Loading...
HomeMy WebLinkAboutNOV-2012-PC-0296 Ver 1_Notice of Violation_20120828A=4J* � NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Charles Wakild, P. E. Director August 28, 2012 CERTIFIED MAIL #70110110 0000 9947 7265 RETURN RECEIPT REQUESTED Mr. David N. Daughtry 811 Shelley Drive Goldsboro, NC 27534 Subject: NOTICE OF VIOLATION NOV- 2012 -PC -0296 David N. Daughtry Failure to Secure 401 WQC Wayne County Dear Mr. Daughtry: Dee Freeman Secretary On August 21, 2012, Roberto Scheller of the Division of Water Quality, Washington Regional Office, conducted a site visit to the Daughtry property located at 108 Cassendale Drive, Goldsboro, NC. Present on the site was Mr. William Wescott of the US Army Corp of Engineers. The property boarders Reedy Branch which is a tributary to the Neuse River. During the site visit staff observed unauthorized fill placed in wetlands creating a low profile impoundment of Reedy Branch. No permits have been issued to you for these impacts. As a result of the site inspection and file review, the following violations, detailed below, are noted: (1) Wetland Standard Violation (2) Failure to Secure a 401 WQC Item L Wetland Standard Violation The filling of wetlands represents violations of 15A NCAC 02B .0231 (b) (1) Liquids, fill or other solids or dissolved gases may not be present in amounts which may cause adverse impacts on existing wetland uses;(5) Hydrological conditions necessary to support the biological and physical characteristics naturally present in wetlands shall be protected to prevent adverse 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919 - 807 -63001 FAX: 919 - 807 -6492 Internet: www ricwaterquality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturally Mr. David N. Daughtry August 28, 2012 Page 2 of 2 impacts on: (C) The chemical, nutrient and dissolved oxygen regime of the wetland;(D) The movement of aquatic fauna;(F) Water levels or elevations. Item II. Failure to Secure a 401 WQC The file review confirmed that no Pre - construction Notifications were received by the DWQ requesting to place fill within the wetlands on the subject properties. A Pre - Construction Notification submitted to DWQ is required prior to the above - mentioned impacts pursuant to 15A NCAC 2H.0500. Requested Response This Office requires that the constructed impoundment be breached at the two outside stream locations, as shown by arrows on the enclosed map, and in the middle of the structure. This will restore flow within the wetlands and stream system. This Office anticipates that storm waters will remove the remaining structure over time. It is requests that you respond to this letter in writing within 30 calendar days of receipt of this Notice and indicate measures taken or planed to be taken to restore stream and wetland flow. Thank you for your attention to this matter. Your above - mentioned response to this correspondence will be considered in the violation process. This office requires that the violations, as detailed above, be abated immediately. Please be advised, these violations and any future violations are subject to a civil penalty assessment of up to $25,000.00 per day for each violation. Should you have any questions regarding these matters, please contact either Roberto Scheller (252) 948 -3940 or myself at (252) 946 -3844. Sin erely, Al Hodge, Regional Supervisor Surface Water Protection Section Washington Regional Office Enclosed: Site Aerial Map cc: John Hennessey — NPS Assistance and Compliance Oversight Unit William Wescott, U.S. Army Corps of Engineers, Washington Office WaRO Files EZI T M ^ ` m V a, ~� ui co L f� _ E a # yy f4 4 It s a mo a C cn ol u; !.'t ' O � r - s i, •..4 z m