Loading...
HomeMy WebLinkAboutNCC211695_Site Plan or Location Map_20210322BREAK SILT FENCE 6' WIDE AND INSTALL SILT FENCE STONE OUTLET IN LINE WITH SILT FENCE ALONG THE OUTFALL (TYP) �9 C PROPERTY LINE (TYP) m Z _0 aN sm f � 0 m n 0 LIMITS OF DISTURBANCE (TYP) - SILT FENCE (TYP) �i eCn e • • POROUS BAFFLES (TYP) EROSION CONTROL NOTES - CONSTRUCTION SEQUENCE 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM THE CITY OF CHARLOTTE ENGINEERING DEPARTMENT. 2. SET UP A ON -SITE PRE -CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR OF THE CITY ENGINEERING DEPARTMENT TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF CHAPTER 17 OF THE CITY CODE AND IS SUBJECT TO FINE. 3. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT TRAPS, DIVERSION DITCHES, TREE PROTECTION, AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4. CALL FOR ON -SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING AND GRUBBING MAY BEGIN. 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 6. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. 7. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 8. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURE. 9 ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N C EROSION CONTROL NOTES - TREE SAVE AND PRESERVATION 1. TREE PROTECTION MUST BE INSTALLED AND VERIFIED BY URBAN FORESTRY PRIOR TO STARTING ANY CONSTRUCTION ACTIVITY, 2. SHOW TREE PROTECTION AND TREES SAVE AREAS ON DEMO, EROSION CONTROL, GRADING AND LANDSCAPE PLAN SHEETS. 3. COMMERCIAL TREE SAVE AREAS MUST BE RECORDED ON A FINAL PLAT WITH THE MECKLENBURG COUNTY REGISTER OF DEEDS BEFORE URBAN FORESTRY HOLDS CAN BE RELEASED. A 10' NO BUILD ZONE AROUND TREE SAVE AREAS MUST BE REFERENCED ON THE PLAT. 4. TREE SAVE AREAS SHALL BE FREE OF INVASIVE PLANT SPECIES. IF AN AREA PROPOSED FOR TREE SAVE CONTAINS INVASIVE PLANT SPECIES AT TIME OF PROPOSAL, SUCH INVASIVE PLANT SPECIES SHALL BE REMOVED PRIOR TO FINAL CO. 5. THE AREA OF ANY EASEMENTS (WATER, SEWER, UTILITY, ETC.) CAN NOT BE \62s / EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE, COUNTED TOWARD THE TREE SAVE REQUIREMENT. 625 - CITY OF CHARLOTTE EROSION CONTROL ORDINANCE, AND THE CHARLOTTE LAND DEVELOPMENT �6. ANY ACTIVITY WITHIN TREE SAVE AREAS MUST BE ACCOMPLISHED WITHOUT STANDARDS MANUAL. MECHANIZED EQUIPMENT. / 617 s �� 'f 9 LIMITS OF DISTURBANCE (TYP) 617 OSl G81 OSl Gel \ / SILT FENCE (TYP) \ 620 1 Gel GSl G81 GSl / o - -- - � TREE PROTECTION = 6 2 5 n 626 625 - - - - FENCE (TYP) \ TO � \ � I I I _ _ \ - - II I III r \ -625 - / �o/� SKIMMER / TEMPORARY SLOPE /DRAIN (TYP)SEDIMENT BASIN 01 TEMPORARY FIO OK ERSIO62 63o- TEMPORARY DIVN r FILTER RING (TYP) 111 TD-TD / 6 633- SWALE(TYP) \ 