Loading...
HomeMy WebLinkAbout20210364 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210319Strickland, Bev From: laserfiche@ncdenr.gov Sent: Friday, March 19, 2021 12:02 AM To: suzanne.herron@eli-Ilc.com Cc: Goss, Stephanie Subject: Pre -Filing Time Clock has been reached for PNG Line 142 Pipeline - 20210364 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for PNG Line 142 Pipeline that you submitted on 2/16/2021. The ID number for that project is 20210364, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20210364 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 2/16/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Suzanne Herron suzanne.herron@eli-Ilc.com PNG Line 142 Pipeline Piedmont Natural Gas Wake Street Address multiple Address Line 2 aty Garner Fbstal / Zip Code 27529 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Province / Region NC Country us Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * Energy Land & Infrastructure, PLLC (ELI) is a contractor for Piedmont Natural Gas and has been retained to perform survey, permitting, and engineering design services for the new Line 142 Pipeline project. This proposed pipeline is being constructed to keep up with estimated customer growth in the area. In order to meet customer demand, Piedmont plans to expand its system through the installation of approximately 10 miles of 12-inch diameter steel transmission main from the Clayton Compressor Station in Wake County, North Carolina to a location near the intersection of Covered Bridge Road and Castleberry Road in Johnston County, North Carolina. A new regulator station will be installed at the termination point of the new pipeline along with approximately 2,600 feet of steel distribution main. The proposed easement along the pipeline will be 50 feet in width. The temporary construction easement varies in width but is generally 30 feet wide. Please give a couple of dates you are available for a meeting. 3/1 /2021 2/25/2021 Please attach the documentation you would like to have the meeting about. Location Map.pdf 371.12KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/16/2021