EROSION CONTROL NOTES - CONSTRUCTION SEQUENCE
1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM THE CITY OF CHARLOTTE ENGINEERING
DEPARTMENT.
2. SET UP A ON -SITE PRE -CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR OF THE
CITY ENGINEERING DEPARTMENT TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE
SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF
CHAPTER 17 OF THE CITY CODE AND IS SUBJECT TO FINE.
3. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT TRAPS, DIVERSION DITCHES, TREE PROTECTION,
AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE
DEVICES.
4. CALL FOR ON -SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING
PERMIT AND CLEARING AND GRUBBING MAY BEGIN.
5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES
AND STRUCTURES.
6. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL
INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES.
7. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE.
8. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL
MEASURE.
9 ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N C
EROSION CONTROL NOTES - TREE SAVE AND PRESERVATION
1. TREE PROTECTION MUST BE INSTALLED AND VERIFIED BY URBAN FORESTRY
PRIOR TO STARTING ANY CONSTRUCTION ACTIVITY,
2. SHOW TREE PROTECTION AND TREES SAVE AREAS ON DEMO, EROSION
CONTROL, GRADING AND LANDSCAPE PLAN SHEETS.
3. COMMERCIAL TREE SAVE AREAS MUST BE RECORDED ON A FINAL PLAT WITH
THE MECKLENBURG COUNTY REGISTER OF DEEDS BEFORE URBAN FORESTRY
HOLDS CAN BE RELEASED. A 10' NO BUILD ZONE AROUND TREE SAVE
AREAS MUST BE REFERENCED ON THE PLAT.
4. TREE SAVE AREAS SHALL BE FREE OF INVASIVE PLANT SPECIES. IF AN
AREA PROPOSED FOR TREE SAVE CONTAINS INVASIVE PLANT SPECIES AT
TIME OF PROPOSAL, SUCH INVASIVE PLANT SPECIES SHALL BE REMOVED
PRIOR TO FINAL CO.
5. THE AREA OF ANY EASEMENTS (WATER, SEWER, UTILITY, ETC.) CAN NOT BE
\62s / EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE, COUNTED TOWARD THE TREE SAVE REQUIREMENT.
625 - CITY OF CHARLOTTE EROSION CONTROL ORDINANCE, AND THE CHARLOTTE LAND DEVELOPMENT �6. ANY ACTIVITY WITHIN TREE SAVE AREAS MUST BE ACCOMPLISHED WITHOUT
STANDARDS MANUAL. MECHANIZED EQUIPMENT.
/ 617 s �� 'f 9 LIMITS OF DISTURBANCE (TYP)
617 OSl G81 OSl Gel \ / SILT FENCE (TYP)
\ 620 1 Gel GSl G81 GSl /
o
- -- - � TREE PROTECTION =
6 2 5 n 626 625 - - - -
FENCE (TYP) \ TO � \ �
I I I
_ _ \ - -
II I III r \ -625 - / �o/� SKIMMER / TEMPORARY SLOPE
/DRAIN (TYP)SEDIMENT
BASIN 01
TEMPORARY FIO OK ERSIO62 63o- TEMPORARY DIVN
r FILTER RING (TYP)
111 TD-TD / 6 633- SWALE(TYP)
\
1 IIII I� rn\
-
/ ROCK CHECK TO
DAM (TYP) rp`rG=-�rn: ro
ROCK CHECK \ \\ \ ) / / ` - J 636/�~rp~
DAM (TYP)
TEMPORARY DIVERSION / / / / _ / - - - -637_
I I I I I SWALE (TYP) / / / / / - -- - �� \ Z
---------- �- 639-- \\\_ / a
UI I I I I
1 I II / °B
/�----640-
/ - - - - 6 41- - -� jQ - _ \\
DRAINAGE BOUNDARY (TYP) / \
OPERTY LINE (TYP)
I -
EROSION CONTROL NOTES - GENERAL NOTES
1. ALL "STD." NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL
2. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING
ADMINISTRATOR.
3. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE
CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE.
4. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION
OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE.
5. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3
HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION
WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS
FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED
TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN
ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY.
6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A
REPRESENTATIVE OF THE CITY ENGINEERING DEPARTMENT.
7. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE
ADEQUATE TERRACING [CLDSM #30.16].
8. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT
PREVIOUSLY APPROVED.
9. TEMPORARY GROUND COVER MUST BE PROVIDED PER NCDEQ STD. 6.10 & 6.11.
10. ALL DITCHES MUST BE LINED IMMEDIATELY IF REQUIRED AND STABLIZED PER NCDEQ STD. 6.10 &
6.11.
11. SOILS: CeB2. CeD2. MO. PaE. PaF. WkE
12. DENUDED LIMITS: 16.10 AC,
'o
HIG AZARD DOUBLE ROW
S FENCE (TYP)
BREAK SILT FENCE 6' WIDE AND
INSTALL SILT FENCE STONE OUTLET
IN LINE WITH SILT FENCE ALONG
//// // i /r _ - I I
DRAINAGE BOUNDARY (TYP) /// // / r I \ / / THE OUTFACE (TYP)
/i�i // /
ROCK CHECK DAM
(TYP)
TEMPORARY DIVERSION
SWALE (TYP)
III \ \ \ �o ° / ( I I - i i�//i �// /// ✓ _ / \ �/ ��p EXISTINGI
I I \ \ \ \ I ////\ I I I TEMPORARY DIVERSION / / \
// WETLAND L /
I� SWALE (TYP) ://� /to/ / - - A < A \ �� \ / /
ffro 25�°`4B4p s �\ \ \ TEMPORARY ROCK
I I 45FILTER RING (TYP)
\"
/
-
TEMPORARY SLOPES
�° �3° ✓ \ \ DRAIN TYP \ I
" ° I ( ) SKIMMER CS 11111601 -- - POROUS_SEDIMENT
BREAK SILT FENCE 6' WIDE AND I \ f4s�a,., \ \ \ \ \ \ SKIMMER I I BAFFLES (TYP) �� °
INSTALL SILT FENCE STONE OUTLET � \ \ 110 LF 18" RCP \ \ \ \ \' \ SEDIMENT I I I I BASIN 02-B \ \ / \ / /
IN LINE WITH SILT FENCE ALONG I V 0 1.00% v \ \ v BASIN 02-A v I �' 645
THE OUTFALL (TYP) \ A �� \ \ \ \ ,a \ \ \ \ \ �y I / L CONCRETE WASHOUT (TYP) \
G40
v 638 y v�
\ 635 635 /
0 634 635 V 634` > / STABILIZED CONSTRUCTION
ENTRANCE (TYP)
629
s s3S\ \ \ \ \ INV : 62850
GS_
�f M�f � 1 1 • • P \ / \ / INV : 628V-0
/ i60 \ y PB yf4
/ /N 58•40'57• E \ � \ \ J.")
\ s
OD
-
_ / I / / \ FILTER BAG �� �-� •• \ \ \ / � � \ \
FILTER BAG
INLET PROTECTION (TYP)
CONCRETE WASHOUT (TYP)
STABILIZED CONSTRUCTION �6v /
ENTRANCE (TYP)
EROSION CONTROL NOTES - SEC. 17.35(a)(9)
EFFORT SHOULD BE MADE NOT TO UNCOVER MORE THAN
20 ACRES AT ANY ONE TIME. IF MORE THAN 20 ACRES
ARE TO BE UNCOVERED AT ANY ONE TIME, THE PLAN
SHALL CONTAIN THE FOLLOWING:
A. THE METHOD OF LIMITING THE TIME OF EXPOSURE AND
AMOUNT OF EXPOSED AREA TO ACHIEVE THE
OBJECTIVES OF THIS CHAPTER.
B. A CUT/FILL ANALYSIS THAT SHOWS WHERE SOIL WILL
BE MOVED FROM ONE AREA OF THE TRACT TO
ANOTHER AS GROUND ELEVATION IS CHANGED.
C. CONSTRUCTION SEQUENCE AND CONSTRUCTION PHASING
TO JUSTIFY THE TIME AND AMOUNT OF EXPOSURE.
D. TECHNIQUES TO BE USED TO PREVENT SEDIMENTATION
ASSOCIATED WITH LARGER DISTURBED AREAS.
E. ADDITIONAL EROSION CONTROL MEASURES, STRUCTURES,
AND DEVICES TO PREVENT SEDIMENTATION.
