Loading...
HomeMy WebLinkAbout20210396 Ver 1_Pre-Filing Meeting Request_20210219ID#* 20210396 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 2/19/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Wyatt I brown brownenvgrp@gmail.com Barbour Farms NDSP, LLC Johnston Street Address 23 RICHMOND DR Address Line 2 aty Clayton Rbstal / Zip Code 27520 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country United States Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below. Barbour Farms will be a single family homesite S/D with approximately 66 lots. Streets and utilities will be provided by the developer. There will be 2 necessary wetland impacts on the project for road crossings. Please give a couple of dates you are available for a meeting. 3/4/2021 Please attach the documentation you would like to have the meeting about. —EMAIL-IMPACT MAPS (2).pdf 1.49MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/19/2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 3334 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 4A 5A 6A 7A 64A 65A 66A 59A PC=15+69.00R=310.00PT=19+02.57PC=21+95.44R=310.00PT = 2 4 + 9 8 . 2 5 PC = 3 3 + 4 2 . 7 0 R= 3 1 0 . 0 0 PT=36+02 . 4 0 PC=12+45.07R=230.00P T = 1 3 + 9 2 . 7 3 PC=14+89.33R=230.00PT=16+31.83PC=17+42.18R=310.00PT= 2 0 + 8 8 . 3 8 PC=21+88.38R=310.00PT=25+95.37PC=25+95.37R=310.00PT=27+25.82PC=32+62.11R=310.00PT=35+21.60STREET "A " (PROPOSED 5 0 ' P U B L I C R O W / 2 0 ' A S P H A L T ) STREET "B" (PROPOSED 50' PUBLIC ROW/ 20' ASPHALT)STREET "D"(PROPOSED 50' PUBLIC ROW/ 20' ASPHALT)STREET "C"(PROPOSED 50' PUBLIC ROW/ 20' ASPHALT)20' P U B L I C D R A I N A G E E A S E M E N T20' PUBLIC DRAINAGE EASEMENT20' P U B L I C D R A I N A G E E A S E M E N T 10' CROSSLOT DRAINAGE EASEMENT10' CROSSLOT DRAINAGE EASEMENT10' CROSSLO T D R A I N A G E E A S E M E N T 10' CROSSLOT DRAINAGE EASEMENT20' PUBLIC DRAINAGE EASEMENT20' PU B LI C DRAIN A G E E A S E M E N T 20' PUBLICDRAINAGE E A S E M E N T RUBERT AVE N U E HENRY COURTUS HWY 70 BUS+/-140' PUBLIC R.O.W.ST-5ST-6ST-7 ST-8 ST- 9 ST-11 ST-2ST-3 ST-2.12 5 0 250 25024924 9 24924924924924924824824 8 248 2482482 4 7 247247247247 247 247247247 246 246 24 6 246246 246 246 24 6 246246246246 246 2 4 6 24 6 246246 246 246 246 246246 24624524 5 245 24 5 245245245245 245 245245 245 24 5 24 5245245 245 245 24524524524524524 5 24 5 245245245 245 245 24 5 245245245 245 245 245 245 245 245 245244244244244244244244244 244 244 244 244244244 244 244244 244244244244244 24 424424 4 24 4 24 4 24 4 24424424424 4 244244244 244 244 244244244244 244244244244244 244244 24424424324324 