Loading...
HomeMy WebLinkAbout20060761 Ver 2_Staff Comments_20120911Lucas, Annette From: Lucas, Annette Sent: Tuesday, September 11, 2012 9:23 AM To: Witherspoon, Lauren Cc: Lucas, Annette Subject: 06- 0761v2 Oaks of Sippahaw, Phase 4 — SW CONDITION Attachments: 06- 0761v2 Oaks of Sippahaw, Phase 4 — SW CONDITION.docx LC, I am so late with this condition, sorry about that. Can you please approve it when you get a chance? I am going to tell Jennifer Burdette that it will be approved. Thanks, AL Annette M. Lucas, PE Environmental Engineer NCDENR I DWQ I Wetlands and Stormwater Branch 1650 Mail Service Center, Raleigh, NC 27699 -1650 (Mail) 512 N. Salisbury St, Raleigh, NC 27604 1 9f Floor (Location & Parcels) Phone: (919) 807 -6381 1 Fax: (919) 807 -6494 1 Email: Annette. Lucas6c.)ncdenr.gov Website: http: / /Portal.ncdenr.org /web /wg /swl2/ws /401 `,A Before printing this email, please consider your budget and the environment. E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 06 -0761 v2 Oaks of Sippahaw, Phase 4 — SW CONDITION AML comments September 11, 2012 1. The DWQ approves the Stormwater Management Plan (SMP) with the following stipulations: a. The SMP approved by the DWQ consists of one Stormwater Wetland and one Level Spreader- Vegetated Filter Strip as well as all associated stormwater conveyances, inlet and outlet strictures, and the grading and drainage patterns depicted on the approved plan sheets (except for the modification in Item 1 above). The plans and specifications for the Oaks of Sippahaw Subdivision are incorporated by reference this approval and are enforceable by the DWQ provided however that any modification of the design for the stormwater management system that is accepted by the DWQ shall take precedence over the original plans and specifications. b. The footprint of all stormwater management devices as well as an additional ten (10) foot wide area on all sides of the devices shall be located in either public rights -of -way, dedicated common areas or recorded easement areas. The final plats for the project showing all such rights -of -way, common areas and easement areas shall be in accordance with the approved plans. c. Maintenance activities for the BMPs shall be performed in accordance with the notarized O &M agreements signed by Mr. Horace Tart (Owner) on June 7, 2012. The O &M agreement must transfer with the sale of the land or transfer of ownership /responsibility for the BMP facility. The DWQ must be notified promptly of every transfer. d. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the DWQ within thirty (30) days of project completion (available at http://portal.ncdenr.org/web/wq/swi)/ws/40 I/certsandpermits/apply/forms).