HomeMy WebLinkAbout20210390 Ver 1_Pre-Filing Meeting Request_20210217DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210390
Version *
1
Asheville Regional Office - (828) 296-4500
Amy Annino
Pre -Filing Meeting Request submitted 2/17/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Charles Taylor
charles@chetola.com
Chamberlain Boat Dock
Rex Chamberlain
Caldwell
Street Address
6734 Waterfront Drive
Address Line 2
aty State / Rovince / Region
Hickory NC
Fbstal / Zip Code Country
28601 United States
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
r Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Amy Annino
Please give a brief project description below.*
The home owner at the above address has requested the area under
his floating boat dock have the accumulated sediment removed. Over
time sediment has built up to the point that the water under the dock
is not deep enough to accommodate his boat and lift. The total
affected area of the project is approximately 30' X 30'. We will be
sloping the walls of the dredge area at a 2:1 to comply with
requirements communicated by Duke Energy. The primary area of
focus will be roughly 18' X 18'. We anticipate removing roughly 90
cubic yards of material.
The material will be removed with the Dino6 hydraulic dredging
system. This is a single step dredging process. Material will only be
handled once. The dredge head is lowered to the lake bottom where
it loosens and sediment and pumps it into filtration bags located on
the shore. The filtration bag is to be placed in a dewatering area
prepared on the owners property. The dewatering area is
constructed of a reinforced masonry retaining wall system and will be
lined with an additional layer of silt fence. The area is equipped with
multiple 6" drainage lines to carry the filtered water back to the lake.
Once dry the filtration bag will be cut away and the contents leveled
an seeded within the existing dewatering area.
We anticipate the entire project to take one week but have allowed
for two weeks to allow for inclement weather.
Please give a couple of dates you are available for a meeting.
2/22/2021
2/23/2021
2/24/2021
2/25/2021
2/26/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
T
Submittal Date 2/17/2021