HomeMy WebLinkAbout20120296 Ver 1_Meeting Minutes_20120906BEVERLY EAVES PERDUE
GOVERNOR
Contract ID:
T.I.P. No.:
W13S No..
F. A. Project No.
Counties:
Description:
sv-
STATE W . OF NORTH CAROLINA
DEPARTNTNT OF TRANSPORTATION
September 6, 2012
C202616
R -2507A
35488.3.1
NIA
Hertford & Gates
EUGENE A. CONTI, JR,
SECRETARY
US 131 US 158 Widening from NC 45 near Winton to the US 158 Bypass in Tarheel
Mr. Chris Martin, Project Manager
E. V. Williams, Inc.
P.O. Box 65128
Virginia Beach, VA 23467 -5128
SUBJECT: Preconstruction Conference Minutes
A preconstruction conference was held at the Division Engineer's Office, Edenton, NC, on Thursday, August 30,
2012.
Attendees and Proiect Personnel:
Mr. Mark Osenbaugh/E. V. Williams
Mr. Chris Martin/E. V. Williams
Mr. Brian Evans /E. V. Williams
Mr. Joe Budt / E. V. Williams
Mr. Dave LePage / E. V. Williams
Mr. James Rountree / E. V. Williams
Mr. Gary Meads / Mclean
Mr. Ashley Ray Christiansen 1 Mclean
Mr. Bryan Badey / RK &K
Mr. John Stewart / RK &K
Mr. Kevin Bisby / RK &K
Mr. David Peterson / RK &K
Mr. Matthew Cook / RK &K
Mr. Michael Merritt / RK &K
Mr. Thomas Roberts / Telics & Time Warner Cable
Mr. Michael Wood / CATENA
Mr. Ivy Kimbrough / CATENA
Mr. Russell Ribblett 1 Fiber Technologies & MCNC
Mr, Jeffrey Williamson / CenturyLink
Mr. Hubert Williamson / CenturyLink
Mr. Mike Kotarba 1 Right of Way Consultants, LLC
Mr. Gary Taylor / AMEC
Mr. Garcy Ward /NCDENR
Mr. David Wainwright / NCDENR
Mr. Bill Biddlecome/ US ACOE
Mr. Paul Williams / NCDENR
Mrs. Michelle Pittman / NCDOT
Mr. Wiley Jones / NCDOT
Mr. Bob Capehart / NCDOT
Mr. S. L. Emory / NCDOT
Mr. Clay Willis / NCDOT
Ms. Carla Pugh I NCDOT
Mr. M. E. Joyner / NCDOT
Mr. Bill Copeland / NCDOT
Mr. Eddie Bunn / NCDOT
Mr. R. J. Kaylor/NCDOT
Mr. M. R. Hill/NCDOT
230 NC 42 West, Ahoskie, NC 27910, Phone (252)332 -4514; Fax(252)332-3040
Mr. Chris Martin
Preconstruction Conference Minutes
9/6/2012
Page 2 of 3
Scott Emory opened the meeting and introductions were made.
Permit and Environmental Issues:
Bill Biddlecome reviewed the Department of the Army Permit (Permit SAW 2006- 101391). E. V. Williams only
has one pit at this time but they are looking for another one. Bill said to make sure the permit plans match the
construction plans. Also, make sure that permit is onsite at all times.
Bill said that it is possible to vary the in water work moratorium for work at the beginning or end of the
moratorium if it will facilitate an earlier completion of the project. Section 10 is included in the permit for utility
work and not for new bridge construction.
Bill said to make sure that SHPO conditions are followed.
The Utility Coordinator is going to review the permit with every utility subcontractor. Clay said that he would
be glad to meet with them.
David Wainwright reviewed the 401 Water Quality Certification (Certification No. 003918).
Paul Williams reviewed DENR Permit Number 92 -12.
Bill and Garcy Ward said that it was okay to install high visibility silt fence 3' to 5' off of the toe of the slope if
the slopes are marked with stakes. Bill said to not allow silt to stay in the area between the toe of slope and the
silt fence for a long period of time.
