Loading...
HomeMy WebLinkAbout20050674 Ver 2_More Info Letter_20061003~~~ W ATF9Q Michael F. Easley, Governor `O L William G. Ross Jr., Secretary t~'.- North Carolina Department of Environment and Natural Resources -1 p ~ Alan W. Klimek, P.E. Director Division of Water Quality October 3, 2006 DWQ Project # OS-0674, Ver. 2 Johnston County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Inland Builders, LLC 125 Townsend Drive Clayton, NC 27527 Subject Property: Brandon Drive Building Little Creek [030402, 24-33-12, C, NSW] 303d REQUEST FOR MORE INFORMATION Dear Sir or Madam: On March 29, 2006, the Division of Water Quality (DWQ) received your application dated March 29, 2006, to impact 0.47 acres of isolated wetland to develop the site. On Apri16, 2006, the DWQ sent you correspondence requesting additional information. To date, we have not received the requested information. Your agent, Sean Hein of Blackburn Engineering, has requested a meeting with the DWQ and the U.S. Army Corps of Engineers, however, in conversation with personnel with the U.S. Army Corps of Engineers in their Raleigh Field Office, it seems that some sections of your Pre-Construction Notification (PCN) application may not be accurate. Specifically, there appears to be some project history that has not been accounted for in Section V. Prior Project History of your submitted PCN application. Please carefully review the past project history for this site and resubmit your revised application on the attached March 2005 version of the PCN application. Additionally, please provide the information requested below. The DWQ will require this additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the information requested above as well as the following information requested below, so that we may continue to review your project. It is the opinion of this Office that we will need the requested information prior to scheduling a meeting with you to discuss the project. Additional Information Requested: You have applied for a NW39 (GC3402), but stated that the impacts are to isolated wetlands. We cannot be certain based upon your site maps whether these wetlands are truly isolated. It appears that a stream runs near the property. Please clarify whether these wetlands are isolated or 404 jurisdictional, and which permit you are requesting. Additionally, please provide the signed Jurisdictional Determination for this site. 2. This project will require a stormwater management plan. Per GC3402, since your proposed imperviousness will be greater than 30 percent and since the site is located in Nutrient Sensitive Waters (NSW), you must utilize a constructed wetland or bio-retention pond followed by a 401 OversightlExpress Review Permitting Unit N°ne Carolina 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 olltlfCU~~If 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone (919) 733-1786 / Fax (919) 733-6893 Internet: http://www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Inland Builders, LLC Page 2 of 2 October 3, 2006 forested filter strip and a diffuse flow stormwater BMP device such as a level spreader. Please provide said plan, or at the very least, a preliminary plan with calculations demonstrating that an adequately sized facility can be accommodated based upon your site configuration. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact me in writing and Eric Kulz of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733- 1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sinc ly, Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBKlijm U Enclosures: March 2005 Pre-Construction Notification (PCN) application cc: Eric Kulz, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Sean P. Hein, Blackburn Consulting Engineering, 234 East Main Street, Clayton, NC 27520 Filename: 050674 Ver2Bra ndonDriveBldg(Johnston)On_Hold2