Loading...
HomeMy WebLinkAbout20210519 Ver 1_Pre-Filing Acknowledgement Email_20210318 Strickland, Bev From: laserfiche@ncdenr.gov Sent: Thursday, March 18, 2021 10:00 AM To: Doliber, Brian C Cc: Ward, Garcy Subject: Pre-Filing Meeting Request Acknowledgement - Southdock Dock & Dolphin Installation - 20210519 Ver 1 Attachments: DWR Pre-Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre-Filing Meeting Request Form for Southdock Dock & Dolphin Installation that you submitted on (date). The ID number for that project is 20210519, Version 1. Reviewer Contact Information: Reviewer: Garcy Ward Reviewer Email: garcy.ward@ncdenr.gov Reviewing Office: Washington Regional Office - (252) 946-6481 When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. sq.STAFk'a'.. DWR Pre-Filing Meeting Request Form �. NORTH CAROLINA Bnreronmenrof Quoflry ID#* 20210519 Version* 1 Regional Office* Washington Regional Office-(252)946-6481 Reviewer List* Garcy Ward Pre-Filing Meeting Request submitted 3/4/2021 Contact Name* Brian Doliber Contact Email Address* bcdoliber@ncdot.gov Project Name* Southdock Dock&Dolphin Installation Project Owner* NC DOT Ferry Division Project County* Hyde Owner Address: Street Address 159 Lucinda Lane Address Line 2 Oty State/Bovine/Region Powells Point NC Fbstal/Zip Code Country 27966 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: fJ 401 Water Quality Certification- E 401 Water Quality Certification- Regular Express I` Individual Permit r- Modification Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Garcy Ward Please give a brief project description below.* The North Carolina Department of Transportation (NCDOT) Ferry Division is requesting authorization for the construction of a dock and dolphin at the Southdock Ferry Terminal The US ACE is in need of a spot to tie up their dredge while on the Ocracoke side of Hatteras Inlet, and the Ferry Division has the ability to provide such a location with the installation of one dolphin and one 50'x 8'dock.The dock would begin above the bulkhead, approximately 75'to northeast of the north ferry ramp and 5'north of the northernmost dolphins. It would extend 50'into the water, running parallel to the existing dolphins.The dock would be 8'wide and would be supported by 8 new treated timber piles.The location of the piles is depicted in the attached drawings which display their positioning on each end of the dock,as well as their positioning 17'from each end. The installation of this dock would allow the US ACE to offload their dredge safely and as intended, rather than having to offload from the bow. Dock construction would not involve running any utility lines. The installation of one dolphin is also needed so that the US ACE can properly tie down their vessel.The dolphin would be constructed by driving one steel tube and then driving timber piles around it.The dolphin would be wrapped and secured with steel cable. It would be located at the coordinates 35.190197,-75.780200 which would place it approximately 44'to the northwest of the outermost existing dolphin, while remaining parallel with the other dolphins. Please give a couple of dates you are available for a meeting. 3/8/2021 3/10/2021 3/12/2021 3/15/2021 Please attach the documentation you would like to have the meeting about. ACE Dolphins&Dock Location Map.pdf 1.58MB South Dock Proposed Dock_Plan Aerial.pdf 20.09KB Southdock Dock Profile.pdf 126.57KB pdf only By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 3/4/2021