Scott Emory said that we want ground cover as soon as possible.
This project is under the 21 day soil stabilization rule.
Scott said that the NCDOT plans to have a dedicated erosion control inspector on the project.
Scott welcomed the environmental agency personnel to the monthly construction conference that is held on the
third Wednesday of every month at 11 AM at the Contractor's office trailer.
Utilities
AT &T is getting their contractor now. They will begin work in around 6 weeks. It will take them 4 to 5 months
to complete their work.
Time Warner plans to complete work by the end of the year.
Century Link will be ready to start soon.
MCNC has a deadline to be completed by December, 2012.
There is 25,000 feet of 12" gas main that has to be relocated.
230 NC 42 West, Ahoskie, NC 27910 Phone: (252) 332 -4514 Fax: (252) 332 -3040
Mr. Chris Martin
Preconstruction Conference Minutes
9/6/2012
Page 3 of 4
Right of Way
Mike Kotarba reviewed the right of way issues and passed out a sheet with the status of the properties. The plan
is to have all right of way available for construction by November 1, 2012.
Other Issues:
EV Williams plans to have a safety officer onsite at all times once we are in full swing.
EV Williams has finished clearing the borrow pit and they will begin installing the silt fence tomorrow.
Joe Bordt said that it will take them 3 months to clear the project.
M. E. Joyner said that he recommends installing the safety fence prior to clearing. If you try to install a highly
visible silt fence before clearing starts, the silt fence will be damaged and there will be difficulty toeing it in.
The plan is to start the north bound bridge at Buckhorn Creek in October, 2012.
Wiley Jones wanted to make sure that we get all of documentation including material certifications that is
needed.
This completes the minutes of the Preconstruction Conference for Contract C202616 held on Thursday, August
30, 2012 at the Division Engineer's Office, Edenton, NC. Any discrepancies with the content of these minutes
should be submitted in writing to this office. Failure to do so will be an indication of agreement.
Sincerely,
Scott Emory, P.E.
Resident Engineer
BY:
Michael R. Hill, P.E.
Acting Senior Assistant Resident Engineer
SLE/MRIVmrh
CC: Jerry Jennings, P. E.
Meeting Attendees
Mr. Robert Barrett -PCNG
230 NC 42 West, Ahoskie, NC 27910 Phone: (252) 332 -4514 Fax: (252) 332 -3040
REVISIONS
R/W REVISION NO7AUGUST 30 2012 REVISED PROPOSED DRIVE AND ADDED SECOND PROPOSED DRIVE ON PARCEL 38 ADJUSTED R/W AND ADDED PERMANENT EASEMENT
/2012
Hyd 1 \PERMITS E m t 1 \D g\ 2507A Hyd p t p h18 dg
O 0 0
ti
m
� I
M m
T j MATCHLINE —L— STA 189 +00 SEE SHEET 17
Frl
aoO�
s
�
�I r ( /
I I
N1C�`m
tj
C b <
om 10
Ln
r 2 oZm D D
CZ
�1
i lr I �-_- - � y
R > I�
4i A �
rrl 2 r 2 r� +
p 1 ° a , I Ill llil �OD �
Ln
ROAD
/ R
1
NETS
ti
'R
v
O } -c Lq n I1
O _
L Qn
o`
m
W � I
ti
F
m0 N
uZ0 m �y \O � J mil
z n
O
Z
o�'-' a oo
op
mau Q7 -
00 61 VAS
I
I
r
1 195
f-zaJ
Z
z4� °n
cv o n A
�D oU D
Ol
oom
� r s
�
o
�
n
- -5
m
o
-
°n
n $
x
=
3
f xx
Rg
3 S
-g
T
O
N
S on
O
oc
i
m0
D
�
_
< fl
W I
o�
-
° z ro 200
oN �ti o
5 _
/ n o 1° o
ff r0 �O
, D o
a3 -- aT
0
n y
pZO z
I �
S _�_ 3N11H�
V l p ° ~o z$
Z �x 00 p�
a o
,