Loading...
HomeMy WebLinkAbout20120779 Ver 1_Stormwater Info_20120907ENVIRONMENTAL SERVICES, INC. 524 S. NEW HOPE ROAD RALEIGH. NORTH CAROLINA 27610 919 - 212 -1760 • FAX 919 - 212 -1707 www.enviromnentalservicesinc.com September 5, 2012 Ms. Annette Lucas, P.E. N.C. Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 -1650 Re: DWQ #2012 -0779; 55 James at Midtown Apex, NC Ms. Lucas: ° @EAR o SEP - 7 2012 DENR - WATER dUVITY ESI is submitting the enclosed diffuse flow plan for the project, 55 James at Midtown, on behalf of the applicant JVI Construction. The project engineer is Mr. Peter Cnossen, P.E. of Jones & Cnossen Engineering, PLLC. Lauren Witherspoon has informed me that she has reviewed the remaining portions of the Section 401 application and that this diffuse flow plan was the last item required. Please let us know if you have any questions or comments. Sincerely, Environmental Services, Inc. eff Harbour, PWS Senior Manager Enclosure: Diffuse flow plan and worksheets Cc: Peter Cnossen, P.E. FLORIDA • GEORGIA • NORTH CAROLINA • SOUTH CAROLINA • MARYLAND • OHIO A HWEHR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out printed, initiated, and submitted Project name Contact name Phone number Date Drainage area number The purpose of the LS-VFS Stormwater enters LS-vFS from Type at VFS Explanation of any 'Other' responses above N Stormwater Enters the LS-VFS from the Drainage Area Drainage area impervious surface area Percent Impervious Rational C coefficient Peak flow from the 1 irubr storm Time of concentration Rainfall intensity, 10-yr Storm Peak flow from the 10-yr storm Design storm Maximum amount of flow directed to the LS-VFS Is a low bypass system going to be used? Explanation of arty 'Other- responses above I Stormwater Enters the LS•VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak disdtarge from the BMP during the 10-year storm Maximum capacity of a 100 -foot long LS-VFS Peak flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any 'Other responses above waTFq O -12 Do not complete this section of the form. fe Do not complete this section of the form. % Do not complete this section of the form. Do not complete this section of the form. Cis Do not complete this section of the form min Do not complete this section of the form. inrnr section he Do not complete this W Of t form. ds Do not complete this section of the form. 07 Kl- cis Do not complete this section of the form. (Y or Do complete this sectlD th N) not n of e form. "M, "A s 'E R ?;cis v X i, 1 A cis -%4 2 cis 7755 7 77777, cis (Y or N) Form SW401 - LS-VFS - 29June2012 - Rev. 10 page 1 of 3 LS-VFS Design Forebay surface area Depth of frebay at stormwater entry point Depth of forebay at stomnxathr exit pant Feet of level lip needed per cis Computed minimum length of the level rip needed Length of level lip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from I" rip to the end of the VFS) Are any draws print In the VFS? Is More a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flax spffing device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak veto* in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any 'Other" responses above M sq ft No faebay is required. Depth is awopnata. 