HomeMy WebLinkAbout20190225 Ver 2_Pre-Filing Meeting Request_20210217DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20190225
Version*
2
Raleigh Regional Office - (919) 791-4200
Stephanie Goss
Pre -Filing Meeting Request submitted 2/17/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
James Mason
james.mason@threeoaksengineering.com
Middle Creek Greenway
Town of Apex
Wake
Owner Address: Street Address
73 Hunter Street
Address Line 2
P.O. Box 250
City State / Rovince / Region
Apex NC
Fbstal / Zip Code Country
27502 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
17 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below.*
Phase I of the Town of Apex's Middle Creek Greenway - Miramonte to
Holly Springs Connector Project is comprised of the greenway
connection that runs between the northern right-of-way boundary of
future NC Highway 540 (also southern property boundary of the
Reunion Pointe subdivision) to the southern right-of-way of Sunset
Lake Road/ the Town of Holly Springs border at Sunset Lake Road. A
portion of the greenway within the 1-540 right-of-way has been
permitted by and will be constructed by NCDOT; the remainder of the
greenway will be constructed by the Town.
Please give a couple of dates you are available for a meeting.
2/24/2021
3/3/2021
3/10/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 2/17/2021