaeity Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes [3/No ❑ NA ❑ NE
❑ Yes
No
❑ NA
❑ NE
❑ Yes
E2/No
❑ NA
❑ NE
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes N ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes VNoNo ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters [:]Yes [ /No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 21412015 Continued
Facility Number: -_-�l - Date of inspection: 3 S—al
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [jNo ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):19 S
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? ElYes No ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes L2 I /No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes V o ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes�Z<o ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes LLJ N o ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes ZNo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 2 No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): ( To f �p
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
[ No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
]["No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
2No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
o
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
WNo
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
[d No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
ENo
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes �o
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �No
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E]KN0
❑NA ❑NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑ NA ❑ NE
Page 2 of 3 21412015 Continued
Facility Number: ° j" - Date of inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ZNo
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ffNo
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ZNo
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑NA ONE
❑NA ❑NE
❑NA ❑NE
Fa"NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Yes [:a�o ❑ NA ❑ NE
❑ Yes 2No ❑ NA ❑ NE
❑ Yes Z�10 ❑ NA ❑ NE
❑ Yes ZNo ❑ NA ❑ NE
❑ Yes LJ-No ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pales as necessary).
" SS
Reviewer/Inspector Name
Reviewer/Inspector Signature:
Page 3 of 3
\o1n1A
Phone:
Date:
511212020