HomeMy WebLinkAboutWM0501429_Final Permit_20210319 March 19, 2021 Kirk Farrelly Capital Growth Buchalter, Inc. 361 Sumit Boulevard, Suite 110 Birmingham, AL 35243 Subject: Monitoring Well Construction Permit # WM0501429 12321 NC Hwy 210 Johnston County Mr. Farrelly: In accordance with the application received on March 8, 2021, we are forwarding herewith Monitoring Well Construction Permit No. WM0501429 dated March 19, 2021, issued for the construction of a monitor well system (installation of two temporary monitoring wells) at the subject property. Please be aware that some counties have well construction programs, and you may be required to obtain a well construction permit before installation. This Permit will be effective from the date of its issuance and shall be subject to the conditions and limitations as specified therein. Please note the addition of stipulation #3 to the permit enclosed. If you have questions regarding this Permit, please feel free to contact Brion Byers at (919) 791-4237, or by email at brion.byers@ncdenr.gov. Sincerely, Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ cc: Laserfiche Files Johnston County, Health Department Kirk Farrelly, Capital Growth Buchalter, Inc., kfarrelly@cgpre.com Jenna Dew, ECS, Jdew@ecslimited.com DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO Capital Growth Buchalter, Inc. FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM (12321 NC Hwy 210) consisting of a monitoring well system (two (2) temporary monitoring well) owned by Capital Growth Buchalter at mailing address 361 Summit Boulevard, Suite 110, Birmingham, AL 35243. Two temporary monitoring wells will be installed on property owned by G H Land, LLC, located at 12321 NC Hwy 210 Benson, NC 27504 (PIN 163400-02-6460). This Permit is issued in accordance with the application received on March 8, 2021, which is filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as part of an investigation for contamination from an underground storage tank or dry cleaner incident. 2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o). 5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resource’s Information Processing Unit within 30 days of the well completion. 6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resource’s Information Processing Unit within 30 days of the well abandonment. 7. If the well penetrates any water-bearing zone that contains contaminated waters, the upper three feet of the well shall be grouted within one day after the casing is set or the well abandoned. 8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168 hours) of the completion of drilling of the borehole. Permit issued the 19th of March, 2021 FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ____________________ Scott Vinson, Regional Supervisor Division of Water Resources By Authority of the Environmental Management Commission Permit No. WM0501429