HomeMy WebLinkAbout20210364 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210319Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, March 19, 2021 12:02 AM
To: suzanne.herron@eli-Ilc.com
Cc: Goss, Stephanie
Subject: Pre -Filing Time Clock has been reached for PNG Line 142 Pipeline - 20210364 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for PNG Line 142
Pipeline that you submitted on 2/16/2021. The ID number for that project is 20210364, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20210364 Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 2/16/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Suzanne Herron
suzanne.herron@eli-Ilc.com
PNG Line 142 Pipeline
Piedmont Natural Gas
Wake
Street Address
multiple
Address Line 2
aty
Garner
Fbstal / Zip Code
27529
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Province / Region
NC
Country
us
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
Energy Land & Infrastructure, PLLC (ELI) is a contractor for Piedmont
Natural Gas and has been retained to perform
survey, permitting, and engineering design services for the new Line
142 Pipeline project. This proposed
pipeline is being constructed to keep up with estimated customer
growth in the area. In order to meet
customer demand, Piedmont plans to expand its system through the
installation of approximately 10
miles of 12-inch diameter steel transmission main from the Clayton
Compressor Station in Wake County,
North Carolina to a location near the intersection of Covered Bridge
Road and Castleberry Road in
Johnston County, North Carolina. A new regulator station will be
installed at the termination point of the
new pipeline along with approximately 2,600 feet of steel distribution
main. The proposed easement
along the pipeline will be 50 feet in width. The temporary construction
easement varies in width but is
generally 30 feet wide.
Please give a couple of dates you are available for a meeting.
3/1 /2021
2/25/2021
Please attach the documentation you would like to have the meeting about.
Location Map.pdf 371.12KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 2/16/2021