Loading...
HomeMy WebLinkAbout20091120 Ver 1_Inspection_20120828Wetland Inspection Report Project Num: 20091120 Version: 1 Project Name: City of Winston - Salem- Extension of Motor road County: Forsyth Location: City of Winston - Salem- Extension of Motor road Latitude: +36 °05'40" SW Plan Location: Site Owner Name: City of Winston -Salem Inspection Date: 08/28/2012 Reason for Inspection: Routine Inspection Type: Site Inspection (non -DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Amy C Euliss Secondary Inspector(s): Facility compliance Status: E Compliant Program Area: 401 (includes isolated /non -404) Question Areas: 0 Permit (401 WQC) Inspection Summary: Title: Status: Issued Project Type: Road maintenance /repair /improvements Region: Winston -Salem Longitude: -80 °07'53" n Not Compliant Phone: Phone: Page: 1 Project Num: 20091120 Inspection Date: 08/28/2012 Owner: City of Winston -Salem Inspection Type: Site Inspection (non -DOT) Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Reason for Visit: Routine Comment: Site 1 and 2 culverts are in. The alignment on site 2 (intermittent stream) is poor, but bank is heavily armored and there's a sewer line in the way. Due to the low flow and weak intermittent status, I'm okay with leaving the aligment as it is. At site 1, the culvert was complete. Requested they bench up the inlet to taper the stream into the culvert. Diversion channel didn't have silt fence protection, but they were set to put water into the culvert that day. V­ ni„ nin niG ■DDD ■nnn D ■ D D Page: 2