Loading...
HomeMy WebLinkAbout20210345 Ver 1_Pre-Filing Meeting Information_20210319DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* 20210345 1 Winston-Salem Regional Office - (336) 776-9800 Dave Wanucha Pre-Filing Me eting Reque st submitte d 2/15/2021 Jeff Hemphill jhemphill@ncdot.gov B-4626 NCDOT Rowan City Raleigh State / Province / Region NC Postal / Zip Code 27699-1598 Country US Street Address 1598 Mail Service Center Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date The North Carolina Department of Transportation (NCDOT) proposes to replace the superstructure on bridge 0003 and apply deck preservation treatment to Bridge 0008 on NC 8/NC 49 over the Yadkin River (Tuckertown Reservoir) in Davidson, Rowan and Stanly Counties with the same span arrangement on the existing alignment. This action will result in 18 feet of permanent impacts to the Yadkin River from bank stabilization and 0.05 ac of temporary impacts from causeways for bridge construction/rehabilitation. No stream mitigation will be required for this project. 2/17/2021 2/22/2021 2/24/2021 B-4626 Final Permit Drawings.pdf 11.05MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 2/15/2021