EROSION CONTROL LEGEND
DESCRIPTION
PLAN SYMBOL
DESCRIPTION
PLAN SYMBOL
SILT FENCE
SILT FENCE OUTLET
SILT FENCE - HIGH
HAZARD DOUBLE ROW
RIP RAP OUTLET
PROTECTION
TREE PROTECTION FENCE
-❑-❑-❑-❑-❑
ROCK CHECK DAM
CLEARING LIMITS
CL CL
STABILIZED CONSTRUCTION
ENTRANCE
LIMITS OF DISTURBANCE
LOD
BLOCK 81 GRAVEL INLET
PROTECTION
TEMPORARY DIVERSION
SWALE
T D
I
FILTER BAG CATCH BASIN
INLET PROTECTION
TEMPORARY SEEDING
TS
DRAINAGE AREA BOUNDARY
PERMANENT SEEDING
PS
TEMPORARY SLOPE DRAIN
T D
FILTER RING INLET
PROTECTION
L
I �
I
I
y la
GRAPHIC SCALE
0 , / 30 /X160 120
IN FEET )
I inch = 60 ft.
240
o
i
z z Go y i
<0c m
U
OszOL�
=Z
o
o
�cS-
dCC)z z
w cQ
0
NO
O
O
�J c W cn
6
z
E
O
n1
N
w
�
v
a
�
�
o
_
m
Y
U
"'
a
m
�
o
(1)
U)
z
z
O
w
�
0
O
w
U
z
F-
w
(n
w
a
O
a
J
w
w
G:
cn
w
,
0
w
p
Z
3
Q
O
J
c�
m
jzo
L0
CD
L0
Z
L
O
Q
p
O
�o
U
0
CC
00
O
2
�0
1
T
i
U co
�N
Lu U
o
N
0
E
CV Z
o �
O
0
3
U
U)
U
0-
Z
-
J
a
w
z
Z
a
Z
�
o
,
z
0
f
a
w
a
'
0-
Z
Ld
0
J
m
W
W
w
F-
D
Z
Z
o
U
W
o
a
z
U)
Fx
F--
U)W
O
D
w
U
U
a
w
0-
JOB NO:
J-28270 0000
DATE:
7/29/20
DRAWN:
BDH
DESIGNED:
BDH
REVIEWED:
MSK
APPROVED:
MSK
SCALE:
I" = 60'
ECloO..j
J
Z
O
w
N
O
d
a
w
w
0
LL
H
w
H
w
a
- 641
\
I 642
HARDWARE CLOTH & GRAVEL a
INLET PROTECTION (TYP)
I I IIII �
I I /
Ye9 I I / _
I III -
'
'd"-
SILT FENCE (TYP) �
I I I
II I IIII
/
LIMITS OF DISTURBANCE (TYP)
PROPERTY LINE (TYP) I 11 I J / 5/ �° j /////////////
I
•
/
3.
668- -
I I I I \ \ 1 A V \ \ FILTER BAG INLET / I / ///jw
66
PROTECTION (TYP)10
(l
/
\
r Q \
\ F4sFMr \\ \ \ \\ \ I I I \\ \I �a� a
BREAK SILT FENCE 6' WIDE AND
Fp po
Oe 4pfReo
INSTALL SILT FENCE STONE OUTLET
?S0j3
IN LINE WITH SILT FENCE ALONG
a23S<<�
THE OUTFALL (TYP)
\
AI
\
\I I \
_Q�y^ 5 PUTICITyp'
l ll� s { gSE
pGMgqT
1
\ 1
620 -- /
I
iRSM�
es,o,
Q \
/ /
_
s
sWfR fq -
6 zo PGS,yfNT /
EROSION CONTROL CONSTRUCTION SEQUENCE
1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM THE CITY OF CHARLOTTE ENGINEERING
DEPARTMENT.
2. SET UP A ON -SITE PRE -CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR OF THE
CITY ENGINEERING DEPARTMENT TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE
SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF
CHAPTER 17 OF THE CITY CODE AND IS SUBJECT TO FINE.
3. INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT TRAPS, DIVERSION DITCHES, TREE PROTECTION,
AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE
DEVICES.
4. CALL FOR ON -SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING
PERMIT AND CLEARING AND GRUBBING MAY BEGIN.
5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES
AND STRUCTURES.
6. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL
INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES.
7. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE.
8. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL
MEASURE.
9. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C.
EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE,
CITY OF CHARLOTTE EROSION CONTROL ORDINANCE, AND THE CHARLOTTE LAND DEVELOPMENT
STANDARDS MANUAL.
of
e•.
ia.
�i
i
..u..cr,,•
/ r----
ma.`e.�..... , ' r r / ..�'
..... _
... ..'
r /tee.:..+- ......... _
ae..r e..aa vc.� r• � r .
ll -
�o /
I 11p /
I11 0100,0
-• • • -•
i0001,100 id
lllllll ' ' • •
�111 I
I
IIIIII%�
I (POT!
j p� lid
UI1//1
-90
EROSION CONTROL NOTES - TREE SAVE AND PRESERVATION
1. TREE PROTECTION MUST BE INSTALLED AND VERIFIED BY URBAN FORESTRY
PRIOR TO STARTING ANY CONSTRUCTION ACTIVITY.
2. SHOW TREE PROTECTION AND TREES SAVE AREAS ON DEMO, EROSION
CONTROL, GRADING AND LANDSCAPE PLAN SHEETS.
3. COMMERCIAL TREE SAVE AREAS MUST BE RECORDED ON A FINAL PLAT WITH
THE MECKLENBURG COUNTY REGISTER OF DEEDS BEFORE URBAN FORESTRY
HOLDS CAN BE RELEASED. A 10' NO BUILD ZONE AROUND TREE SAVE
AREAS MUST BE REFERENCED ON THE PLAT.
4. TREE SAVE AREAS SHALL BE FREE OF INVASIVE PLANT SPECIES. IF AN
AREA PROPOSED FOR TREE SAVE CONTAINS INVASIVE PLANT SPECIES AT
TIME OF PROPOSAL, SUCH INVASIVE PLANT SPECIES SHALL BE REMOVED
PRIOR TO FINAL CO.
5. THE AREA OF ANY EASEMENTS (WATER, SEWER, UTILITY, ETC.) CAN NOT BE
COUNTED TOWARD THE TREE SAVE REQUIREMENT.
6. ANY ACTIVITY WITHIN TREE SAVE AREAS MUST BE ACCOMPLISHED WITHOUT
MECHANIZED EQUIPMENT.
EROSION CONTROL NOTES - GENERAL NOTES
1. ALL "STD."NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL
2. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING
ADMINISTRATOR.
3.
ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE
CITY COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE.
4.
GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION
\
OF THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE.
5.
ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3
HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION
\
WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS
FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED
TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN
\
ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY.
6.
ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A
\�
REPRESENTATIVE OF THE CITY ENGINEERING DEPARTMENT.
/ a� SSM \
7.
SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE
ADEQUATE TERRACING [CLDSM #30.16].
8.
A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT
/ \
PREVIOUSLY APPROVED.
/
9.
TEMPORARY GROUND COVER MUST BE PROVIDED PER NCDEQ STD. 6.10 & 6.11.
10.
ALL DITCHES MUST BE LINED IMMEDIATELY IF REQUIRED AND STABLIZED PER NCDEQ STD. 6.10 &
6.11.
3°a
11.
SOILS: CeB2. CeD2. MO. PaE. PaF. WkE
/ \
12.
DENUDED LIMITS: 16.10 AC,
\
\I\
'Ire
I
zit
/q1'a�
o
� 4
EXISTING
WETLAND /
<pO
> V L-
\ \ \ boo \ \\ 641::- 4 39 \ ••p \ \ 41 s4o \ - '-'8t I // / CONCRETE WASHOUT (TYP)
638-637- V \ 640-639-
-636�635
V I 634 \ \ 637 636
\ \ \ 6 3-632- 631�\ 634 STABILIZED CONSTRUCTION
\ \-630�629 \ \ / / / / - ENTRANCE (TYP)
v v SKIMMER
SEDIMENT \ \ SKIMMER
FME"tiF �� BASIN 02-A \ F64z \ SEDIMENT
/ s �� �eRz3s II 635 v\ BASIN 02-5
�6
�(D
N
D
\ �\ cz \
I I 1 � / � � /// /�_ =\ \ \�24�"9�r"fro�' � `� S l/• • \ �0
O \0
OR�JjER�W\ /
OD 1 op P. w ojN /
PR p /
m
CONCRETE WASHOUT (TYP) I
�'7 STABILIZED CONSTRUCTION ENTRANCE (TYP)
\\ \\\\\ \\ \\\ 1/II ✓ I \ I ��� \/\ / / / / /
--- - v \ vv
EROSION CONTROL NOTES - SEC. 17.35(a)(9)
EFFORT SHOULD BE MADE NOT TO UNCOVER MORE THAN
20 ACRES AT ANY ONE TIME. IF MORE THAN 20 ACRES
ARE TO BE UNCOVERED AT ANY ONE TIME, THE PLAN
SHALL CONTAIN THE FOLLOWING:
A. THE METHOD OF LIMITING THE TIME OF EXPOSURE AND
AMOUNT OF EXPOSED AREA TO ACHIEVE THE
OBJECTIVES OF THIS CHAPTER.