1 IIII I� rn\ - / ROCK CHECK TO DAM (TYP) rp`rG=-�rn: ro ROCK CHECK \ \\ \ ) / / ` - J 636/�~rp~ DAM (TYP) TEMPORARY DIVERSION / / / / _ / - - - -637_ I I I I I SWALE (TYP) / / / / / - -- - �� \ Z ---------- �- 639-- \\\_ / a UI I I I I 1 I II / °B /�----640- / - - - - 6 41- - -� jQ - _ \\ DRAINAGE BOUNDARY (TYP) / \ OPERTY LINE (TYP) I - EROSION CONTROL NOTES - GENERAL NOTES 1. ALL "STD." NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL 2. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 3. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 4. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 5. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE CITY ENGINEERING DEPARTMENT. 7. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING [CLDSM #30.16]. 8. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. 9. TEMPORARY GROUND COVER MUST BE PROVIDED PER NCDEQ STD. 6.10 & 6.11. 10. ALL DITCHES MUST BE LINED IMMEDIATELY IF REQUIRED AND STABLIZED PER NCDEQ STD. 6.10 & 6.11. 11. SOILS: CeB2. CeD2. MO. PaE. PaF. WkE 12. DENUDED LIMITS: 16.10 AC, 'o HIG AZARD DOUBLE ROW S FENCE (TYP) BREAK SILT FENCE 6' WIDE AND INSTALL SILT FENCE STONE OUTLET IN LINE WITH SILT FENCE ALONG //// // i /r _ - I I DRAINAGE BOUNDARY (TYP) /// // / r I \ / / THE OUTFACE (TYP) /i�i // / ROCK CHECK DAM (TYP) TEMPORARY DIVERSION SWALE (TYP) III \ \ \ �o ° / ( I I - i i�//i �// /// ✓ _ / \ �/ ��p EXISTINGI I I \ \ \ \ I ////\ I I I TEMPORARY DIVERSION / / \ // WETLAND L / I� SWALE (TYP) ://� /to/ / - - A < A \ �� \ / / ffro 25�°`4B4p s �\ \ \ TEMPORARY ROCK I I 45FILTER RING (TYP) \" / - TEMPORARY SLOPES �° �3° ✓ \ \ DRAIN TYP \ I " ° I ( ) SKIMMER CS 11111601 -- - POROUS_SEDIMENT BREAK SILT FENCE 6' WIDE AND I \ f4s�a,., \ \ \ \ \ \ SKIMMER I I BAFFLES (TYP) �� ° INSTALL SILT FENCE STONE OUTLET � \ \ 110 LF 18" RCP \ \ \ \ \' \ SEDIMENT I I I I BASIN 02-B \ \ / \ / / IN LINE WITH SILT FENCE ALONG I V 0 1.00% v \ \ v BASIN 02-A v I �' 645 THE OUTFALL (TYP) \ A �� \ \ \ \ ,a \ \ \ \ \ �y I / L CONCRETE WASHOUT (TYP) \ G40 v 638 y v� \ 635 635 / 0 634 635 V 634` > / STABILIZED CONSTRUCTION ENTRANCE (TYP) 629 s s3S\ \ \ \ \ INV : 62850 GS_ �f M�f � 1 1 • • P \ / \ / INV : 628V-0 / i60 \ y PB yf4 / /N 58•40'57• E \ � \ \ J.") \ s OD - _ / I / / \ FILTER BAG �� �-� •• \ \ \ / � � \ \ FILTER BAG INLET PROTECTION (TYP) CONCRETE WASHOUT (TYP) STABILIZED CONSTRUCTION �6v / ENTRANCE (TYP) EROSION CONTROL NOTES - SEC. 17.35(a)(9) EFFORT SHOULD BE MADE NOT TO UNCOVER MORE THAN 20 ACRES AT ANY ONE TIME. IF MORE THAN 20 ACRES ARE TO BE UNCOVERED AT ANY ONE TIME, THE PLAN SHALL CONTAIN THE FOLLOWING: A. THE METHOD OF LIMITING THE TIME OF EXPOSURE AND AMOUNT OF