HomeMy WebLinkAbout20210345 Ver 1_Pre-Filing Meeting Information_20210319DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
20210345 1
Winston-Salem Regional Office - (336) 776-9800
Dave Wanucha
Pre-Filing Me eting Reque st submitte d 2/15/2021
Jeff Hemphill
jhemphill@ncdot.gov
B-4626
NCDOT
Rowan
City
Raleigh
State / Province / Region
NC
Postal / Zip Code
27699-1598
Country
US
Street Address
1598 Mail Service Center
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
The North Carolina Department of Transportation (NCDOT) proposes
to replace the superstructure on bridge 0003 and apply deck
preservation treatment to Bridge 0008 on NC 8/NC 49 over the
Yadkin River (Tuckertown Reservoir) in Davidson, Rowan and Stanly
Counties with the same span arrangement on the existing alignment.
This action will result in 18 feet of permanent impacts to the Yadkin
River from bank stabilization and 0.05 ac of temporary impacts from
causeways for bridge construction/rehabilitation. No stream mitigation
will be required for this project.
2/17/2021
2/22/2021
2/24/2021
B-4626 Final Permit Drawings.pdf 11.05MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
2/15/2021