HomeMy WebLinkAbout20091120 Ver 1_Inspection_20120828Wetland Inspection Report
Project Num: 20091120 Version: 1
Project Name: City of Winston - Salem- Extension of Motor road
County: Forsyth
Location: City of Winston - Salem- Extension of Motor road
Latitude: +36 °05'40"
SW Plan Location:
Site Owner Name: City of Winston -Salem
Inspection Date: 08/28/2012
Reason for Inspection: Routine
Inspection Type: Site Inspection (non -DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Amy C Euliss
Secondary Inspector(s):
Facility compliance Status: E Compliant
Program Area: 401 (includes isolated /non -404)
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
Title:
Status: Issued
Project Type: Road maintenance /repair /improvements
Region: Winston -Salem
Longitude: -80 °07'53"
n Not Compliant
Phone:
Phone:
Page: 1
Project Num: 20091120
Inspection Date: 08/28/2012
Owner: City of Winston -Salem
Inspection Type: Site Inspection (non -DOT)
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Reason for Visit: Routine
Comment: Site 1 and 2 culverts are in. The alignment on site 2 (intermittent stream) is
poor, but bank is heavily armored and there's a sewer line in the way. Due to the low
flow and weak intermittent status, I'm okay with leaving the aligment as it is. At site 1,
the culvert was complete. Requested they bench up the inlet to taper the stream into
the culvert. Diversion channel didn't have silt fence protection, but they were set to put
water into the culvert that day.
V ni„ nin niG
■DDD
■nnn
D ■ D D
Page: 2