EXPOSED AREA TO ACHIEVE THE OBJECTIVES OF THIS CHAPTER. B. A CUT/FILL ANALYSIS THAT SHOWS WHERE SOIL WILL BE MOVED FROM ONE AREA OF THE TRACT TO ANOTHER AS GROUND ELEVATION IS CHANGED. C. CONSTRUCTION SEQUENCE AND CONSTRUCTION PHASING TO JUSTIFY THE TIME AND AMOUNT OF EXPOSURE. D. TECHNIQUES TO BE USED TO PREVENT SEDIMENTATION ASSOCIATED WITH LARGER DISTURBED AREAS. E. ADDITIONAL EROSION CONTROL MEASURES, STRUCTURES, AND DEVICES TO PREVENT SEDIMENTATION. EROSION CONTROL LEGEND DESCRIPTION PLAN SYMBOL DESCRIPTION PLAN SYMBOL SILT FENCE SILT FENCE OUTLET SILT FENCE - HIGH HAZARD DOUBLE ROW RIP RAP OUTLET PROTECTION TREE PROTECTION FENCE -❑-❑-❑-❑-❑ ROCK CHECK DAM CLEARING LIMITS CL CL STABILIZED CONSTRUCTION ENTRANCE LIMITS OF DISTURBANCE LOD BLOCK 81 GRAVEL INLET PROTECTION TEMPORARY DIVERSION SWALE T D I FILTER BAG CATCH BASIN INLET PROTECTION TEMPORARY SEEDING TS DRAINAGE AREA BOUNDARY PERMANENT SEEDING PS TEMPORARY SLOPE DRAIN T D FILTER RING INLET PROTECTION L I � I I y la GRAPHIC SCALE 0 , / 30 /X160 120 IN FEET ) I inch = 60 ft. 240 o i z z Go y i <0c m U OszOL� =Z o o �cS- dCC)z z w cQ 0 NO O O �J c W cn 6 z E O n1 N w � v a � � o _ m Y U "' a m � o (1) U) z z O w � 0 O w U z F- w (n w a O a J w w G: cn w , 0 w p Z 3 Q O J c� m jzo L0 CD L0 Z L O Q p O �o U 0 CC 00 O 2 �0 1 T i U co �N Lu U o N 0 E CV Z o � O 0 3 U U) U 0- Z - J a w z Z a Z � o , z 0 f a w a ' 0- Z Ld 0 J m W W w F- D Z Z o U W o a z U) Fx F-- U)W O D w U U a w 0- JOB NO: J-28270 0000 DATE: 7/29/20 DRAWN: BDH DESIGNED: BDH REVIEWED: MSK APPROVED: MSK SCALE: I" = 60' ECloO..j J Z O w N O d a w w 0 LL H w H w a - 641 \ I 642 HARDWARE CLOTH & GRAVEL a INLET PROTECTION (TYP) I I IIII � I I / Ye9 I I / _ I III - ' 'd"- SILT FENCE (TYP) � I I I II I IIII / LIMITS OF DISTURBANCE (TYP) PROPERTY LINE (TYP) I 11 I J / 5/ �° j ///////////// I • / 3. 668- - I I I I \ \ 1 A V \ \ FILTER BAG INLET / I / ///jw 66 PROTECTION (TYP)10 (l / \ r Q \ \ F4sFMr \\ \ \ \\ \ I I I \\ \I �a� a BREAK SILT FENCE 6' WIDE AND Fp po Oe 4pfReo INSTALL SILT FENCE STONE OUTLET ?S0j3 IN LINE WITH SILT FENCE ALONG a23S<<� THE OUTFALL (TYP) \ AI \ \I I \ _Q�y^ 5 PUTICITyp' l ll� s { gSE pGMgqT 1 \ 1 620 -- / I iRSM� es,o, Q \ / / _ s sWfR fq - 6 zo PGS,yfNT / EROSION CONTROL CONSTRUCTION SEQUENCE 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM THE CITY OF CHARLOTTE ENGINEERING DEPARTMENT. 2. SET UP A ON -SITE PRE -CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR OF THE CITY ENGINEERING DEPARTMENT TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF CHAPTER 17 OF THE CITY CODE AND IS SUBJECT TO FINE. 3. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT TRAPS, DIVERSION DITCHES, TREE PROTECTION, AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4. CALL FOR ON -SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING AND GRUBBING MAY BEGIN. 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 6. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. 7. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 8. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURE. 9. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE, CITY OF CHARLOTTE EROSION CONTROL ORDINANCE, AND THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. of e•. ia. �i i ..u..cr,,• / r---- ma.`e.�..... , ' r r / ..�' ..... _ ... ..' r /tee.:..+- ......... _ ae..r e..aa vc.� r• � r . ll - �o / I 11p / I11 0100,0 -• • • -• i0001,100 id lllllll ' ' • • �111 I I IIIIII%� I (POT! j p� lid UI1//1 -90 EROSION CONTROL NOTES - TREE SAVE AND PRESERVATION 1. TREE PROTECTION MUST BE INSTALLED AND VERIFIED BY URBAN FORESTRY PRIOR TO STARTING ANY CONSTRUCTION ACTIVITY. 2. SHOW TREE PROTECTION AND TREES SAVE AREAS ON DEMO, EROSION CONTROL, GRADING AND LANDSCAPE PLAN SHEETS. 3. COMMERCIAL TREE SAVE AREAS MUST BE RECORDED ON A FINAL PLAT WITH THE MECKLENBURG COUNTY REGISTER OF DEEDS BEFORE URBAN FORESTRY HOLDS CAN BE RELEASED. A 10' NO BUILD ZONE AROUND TREE SAVE AREAS MUST BE REFERENCED ON THE PLAT. 4. TREE SAVE AREAS SHALL BE FREE OF INVASIVE PLANT SPECIES. IF AN AREA PROPOSED FOR TREE SAVE CONTAINS INVASIVE PLANT SPECIES AT TIME OF PROPOSAL, SUCH INVASIVE PLANT SPECIES SHALL BE REMOVED PRIOR TO FINAL CO. 5. THE AREA OF ANY EASEMENTS (WATER, SEWER, UTILITY, ETC.) CAN NOT BE COUNTED TOWARD THE TREE SAVE REQUIREMENT. 6. ANY ACTIVITY WITHIN TREE SAVE AREAS MUST BE ACCOMPLISHED WITHOUT MECHANIZED EQUIPMENT. EROSION CONTROL NOTES - GENERAL NOTES 1. ALL "STD."NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL 2. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 3. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE CITY COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 4. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION \ OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 5. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION \ WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN \ ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A \� REPRESENTATIVE OF THE CITY ENGINEERING DEPARTMENT. / a� SSM \ 7. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING [CLDSM #30.16]. 8. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT / \ PREVIOUSLY APPROVED. / 9. TEMPORARY GROUND COVER MUST BE PROVIDED PER NCDEQ STD. 6.10 & 6.11. 10. ALL DITCHES MUST BE LINED IMMEDIATELY IF REQUIRED AND STABLIZED PER NCDEQ STD. 6.10 & 6.11. 