50* fticfs 5 ft Ten feet Is the minimum level spreader length. kV:ft {_ M "It B i ' ,4429:40 , Wd %'c Y X4213 20 ; ':• frisl 240 % E ;(Y 0r N) y� z, ; ;:'(YorN) ETA Form SW401- LS-VFS - Mune2012 - Rev. 10 page 2 of 3 {_ M B i Form SW401- LS-VFS - Mune2012 - Rev. 10 page 2 of 3 EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requded Item: 1. Plans (I'- 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (d applicable), - Defsleated drainage basins (include Rational C coefficient per basin), - Forebay (If applicable). - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement 2. Plan details (1' = 30' or larger) for the level spreader showing: - Forebay (If applicable), High flow bypass system, - One foot topo lines between the level tip and top of stream bank - Proposed drainage easemerd, and Design at ultimate build -out 3. Section view of the level spreader (1'= 20' or larger) showing: - Underdrain system (r7 applicable), - Level tip, - Upslope channel, and - Downslope filter fabric. 4. Plan details of the low splitting device and supporting calculations (f applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area Is stabif¢ed. 6. If a non-engineered VFS Is being used, then provide a photograph of the VFS showing that no draws are present 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement Form SW401 - LS-VFS - Mune2012 - Rev.10 page 3 of 3 W� - - ------- ~ \ ! \ E N-50, v EMERGENCY \ \ \ \ / / \' / / \\ \ . �, '• TO \ SPILLWAY \ \� / / ! / 432\ • \• 094 F( \ R11-`RAP \ �`v 0� N� /81RCp FOREBAY \ / i it \V_ LEVEL SPREADER v / CB# 2 �y �\ I //p Q / / '/ / / 15" FES 6' L Q \/ 3 1 A O 0� I /' / / , INV. = 429.4 / M h \ \ \ ~ °® \-s / •� / BMP MAINTENANCE - / i / \ `� .,,.. ",�•'r / // AND ACCESS EASEMENT if` ol- r , TRASH RACK 4' WIDE TOP OF DAM = 43G.5 COIR POROUS 100 -YEAR FLOOD ELEV. EMERGENCY SPILLWAY BAFFLES (3) = 435.G7 ELEV. = 435.G7 WATER QUALITY STORAGE A PRIMARY SPILLWAY ELEV. TOP OF RISER = 435.57 - = 435.57 ?� VEGETATIVE 2" DIAM. POND SHELF (TYP) DAM NORMAL POOL ELEV. = 434.1 DRAIN PIPE SPILLWAY - W N FOREBAY R VALVE -'"' 24'1 CONTRACTOR TO WRENCH W! RI5EP INSTALL 2 -112" \ BRACKET SKIMMER FOR TEMP. SEDIMENT CONTROL C�tn V _ r. ' . Tom-- G" DRAIN W! VALVE \ NOTES: 1. RI5EK SHALL BE 24" x 24" (INTERIOR) PRECAST STRUCTURE. 2. POND BOTTOM ELEVATION 15 427 AND BOTTOM OF SEDIMENT AREA 15 42G. 3. POND WILL HAVE MINIMUM G" CLAY LINER 21, 5" BARREL 1' SEDIMENT ACCUMULATION F OF THESE CONSTRUCTION PLAN5. AREA 12" s. F Cid 4'x4x2' DATE 4'x4'x 1' DEEP PUBLIC WORKS - ENV. PROGRAMS CONC. CONC, z ANTI -SEEP FOOTING DATE COLLAR DETAIL - FOND 2 N.T.5. CM - BUILDING INSPECTIONS DATE NOTES: I . ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF APEX STANDARDS AND SPECIFICATIONS. 