3 243 243 243 243 243243 24324324324324 3 243 243 243 243 243 24324 3 243 243 243 243 243 243 243 243 243 243 243 243 243 243243243243 24 3 243243243 24324 3 242242 242 24 2 242 242242 242242242 242 242 242 242 242242 242 242 242 242 242242242242242 24 2 242 242 242 242 242 242 242 2 4 2 241 241 241241241 241241 241 241 241241241241241 24 1 241 241 241 241 241240240 240 240240240 240 240 240 240 24024 0240 240 24 0 240 2 4 0239 239 239 239239239 239 239 239 239239239 239 23 9 239 23 9238238 238 238 238238238238 238 238 238238 238 238 238238238 23 8 238 238237237 237 23 7 237 237 237237237237237 237 237237237 237237237 237237 23 7 237 23623623623623 6 2 3 6 236236236236236 236 236236236 236 236236236 236236236 236 23 6 236 23 6 236 236235235235235235 2 3 5 235235235235235235 235 23523523523523523523523 5235235 235 235 235 23423423 4 23 4 234 234 2 3 4 2 3 4 234 23423423423423423423423 4234234234 234234234234 234 234 23 4 233 2 3 3 233 233233 233233233 233233233233233 233 2 3 3233233 233232232232 232232232232232232232232232232 231 231231 231231231 231231231230230230229229 2 2 92282 2 8 2 2 7 226 225 NAD83 ADAMS & HODGEENGINEERING, PCSHEET 1 OF 10 OVERALL MAPBARBOUR FARMSJOHNSTON COUNTY, NORTH CAROLINA1 inch = 300 ft.0150300600GRAPHING SCALE314 EAST MAIN STREETCLAYTON, NC 27520info@adamsandhodge.com919-243-1332FIRM # C-4187NON-BUFFERED STREAM WETLANDS WETLANDS WETLANDS PROPOSED WETLAND IMPACT 2 PROPOSED WETLAND IMPACT 1 VICINITY MAP NTS WETLAND IMPACT SUMMARY PERMANENT IMPACT TEMPORARY CONSTRUCTION IMPACT IMPACT 1 0.146 AC 0.057AC IMPACT 2 0.035 AC 0.019 AC EXISTING TREE LINE (TYP.)P:\BARBOUR FARM\01-CARLSON_CAD_DWG\IMPACT MAPS.dwg, 2/16/2021 3:33:32 PM, rwells 3 4 7 18 10+ 0 0 11+ 0 0 12+ 0 0 PC=21+88.38R=310.0022+0023+0024+0020' PUBLIC DRAINAGE EASEMENTS T - 2 ST-3ST-2.1LODLODLODLODLO D LO D LO D LO D LO DLODLODLODLODLODLOD LODLODLODLODLODLODLODLODLODLOD LOD LOD LODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LO D LO D LO D LO D LO D LO 23 6 23623623623 5235 23523523 5235234 23423423 4234 234233232NAD83 ADAMS & HODGEENGINEERING, PCSHEET 2 OF 10 WETLAND IMPACT 1BARBOUR FARMSJOHNSTON COUNTY, NORTH CAROLINA1 inch = 40 ft.0204080GRAPHING SCALE314 EAST MAIN STREETCLAYTON, NC 27520info@adamsandhodge.com919-243-1332FIRM # C-4187WETLANDS ~1.68 ACRES WETLAND IMPACT TEMPORARY CONSTRUCTION IMPACT WETLAND IMPACT 1 PERMANENT IMPACT TEMPORARY CONSTRUCTION IMPACT WETLAND 0.146 AC 0.057AC IMPACT 1 SEQUENCE OF CONSTRUCTION 1. OBTAIN 401 & 404 PERMITS. 