Loading...
HomeMy WebLinkAbout20120600 Ver 1_DCM Permit_20120904.. ,.w r.�...< . r+ .•.s -. , .- r_r, -:r�. ^ -� ir�..r- r^^_._ ..rnt .-,- -,.. i ^- -r ,. ^ ^r • - °^...'..- ,• r• ^vy .- . N.K - .�s.l. -. �. s,. :..r w• - • ^s,r•''i r X TVaicr �� ?` '.lor'nen' it yin Ar ,,a Concer:1 Pursuant to X Excavation and /or filling pursuant to I`iCOS 113 -229 Issued to James Beasley, David Farrow and Bruce Shepherd, PO Box 38, Colerain, NC 27924 Authorizing development in Hertford, Bertie, Chowan and Gates in the Chowan River, near Colerain north to near Mintonsville and near Harrellsville, as requested in the permittee's application dated 5/22/12, including attached workplan drawings (3), all dated 5/26/12 and location map. This permit, issued on September 4, 2012 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Log Recovery 1) Log salvage operations shall only be carried out at the four sites depicted on the attached location map. Salvage from any additional area shall require a modification of this permit. (See attached sheet for Additional Conditions) This pen-nit action may be appealed by the permittee or ether qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2015 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chaii man of the Coastal RCSOUICCS Commission. 17, i✓^'i -•^ J D f Braxtont—bdavis, Director ivision of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee +.. ,,... .,sa..+ ,� r .... r.... �..5+/,. }� .. nn. -_s. ...NV ..�. �.�.s.r� v .. c-+. , ...,_ _.. > .. _,. ✓._.__ _ �,. t. _. .. ,..., J,., .+- .. ., _� ..... . -.. �,r - .�r.;.4>.. .)..,.,.,. -.n -so-.. .... �.- j2mes E a.:le-" D.IV•i43 Farrow and Bruce Sheph ; in,t r 161 -12 2 of � r %,'r:T be � �r. An-% 11 i r .11_i_..�. lv �C'ii_�tIC? 3�yi `' c: .'b "I,a'. lit L_ .iC l' t_ii� d' ".:. Sil > °tl'i: ., al:'�i a lI %i [ _„ �t' ,. % %': or ' F As s req - -i, . �d by lv.0 G.S 12 1 Ar tic 1E; _ prior to t I I e con-. m e n c me; r of a ny � t, g e o 1 a o n`: t h p� rrru? Pe Fhall api-ly for and receive n undo,-_ o atc:- arcaaeoloC -, I'a"m t-,e '�'.C. Derp rtmen, of Cultt'cu.'• l .sources. r @DOTE: Failure to adhere to the requirements of the permit referenced in Condition No. 6 of this permit may result in a violation of this permit. it" No logs, timbers, trees or other debris shall be removed, repositioned. or stored in a manner that the Division of Coastal Management determines would represent a navigational safety hazard. Materials not intended to be taken to a shore support site shall be repositioned (unburied) as close to its original position as possible. 5) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 6) This permit does not authorize the removal or salvage of any object or material other than submerged logs. 7) The permittee shall maintain a comprehensive listing of the number of logs removed, sizes of such logs and general location of where the logs were recovered. Copies of this report shall be submitted to the Division of Coastal Management by March 1St of each year that this permit is active. Failure to provide this report by the March 1St deadline may result in a violation of this permit. 8) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily. 9) The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. MOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 964 -6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No. 2012 -0600.