2. BOUNDARY AND TOPOGRAPHIC INFORMATION TAKEN FROM SURVEY PROVIDED BY SMITH *SMITH SURVEY COMPANY. 3. CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (I - 800 -G32 -4949) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 4. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL DEVICES IN THE BEST LOCATION BASED UPON FIELD CONDITIONS. G. THE RIP -RAP APRON ON THE FOREBAY DAM SHOULD BE 5" LOWER THAN THE REST OF THE FOREBAY DAM. MINIMUM DEPTH= 12" INV. = 429.3 RIP -RAP D50 =G" kQ �l BOTTOM WIDTH = 5' GEOTEXTILE LINER RIP -RAP APRON EMERGENCY SPILLWAY DETAIL N.T.5. TOP OF DAM MIN STRUCTURAL BMP CONSTRUCTION SEQUENCE: THE FOLLOWING MUST OCCUR PRIOR TO FINAL PLAT AND /OR CERTIFICATE OF OCCUPANCY (CO): I . ALL STRUCTURAL BMP5 MUST BE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS. 2. THE DESIGN ENGINEER MUST SUBMIT AN AS -BUILT PACKAGE WHICH MEETS ALL REQUIREMENTS PRESENTED IN THE TOWN SPEC BOOK INCLUDING A SIGNED AND SEALED CERTIFICATION STATEMENT, 3. SUBMIT THE APPROPRIATE SIGNED STRUCTURAL BMP Q *M AGREEMENT AND NIIAINTENANCE GUARANTEE TO THE DEVELOPMENT PROJECTS COORDINATOR IN CONSTRUCTION MANAGEMENT AT 249 -3394. 4. A FINAL INSPECTION BY THE ENVIRONMENTAL PROGRAMS MANAGER SHALL BE CONDUCTED ONCE THE A5 -BUILT SUBMITTAL HAS BEEN RECEIVED. ONCE APPROVED, THE ENVIRONMENTAL PROGRAMS MANAGER WILL SEND A BMP APPROVAL LETTER TO THE OWNER. 5. IN LIEU OF STRUCTURAL BMP COMPLETION AND FINAL APPROVAL BY THE ENVIRONMENTAL PROGRAMS MANAGER, THE TOWN MAY ACCEPT A PERFORMANCE GUARANTEE IN ACCORDANCE WITH U'DO SECTION G. 1. 12(G). IF THE CONTRIBUTING DRAINAGE AREA FOR THE BMP5 IS UNSTABLE AT THE TIME OF 1 INAL PLAT APPROVAL FOR A SUBDIVISION, THE TOWN WILL ALLOW A SKIMMER SYSTEM TO BE CONNECTED TO THE EMERGENCY DRAIN 512ED TO DE -WATER THE VOLUME OF THE BASIN OVER A 2 -3 DAY PERIOD. POROUS BAFFLES SHALL EITHER CONTINUE TO BE MAINTAINED (IF CONVERTING FROM A SEDIMENT BASIN) OR BE INSTALLED. ANY ORIFICES MUST BE CAPPED OR PLUGGED. 6. ALL STRUCTURAL BMP5 ARE REQUIRED TO BE COMPLETED PRIOR TO A FINAL GO FOR A SITE PLAN AND 155UANCE OF 90% OF C05 WITHIN A SUBDIVISION. IF THE SUBDIVISION IS TO BE PHASED, ALL STRUCTURAL BMP5 SHALL BE COMPLETED PRIOR TO ISSUANCE OF 90% OF COS WITHIN THAT PHASE. 7. IF A STRUCTURAL BMP COUNTS TOWARDS RCA, THE REQUIRED LANDSCAPING SHALL BE INSTALLED DURING THE APPROPRIATE GROWING SEASON AND COORDINATED WITH THE TOWN ZONING COMPLIANCE OFFICER AT 249 -342G. TOWN REQUIRED SUBDIVISION NOTES: I . NO SITE DEVELOPMENT ACTIVITY INCLUDING BUT NOT LIMITED TO TESTING CLEARING, INSTALLATION OF 5 *E MEASURES, OR GRADING, SHALL OCCUR UNTIL REQUIRED PROTECTION FENCING HAS BEEN INSTALLED AND INSPECTED. A PROTECTION FENCING INSTALLATION PERMIT MAY BE OBTAINED AT THE PLANNING DEPARTMENT OR BY CALLING 9 13 249 -3426. 