B. A CUT/FILL ANALYSIS THAT SHOWS WHERE SOIL WILL
BE MOVED FROM ONE AREA OF THE TRACT TO
ANOTHER AS GROUND ELEVATION IS CHANGED.
C. CONSTRUCTION SEQUENCE AND CONSTRUCTION PHASING
TO JUSTIFY THE TIME AND AMOUNT OF EXPOSURE.
D. TECHNIQUES TO BE USED TO PREVENT SEDIMENTATION
ASSOCIATED WITH LARGER DISTURBED AREAS.
E. ADDITIONAL EROSION CONTROL MEASURES, STRUCTURES,
AND DEVICES TO PREVENT SEDIMENTATION.
EROSION CONTROL LEGEND
DESCRIPTION
PLAN SYMBOL
DESCRIPTION
PLAN SYMBOL
SILT FENCE
SILT FENCE OUTLET
SILT FENCE - HIGH
HAZARD DOUBLE ROW
RIP RAP OUTLET
PROTECTION
TREE PROTECTION FENCE
-❑-❑-❑-❑-❑
ROCK CHECK DAM
CLEARING LIMITS
CL CL
STABILIZED CONSTRUCTION
ENTRANCE
LIMITS OF DISTURBANCE
LOD
BLOCK a GRAVEL INLET
PROTECTION
TEMPORARY DIVERSION
SWALE
T D
I
FILTER BAG CATCH BASIN
INLET PROTECTION
TEMPORARY SEEDING
TS
DRAINAGE AREA BOUNDARY
PERMANENT SEEDING
PS
TEMPORARY SLOPE DRAIN
T D
FILTER RING INLET
PROTECTION
NAG S75 SLOPE MATTING
L
I \
\
I
I
l
///-GRAPHIC SCALE
-\ --' 60 ,_ , 0�30 X,.o120
IN FEET )
1 inch = 60 ft.
240
O
zz � y
W 0 E m � ►
<
= Q
U
LLJ 0 a c
O L
-
=Z
Z U o
__- -
o
�cS
dCC)z z
Ld cQ
`````
�o
=
0�3cs
�J 0:) W cn
= U
Z
W 0� . co E
O
_
O
N
N
N
w
v
`r
a
N
o
-�Co
Y
U
O
}
U)
N
H
z
z
o
w
�2
0
O
w
U
w
F-
W
cn
g
z
w
IL
w
D
o
g
CY
w
w
O
cr
>
U
<n
w
O
H
ix
w
o
z
3
a
o
O
J
U
cD
m
a
Z
L0
CD
L0
Z
L
O
Qp
O
Do
U
0
CC
D 00
O
Q N
0
1
i
� N
w U
oZ
�
E
CV
O
O
7-
}
3
U
W
N
.
U
a
a
Z
H
z
W
a
0
Q
�
W
z
O
H
O
_
Z
>
1
a
z
z
o
a
�
W
J
z
O
o
=
U
p
z
o
I-
N
D
U)
Ld
Ii
W
V
U
J
a
Q
W
0
JOB NO:
J-26270 0000
DATE:
7/29/20
DRAWN:
BDH
DESIGNED:
BDH
REVIEWED:
MSK
APPROVED:
MSK
IIISCALE:
I.. = 60'
EC2*0
z
O
0
W
In
O
a
a
w
w
O
LL
H
w
W
a