2. OBTAIN JOHNSTON COUNTY PUBLIC UTILITIES EROSION CONTROL APPROVAL. THIS PROJECT IS DIVIDED INTO TWO (2) STAGES. STAGE 1 - CLEARING & INSTALLING EROSION CONTROL MEASURES. STAGE 2 - INSTALLING STORM DRAIN AND GRADING THE SITE. BEGIN STAGE 1 3. INSTALL EROSION CONTROL MEASURES. ONLY CLEAR ENOUGH TO INSTALL THESE MEASURES. BEGIN STAGE 2 4. INSTALL STORM DRAIN. 5. INSTALL EROSION CONTROL MEASUERS SPECIFIC TO STORM DRAIN. I.E. ARC INLET PROTECTION, INLET PROTECTION, ETC. 6. BEGIN GRADING SITE. SILT FENCE (TYP.) SILT FENCE OUTLET (TYP.) DOUBLE BARREL 36" RCP WITH HEADWALLS SKIMMER BASIN (TYP.) CHECK DAM W/ STORAGE (TYP.)ARC INLET PROTECTION (TYP.)P:\BARBOUR FARM\01-CARLSON_CAD_DWG\IMPACT MAPS.dwg, 2/16/2021 3:33:35 PM, rwells 62 63 66 37+0038+0039+0040+0040ST-11LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODODLODLODLODD LO D LODLODL O D L O D L O D LOD L O D L O D L O D LODLODL O D L O D L O2302302292302292302 3 1 230 2 3 2 2 3 1 2302 3 2 2 3 1 230 2292 3 1 2 3 0 2292 2 3 3 2 3 3 2 3 2 2 3 2 2 3 2 2 3 2 2 3 2 2 3 2 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 0 2 3 0 229229 2 2 8 NAD83 ADAMS & HODGEENGINEERING, PCSHEET 3 OF 10 WETLAND IMPACT 2BARBOUR FARMSJOHNSTON COUNTY, NORTH CAROLINA1 inch = 40 ft.0204080GRAPHING SCALE314 EAST MAIN STREETCLAYTON, NC 27520info@adamsandhodge.com919-243-1332FIRM # C-4187WETLAND IMPACT TEMPORARY CONSTRUCTION IMPACT WETLAND IMPACT 2 PERMANENT IMPACT TEMPORARY CONSTRUCTION IMPACT WETLAND 0.035 AC 0.019 AC WETLANDS ~0.69 ACRES SILT FENCE (TYP.) SILT FENCE OUTLET (TYP.) DOUBLE BARREL 36" RCP WITH HEADWALLS SKIMMER BASIN (TYP.) CHECK DAM (TYP.) ARC INLET PROTECTION (TYP.) IMPACT 2 SEQUENCE OF CONSTRUCTION 1. OBTAIN 401 & 404 PERMITS. 2. OBTAIN JOHNSTON COUNTY PUBLIC UTILITIES EROSION CONTROL APPROVAL. THIS PROJECT IS DIVIDED INTO TWO (2) STAGES. STAGE 1 - CLEARING & INSTALLING EROSION CONTROL MEASURES. STAGE 2 - INSTALLING STORM DRAIN AND GRADING THE SITE. BEGIN STAGE 1 3. INSTALL EROSION CONTROL MEASURES. ONLY CLEAR ENOUGH TO INSTALL THESE MEASURES. BEGIN STAGE 2 4. INSTALL STORM DRAIN. 5. INSTALL EROSION CONTROL MEASUERS SPECIFIC TO STORM DRAIN. I.E. ARC INLET PROTECTION, INLET PROTECTION, ETC. 6. BEGIN GRADING SITE.P:\BARBOUR FARM\01-CARLSON_CAD_DWG\IMPACT MAPS.dwg, 2/16/2021 3:33:40 PM, rwells ADAMS & HODGEENGINEERING, PCSHEET 4 OF 10 EROSION DETAILSBARBOUR FARMSJOHNSTON COUNTY, NORTH CAROLINANOT TO SCALEGRAPHING SCALE314 EAST MAIN STREETCLAYTON, NC 27520info@adamsandhodge.com919-243-1332FIRM # C-4187TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER TEMPORARY SEEDING RECOMMENDATIONS FOR FALL GOODWIN CHASE EAST PHASE 3P:\BARBOUR FARM\01-CARLSON_CAD_DWG\IMPACT MAPS.dwg, 2/16/2021 3:33:45 PM, rwells ADAMS & HODGEENGINEERING, PCSHEET 