2. PROTECTION FENCING MUST BE PLACED AWAY FROM ANY SAVED TREE ONE FOOT FOR EACH INCH OF TREE CALIPER. PROTECTION FENCING MUST BE PLACED AT LEAST 10 FEET AWAY FROM ANY OTHER DESIGNATED RESOURCE CONSERVATION AREA, SUCH AS BUT NOT LIMITED TO HISTORIC BUILDINGS AND STRUCTURES, WETLANDS, AND PONDS. PROTECTION FENCING MUST BE PLACED ALONG THE OUTSIDE LINE OF THE 100 -YEAR PLOODPLAIN, AND THE OUTSIDE EDGE OF AN.0( RIPARIAN BUFFER. ADDITIONAL PROTECTION FENCING MAY BE REQUIRED IN OTHER LOCATIONS CLOSE TO CONSTRUCTION ACTIVITY WHERE IT IS DEEMED NECESSARY BY THE ZONING ENFORCEMENT OFFICER; SUCH AREAS MAY INCLUDE BUT ARE NOT LIMITED TO COMMON PROPERTY LII'E5 OR NEAR PUBLIC AREAS (SIDEWALKS, ETC.). 3. ALL GRADING AND SUPPORT STRUCTURES A550CIATED WITH ANY RETAINING STRUCTURE SHALL NOT ENCROACH INTO ANY REQUIRED BUFFER OR PROTECTED AREA (SUCH AS BUT NOT LIMITED TO, RCA AND CRITICAL ROOT ZONES OF TREES, PUBLIC UTILITY EASEMENTS AND RIGHTS -OF -WAY), AND SHALL BE CONTAINED ENTIRELY ON SITE. 4, SITE ELEMENTS REQUIRED TO SATISFY RECREATIONAL REQUIREMENTS SUCH AS BUT NOT LIMITED TO PLAY FIELDS AND GREENWAY TRAILS AND ITEMS TYPICALLY ASSOCIATED WITH THEM (BENCHES, TRASH CONTAINERS, SIGNS, ETC.) MUST MEET ANY APPLICABLE STANDARDS FOUND IN THE TOWN OF APEX STANDARD SPECIFICATIONS AND CONSTRUCTION DETAILS AND THE REQUIR5MENT5 OF THE TOWN OF APEX PARKS AND RECREATION DEPARTMENT. 5. RETAINING SYSTEMS PROVIDING A CUMULATIVE VERTICAL RELIEF GREATER THAN FIVE FEET IN HEIGHT WITHIN A HORIZONTAL D15TANCE OF 50 FEET OR LESS, INCLUDING RETAINING WALLS OR MECHANICALLY STABILIZED EARTH WALLS SHALL BE DESIGNED AND CONSTRUCTED UNDER THE RESPONSIBLE CHARGE OF A REGISTERED PROFESSIONAL ENGINEER AND CON4PLY IN ALL ASPECTS WITH THE NC BUILDING CODE SECTION I G 10. RETAINING SYSTEMS MEETING TH15 CRITERIA WILL REQUIRE A SEPARATE BUILDING PERMIT PRIOR TO START OF WORK. Figure 8-3: Profile V,lew Of a LS --1v'F5 -vith aigineesed Filter Strip Iffioin Winston and Hi'mt 2,0 10), 6 ft t ft 3 ft 30 or 5a ft - Level .Spreader NOTES: 1. FABRICATE TRASH RACK BY WELDING #4 REBAR SPACED 8" ON CENTER 2. BOLT BOTTOM OF TRASH RACK TO TOP OF 24 "1 R15ER 24" D ETA I L- T INAS h I` AC K Underdra (opliona Appropriately Sized Footer Vegetative Filter Strip Stolle Figure 8-8: Schematic of a Forebay for Use with a Le-vel Spreader {Hathaway, and Hxuit 2006) S ' d 2011 THE SIGNATURES AFFIXED BELOW CERTIFY THAT THIS SHEET HAS BEEN REVIEWED AND APPROVED 50LELY PER THE CERTIFICATIONS SIGNED ON THE COVER SHEET OF THESE CONSTRUCTION PLAN5. 7�JJJp 0 z Cid Lim W DATE CM - ENGINEERING DATE PUBLIC WORKS - ENV. PROGRAMS 0 z DATE CM - TRANSPORTATION DATE PLANNING z O DATE CM - BUILDING INSPECTIONS DATE PLANNING - TRANSPORTATION 111 DATE PUBLIC WORKS - WATER/SEWER DATE FIRE zLLJ oQ DATE PUBLIC WORKS - ELECTRIC DATE PARKS, RECREATION * CULTURAL RES. W � PUBLIC WORKS - 5 * E DATE 0 10 20 40 GRAPHIC 5CALE Wad *7 V • C It 5 7�JJJp 0 z Cid Lim W Gi E Wad *7 V Q) C It 5 7�JJJp 0 z Cid Lim W Gi E W Z m C 0 z Q O z O W _ 111 C ry U r ' C N C C LU mu 221 N. SALEM ST. SUITE 001 PO BOX 1062 APEx, NC 27502 Office: 919 -387 -1174 Registration: P-0151 www.jormwmosm.com DATE AUGUST G, 2012 0 V i 0 z 0 z Q �o �o _ ry � Q zLLJ oQ � W � Ln 0 un u DATE AUGUST G, 2012