3°a 11. SOILS: CeB2. CeD2. MO. PaE. PaF. WkE / \ 12. DENUDED LIMITS: 16.10 AC, \ \I\ 'Ire I zit /q1'a� o � 4 EXISTING WETLAND / <pO > V L- \ \ \ boo \ \\ 641::- 4 39 \ ••p \ \ 41 s4o \ - '-'8t I // / CONCRETE WASHOUT (TYP) 638-637- V \ 640-639- -636�635 V I 634 \ \ 637 636 \ \ \ 6 3-632- 631�\ 634 STABILIZED CONSTRUCTION \ \-630�629 \ \ / / / / - ENTRANCE (TYP) v v SKIMMER SEDIMENT \ \ SKIMMER FME"tiF �� BASIN 02-A \ F64z \ SEDIMENT / s �� �eRz3s II 635 v\ BASIN 02-5 �6 �(D N D \ �\ cz \ I I 1 � / � � /// /�_ =\ \ \�24�"9�r"fro�' � `� S l/• • \ �0 O \0 OR�JjER�W\ / OD 1 op P. w ojN / PR p / m CONCRETE WASHOUT (TYP) I �'7 STABILIZED CONSTRUCTION ENTRANCE (TYP) \\ \\\\\ \\ \\\ 1/II ✓ I \ I ��� \/\ / / / / / --- - v \ vv EROSION CONTROL NOTES - SEC. 17.35(a)(9) EFFORT SHOULD BE MADE NOT TO UNCOVER MORE THAN 20 ACRES AT ANY ONE TIME. IF MORE THAN 20 ACRES ARE TO BE UNCOVERED AT ANY ONE TIME, THE PLAN SHALL CONTAIN THE FOLLOWING: A. THE METHOD OF LIMITING THE TIME OF EXPOSURE AND AMOUNT OF EXPOSED AREA TO ACHIEVE THE OBJECTIVES OF THIS CHAPTER. B. A CUT/FILL ANALYSIS THAT SHOWS WHERE SOIL WILL BE MOVED FROM ONE AREA OF THE TRACT TO ANOTHER AS GROUND ELEVATION IS CHANGED. C. CONSTRUCTION SEQUENCE AND CONSTRUCTION PHASING TO JUSTIFY THE TIME AND AMOUNT OF EXPOSURE. D. TECHNIQUES TO BE USED TO PREVENT SEDIMENTATION ASSOCIATED WITH LARGER DISTURBED AREAS. E. ADDITIONAL EROSION CONTROL MEASURES, STRUCTURES, AND DEVICES TO PREVENT SEDIMENTATION. EROSION CONTROL LEGEND DESCRIPTION PLAN SYMBOL DESCRIPTION PLAN SYMBOL SILT FENCE SILT FENCE OUTLET SILT FENCE - HIGH HAZARD DOUBLE ROW RIP RAP OUTLET PROTECTION TREE PROTECTION FENCE -❑-❑-❑-❑-❑ ROCK CHECK DAM CLEARING LIMITS CL CL STABILIZED CONSTRUCTION ENTRANCE LIMITS OF DISTURBANCE LOD BLOCK a GRAVEL INLET PROTECTION TEMPORARY DIVERSION SWALE T D I FILTER BAG CATCH BASIN INLET PROTECTION TEMPORARY SEEDING TS DRAINAGE AREA BOUNDARY PERMANENT SEEDING PS TEMPORARY SLOPE DRAIN T D FILTER RING INLET PROTECTION NAG S75 SLOPE MATTING L I \ \ I I l ///-GRAPHIC SCALE -\ --' 60 ,_ , 0�30 X,.o120 IN FEET ) 1 inch = 60 ft. 240 O zz � y W 0 E m � ► < = Q U LLJ 0 a c O L - =Z Z U o __- - o �cS dCC)z z Ld cQ ````` �o = 0�3cs �J 0:) W cn = U Z W 0� . co E O _ O N N N w v `r a N o -�Co Y U O } U) N H z z o w �2 0 O w U w F- W cn g z w IL w D o g CY w w O cr > U <n w O H ix w o z 3 a o O J U cD m a Z L0 CD L0 Z L O Qp O Do U 0 CC D 00 O Q N 0 1 i � N w U oZ � E CV O O 7- } 3 U W N . U a a Z H z W a 0 Q � W z O H O _ Z > 1 a z z o a � W J z O o = U p z o I- N D U) Ld Ii W V U J a Q W 0 JOB NO: J-26270 0000 DATE: 7/29/20 DRAWN: BDH DESIGNED: BDH REVIEWED: MSK APPROVED: MSK IIISCALE: I.. = 60' EC2*0 z O 0 W In O a a w w O LL H w W a