5 OF 10 EROSION DETAILSBARBOUR FARMSJOHNSTON COUNTY, NORTH CAROLINANOT TO SCALEGRAPHING SCALE314 EAST MAIN STREETCLAYTON, NC 27520info@adamsandhodge.com919-243-1332FIRM # C-4187MAINTENANCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERTY STABILIZED. STEEL POST WIRE FENCE PLASTIC OR WIRE TIES NATURAL GROUND FILTER FABRIC STEEL POST FILTER FABRIC WIRE FENCE BACKFILL TRENCH AND COMPACT THOROUGHLY MAINTENANCE INSPECT WIRE AND WASHED STONE OUTLETS AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME (APPROX 50% OUTLET COVERAGE) FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE OUTLET DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. BURY WIRE FENCE, FILTER FABRIC, AND HARDWARE CLOTH IN TRENCH FRONT VIEW SILT FENCE BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH FILTER OF #57 WASHED STONE 18" MIN. AT FACE OF HARDWARE CLOTH HARDWARE CLOTH STEEL FENCE POST 3' FILTER FABRIC ON GROUND MAINTENANCE INSPECT WIRE AND WASHED STONE INLETS AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME (APPROX 50% OUTLET COVERAGE) FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE INLET DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERTY STABILIZED.P:\BARBOUR FARM\01-CARLSON_CAD_DWG\IMPACT MAPS.dwg, 2/16/2021 3:33:50 PM, rwells ADAMS & HODGEENGINEERING, PCSHEET 6 OF 10 EROSION DETAILSBARBOUR FARMSJOHNSTON COUNTY, NORTH CAROLINANOT TO SCALEGRAPHING SCALE314 EAST MAIN STREETCLAYTON, NC 27520info@adamsandhodge.com919-243-1332FIRM # C-4187MAINTENANCE INSPECT BAFFLES AT LEAST ONE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT.P:\BARBOUR FARM\01-CARLSON_CAD_DWG\IMPACT MAPS.dwg, 2/16/2021 3:33:55 PM, rwells 1 2 3 4 5 6 7 18 19 4A 5A 6A 7A 10+0011+0012+0013+00PT=13+92.7314+0 0 PC=14+89.33R=230.0015+ 0 0 1 6 + 0 0 PT=16+31.831 7 + 0 0 PC=17+42.18R=310.001 8 + 0 0 19+ 0 0 20+00 PT=20+88.3821+00 PC=21+88.38R=310.0022+00 23+00 24 + 0 0 PT=2 520' PUBLI C D RAI NA GE EASE ME NT N/F KEITH, TIMOTHY H NCPIN 168600-04-4001 TAG 17I06041C DB 02734 PG 0659 ZONING AR ZONING AR ST-2ST- 3ST-2. 1 NAD83 ADAMS & HODGEENGINEERING, PCSHEET 7 OF 10 LOTS 4-7 LAYOUTBARBOUR FARMSJOHNSTON COUNTY, NORTH CAROLINA1 inch = 100 ft.050100200GRAPHING SCALE314 EAST MAIN STREETCLAYTON, NC 27520info@adamsandhodge.com919-243-1332FIRM # C-4187ALL WETLANDS WILL BE SHOWN ON FINAL RECORDED MAP. THE CORPS OF ENGINEERS MUST BE CONTACTED BEFORE ANY WETLAND IS IMPACTED. NO WETLANDS WILL BE IMPACTED BY SEPTIC ON ANY LOTS. POTENTIAL 12' DRIVEWAY LOCATION (TYP.) POTENTIAL HOME LOCATION (TYP.) STREET ' A 'P:\BARBOUR FARM\01-CARLSON_CAD_DWG\IMPACT MAPS.dwg, 2/16/2021 3:34:00 PM, rwells 8 9 10 11 25+00T=25+95.37PC=25+95.37R=310.00 26+00 27+00P T = 2 7 + 2 5 . 