HomeMy WebLinkAbout20210587 Ver 1_Meeting Request Review Doc Attachment_20210318LAT LONG PIPE STA STATUS CURRENT SIZE EXISTING LENGTH LENGTH TO REPLACE (LFT)LIVE WATER EXTENSION LENGTH (LFT)NOTES
01+02 Failing - Replace 18"CMP 50 No Replace with 18" HDPE
35.939978°-82.742829°18+86 Failing- Replace 18"CMP 35 40 Yes Add 5 Replace with 24" HDPE
35.940132°-82.742892°19+81 Failing - Replace 24"CMP 30 40 YES Add 10 Recommend replace with 30" HDPE
23+10 Deteriorating - Line 18"CMP 40 No Wash out & line
32+10 Good 18"CMP
33+70 Good 18"HDPE
39+00 Deteriorating - Line 18"CMP 40 No Wash out & line
42+75 Good 30"HDPE
35.946647°-82.744233°47+87 Failing - Replace 24"CMP 35 40 Yes Add 5 Replace with 24" HDPE
49+95 Failing - Replace 18"CMP 40 No Replace with 18" HDPE
35.947560°-82.744327°50+86 Failing - Replace 18" CMP 35 40 Yes Add 5 Replace with 24" HDPE
35.948221°-82.744935°53+86 Functioning but under sized 2-30"CMP 35 50 Yes Add 15
Hydro recommended replacing with 2-54" w/HW, buried one
foot
55+55 Deteriorating - Line 18"CMP 40 No Wash out & line
35.948939°-82.746116°59+26 Failing - Replace 30"CMP 35 40 Yes Add 5
Hydro recommended replacing with 54" w/HW, buried one
foot
35.949654°-82.747314°64-20 Failing - Replace 18"CMP 30 40 YES Add 10 Replace with 24" HDPE
72+69 Good 18"HDPE No
74+68 No Pipe- Needs pipe 50 No Install 18"HDPE
77+63 Failing - Replace 18"CMP 30 35 No Add 5 Replace with 18" HDPE
79+50 No Pipe- Needs pipe 35 No Need 35 Install 24"HDPE
92+87 Good 18"HDPE Yes
94+37 Good LARGE ARCH PIPE Yes
NC 208 CROSSPIPES
96+50 Good 18"CMP Yes
35.957692°-82.751111°103+80 Replace Small Rock Culvert 35 35 Yes No extension Replace with 18" HDPE
111+96 Deteriorating - Line 18"CMP 40 No Wash out & line
115+68 Good 18"CMP No
120+30 Good 24"CMP Yes
127+21 Good 18"HDPE No
134+80 Good 18"HDPE No
35.965838°-82.753706°140+66 Failing - Replace 24"CMP 35 40 Yes Add 5 Hydro recommended replacing with 30"
35.966222°-82.753394°142+37 Failing - Replace 24"CMP 25 40 Yes Add 15 Replace with 24" HDPE
154+75 Good 3 - Barrel Box Culvert Yes
162+32 Good 24" HDPE Yes
174+80 Failing - Replace 18"CMP 40 No Replace with 18" HDPE
186+50 Good Box Culvert Yes
35.978384°-82.756754°193+00 No Pipe - Needs pipe 40 Yes Add 40 feet Install 18"HDPE
196+50 Good Box Culvert Yes
205+80 Good 60" HDPE Yes Replaced in 2019
212+79 Good 18"HDPE Yes
218+02 Good 18"CMP No Needs washed out
35.983995°-82.763788°226+52 Deteriorating - Line 18"CMP 35 37 Yes Need 37' of liner Wash out & line
35.984418°-82.764412°229+28 Failing - Replace 30"CMP 30 35 Yes Add 5 Replace with 36" HDPE
35.986003°-82.766060°236+94 Failing - Replace 18"CMP 30 40 Yes Add 10 Hydro recommended replacing with 2-24"
239+12 Deteriorating - Line 18"CMP 40 No Wash out & line
244+22 Good 60"CMP Yes
251+63 Good 24"HDPE No
257+88 Failing - Replace 18"CMP 40 No Replace with 18"HDPE
261+00 No Pipe - Recommend pipe 40 No Install 18"HDPE
264+00 No Pipe - Recommend pipe 40 No Install 18"HDPE
267+00 No Pipe - Recommend pipe 40 No Install 18"HDPE
270+00 No Pipe - Recommend pipe 40 No Install 18"HDPE
272+50 No Pipe - Recommend pipe 40 No Install 18"HDPE
275+08 Failing - Replace 18"CMP 40 No Replace with 18"HDPE
35.987555°-82.778207°277+15 Failing - Replace 18"CMP 35 40 Yes Add 5 Replace with 18"HDPE
284+32 Good - But inlet damaged 24"CMP 35 5 Yes No extension Replace 5LFT of CMP on inlet side
288+69 Good 24"HDPE Yes
NO CROSS PIPES BETWEEN STA 257+88 and 275+08 - RECOMMEND PLACING CROSS PIPES APPROX. EVERY 300 LFT
Please note: If money will permit, it would be great to have the contractor clean ditches and inlet and out areas of pipes up to 50 foot from the pipe being installed/replaced.