Loading...
HomeMy WebLinkAboutNCC211718_NOI Application_20210322Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 3/18/2021 9:01:13 AM (NCG01 NOI Submission) Approve by Clark, Paul 3/19/2021 4:51:14 PM (Review- Construction NOI 48072) • The task was assigned to Clark, Paul by round robin distribution 3/18/2021 9:01 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 22, 2021 5:00 PM 3/18/2021 9:01 AM Submit by Selkane, Aziza 3/22/2021 9:12:46 AM (Payment Verification for NCC211718) * Charles A Hickman • Selkane, Aziza assigned the task to Selkane, Aziza 3/22/2021 9:12 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 30, 2021 5:00 PM 3/19/2021 4:51 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * 3D Community Church 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers n/a 1 c. Parcel ID List all Rios associated w ith this project. Number(s) (PIN) 9568-83-2297.000 2. County* Harnett 3. Highway or Street 658 Graham Road Address* Street name only is acceptable if no address number assigned yet 4.CityorTownship* Sanford 5. State * NC 6. Zip Code* 27332 7. Latitude* Enter the latitude in decimal degrees 35.3520 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -79.1066 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 05/03/2021 Estimated Construction Project Start Rate 10. Date to End * 10/04/2021 Estinated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 3.65 disturbed* (including off -site borrow and waste areas) 13. Total site area 14.20 (acres) * 14. Post- 0.74 construction (Estimated) impervious area (acres) * NCC Project NCC-HARNE-2021-3D Community Church Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Dry Creek Waterbody* Narreof waterbody into which storrrwater runoff will discharge 15b. Waterbody 18-20-13-3-5 Index No. * NCWaterbody Index Nunber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * 3D Community Church IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Charles If Corporation, enter Faegistered Agent First Wre 3. Last Name* Hickman IF Corporation, enter F;bgistered Agent Last %rre 3b. Title Pastor 4. Permitee E-mail pastorcharlie@3dcommunitychurch.com Address* 5. Permittee 919-499-3318 Telephone No.* 6. Permittee Mailing Street Address Address* 100 Upchurch Farm Road Address Line 2 City Sanford Fbstal / Zip Code 27332-8442 Check box if the street address the same as mailing address 7. Permittee Street Address* F Yes Street Address 658 Graham Rd Address Line 2 city Sanford Fbstal / Zip Code 27332 State / Frovince / Fbgion NC Country US State / Frovince / Faegion NC Country US 8. Type of Ojvnership is only individual if an individual is naned in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Roject Site Contact Inforrration ....................................................................................................................................................................................................... 1. Primary Site Charles Contact - First Name * 2. Primary Site Hickman Contact - Last Name * 3. Title Pastor 4. Site Contact E- pastorcharlie@3dcommunitychurch.com mail Address* 5. Site Contact 919-499-3318 Telephone No. 6. Organization 3D Community church Name 7. Site Contact Street Address Mailing Address* 100 Upchurch Farm Road Address Line 2 city Sanford Fbstal / Zip Code 27332-8442 8. Consultant Name (Optional) Jarrod Hilliard First and Last narre 9. Consultant E-mail jhilliard@hilliardengineering.com This person will be copied on all correspondence. 10. Consultant 919-352-2834 Telephone No. 11. Billing E-mail (For Annual Fee correspondence) pastorcharlie@3dcommunitychurch.com Default is legally responsible person a-rrail 12. Billing (For Annual Fee correspondence) Telephone 919-499-3318 Default is legally responsible person telephone State / Rovince / Region NC Country US D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 03/16/2021 Approved * 2. E&SC Plan Project HARNE-2021-100 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan 3d Church EC Approval harne-2021-100.pdf 86.6KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Mist be RDFfornat (limit 20 NB) VICINITY MAP - 658 Graham Rd - Google Maps.pdf 961.37KB Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies if necessary. 8. NOI Certification 3D Community Church NOI.pdf 1.64MB Form Must be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* IT The Legally Responsible Person named on this Notice of Intent f Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Charles Hickman Title Pastor Organization Legally Responsible Entity 3D Community Church Date * 03/18/2021 F. Tracking and COC Info NOI Tracking No. 48072 NC Reference No. NCG01-2021-1718 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC211718 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 1718 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC211718-2021 Invoice Due Date 4/18/2021 Initial Fee $ 100.00 Invoice Status OPEN