8 2 28+0029+00NAD83 ADAMS & HODGEENGINEERING, PCSHEET 8 OF 10 LOT 8 LAYOUTBARBOUR FARMSJOHNSTON COUNTY, NORTH CAROLINA1 inch = 60 ft.03060120GRAPHING SCALE314 EAST MAIN STREETCLAYTON, NC 27520info@adamsandhodge.com919-243-1332FIRM # C-4187ALL WETLANDS WILL BE SHOWN ON FINAL RECORDED MAP. THE CORPS OF ENGINEERS MUST BE CONTACTED BEFORE ANY WETLAND IS IMPACTED. NO WETLANDS WILL BE IMPACTED BY SEPTIC ON ANY LOTS. POTENTIAL 12' DRIVEWAY LOCATION (TYP.) POTENTIAL HOME LOCATION (TYP.)STREET 'A'P:\BARBOUR FARM\01-CARLSON_CAD_DWG\IMPACT MAPS.dwg, 2/16/2021 3:34:05 PM, rwells 42 43 16+0 0 17+00 18+00 20' PU B LI C DRAIN A G E E A S E M E N T NAD83 ADAMS & HODGEENGINEERING, PCSHEET 9 OF 10 LOT 8 LAYOUTBARBOUR FARMSJOHNSTON COUNTY, NORTH CAROLINA1 inch = 60 ft.03060120GRAPHING SCALE314 EAST MAIN STREETCLAYTON, NC 27520info@adamsandhodge.com919-243-1332FIRM # C-4187ALL WETLANDS WILL BE SHOWN ON FINAL RECORDED MAP. THE CORPS OF ENGINEERS MUST BE CONTACTED BEFORE ANY WETLAND IS IMPACTED. NO WETLANDS WILL BE IMPACTED BY SEPTIC ON ANY LOTS. POTENTIAL 12' DRIVEWAY LOCATION (TYP.) POTENTIAL HOME LOCATION (TYP.) STREET ' B 'P:\BARBOUR FARM\01-CARLSON_CAD_DWG\IMPACT MAPS.dwg, 2/16/2021 3:34:10 PM, rwells 59 60 61 62 6364 65 66 64A 65A 66A 59APC=33+42.70 R 3 1 0 0 0 34+0035+0036+00PT=36+02.4037+0038+0039+0040+0040+60.26HENRY COURT N/F LAWSON, MICHAEL NCPIN 168600-15-3889 TAG 17J07035G DB 05098 PG 0561 ZONING ARN/F WRIGHT, CAREY WRIGHT, LARQUIVNA NCPIN 168600-15-0853 TAG 17J07035K DB 04982 PG 0345 ZONING AR N/F WILLIAMS, HAROLD W. LIFE ESTATE WILLIAMS, PECOLIA ELAINE LIFE ESTATE NCPIN 168600-16-3700 TAG 17J07037A DB 05262 PG 0509 ZONING AR ST-11NAD83 ADAMS & HODGEENGINEERING, PCSHEET 10 OF 10 LOTS 4-7 LAYOUTBARBOUR FARMSJOHNSTON COUNTY, NORTH CAROLINA1 inch = 100 ft.050100200GRAPHING SCALE314 EAST MAIN STREETCLAYTON, NC 27520info@adamsandhodge.com919-243-1332FIRM # C-4187NON-BUFFERED STREAM ALL WETLANDS WILL BE SHOWN ON FINAL RECORDED MAP. THE CORPS OF ENGINEERS MUST BE CONTACTED BEFORE ANY WETLAND IS IMPACTED. NO WETLANDS WILL BE IMPACTED BY SEPTIC ON ANY LOTS. 20' PUBLIC DRAINAGE EASEMENT POTENTIAL 12' DRIVEWAY LOCATION (TYP.) POTENTIAL HOME LOCATION (TYP.) S T R E E T ' B ' 20' PUBLIC DRAINAGE EASEMENT POTENTIAL PRESSURE SEPTIC LINE AT STREAM CROSSING; x HOME BUILDER SHALL NOT DISTURB WITHIN 2' OF THE TOP OF BANK OF THE STREAM x SHALL BORE PERPENDICULAR AND 2' UNDER STREAM TO AVOID ANY DISTURBANCE TO VEGETATION OR STREAM BED P:\BARBOUR FARM\01-CARLSON_CAD_DWG\IMPACT MAPS.dwg, 2/16/2021 3:34:15 PM, rwells