Loading...
HomeMy WebLinkAboutNCC210705_Modification Review_20210322Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 3/22/2021 8:28:30 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 3/22/2021 12:56:22 PM (Construction COC ADD TO FILE Review- NCC210705) • The task was assigned to Georgoulias, Bethany. The due date is: March 25, 2021 5:00 PM 3/22/2021 8:28 AM Y . Ta4M1 NORTH CAPOLINA EnYlmnmPnf& Qualify Certificate of NCC210705 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit: Project Name Quarry Hills Phase 1 West Address George Bason Road, Swepsonville, NC County Alamance Latitude 36.0312 Longitude -79.3600 Permittee Listed Desco GC Invest, LLC Legally Responsible Eric Dischinger Individual NC Reference No. NCG01-2021-0705 E&SC Plan ID Alama-2020-022 Original NOI 42703 Tracking No.* Date COC Issued* 02/17/2021 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed f Multiple Reasons (List) Addional IVbre information (e.g., new Site Contact details). If lots are being added, please include specific lot nurTbers. Explanation You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (%vised ERSC Approval, (lose -Out Doc, etc.) Documentation ALAMA-2020-022_Revision_A-M 20210317.pdf 6.45MB Mast be FDFfon-rat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). 17 I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual r Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Eric Dischinger Title * Manager Organization* Desco GC Invest, LLC Date * 03/22/2021 Email Address* eric@descoinvest.com Errail for confirmation Telephone Number* 336-317-3395 Contact nun ber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email adl@evans-eng.com (Optional) Additional errail for confirmation Original Permittee eric@descoinvest.com Email Original Site Contact dsullivan@descoinvest.com Email Review Date 03/22/2021 Rescinded Since Submitted? Request Date 20210322 Formatted Review Date 20210322 Formatted