Loading...
HomeMy WebLinkAbout20030909 Ver 6_Monitoring Plans_20110817o �7 y �( yarns STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR August 17 2011 Mr Andy Williams Raleigh Regulatory Office ACOE Heritage Trade Drive Suite 105 Wake Forest NC 27587 EUGENE A CONTI 7R SECRETARY Re UT to Hickory Creek (Sites #7 #17 and #28) & UT No 9 to Bull Run (Site #1) Stream Mitigation Sites Guilford County WBS Project # 34820 1 1, TIP Nos U 2524AB & U 2524AC, Action ID No 200321137 DWQ Project No 030909 Mr Williams As you are aware the Department has monitored the UT to Hickory Creek (Sites #7, #17 and 928) stream relocations since their construction in February 2006 and UT No 9 to Bull Run (Site #1) since its construction in March 2005 The stream relocation sites are located in Guilford County adjacent to the US 73 Greensboro Western Loop Sites #7 and #17 are located at Sta 11 +60 —40SB REV (Site #7) and Sta 11 +00 40SB REV (Site #17) and provide 952 linear feet of stream relocation for impacts associated with the U 2524AB project Site #28 is located at Sta 29 +00 —40SB REV and provides 935 linear feet of stream relocation for impacts associated with the U 2524AB project UT No 9 to Bull Run (Site #1) is located at Sta 57 +80 Lt —L and provides 198 linear feet of stream relocation for impacts associated with the U- 2524AC project The stream relocations were constructed and revegetated with appropriate hardwood species Per permit requirements NCDOT was required to monitor the stream mitigation sites for channel stability by visual observation on a biannual basis for five years or until success criteria were met During the monitoring period biannual monitoring reports were submitted to the appropriate regulatory agencies via the PDEA Natural Environment Unit s (NEU) website htty / /www ncdot oriz/ doh /vreconstruct/ne / neu/Moni tot ing/MonitormgRev01 is html MAILING ADDRESS TELEPHONE 919 707 6000 LOCATION NC DEPARTMENT OF TRANSPORTATION FAX 919 212 5785 CENTURY CENTER BUILDING B PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1020 BIRCH RIDGE DRIVE 1598 MAIL SERVICE CENTER WEBsiTE WWW NCDOT ORG RALEIGH NC 27610 RALEIGH NC 27699 1598 After five years of vegetation and stream stability monitoring the UT to Hickory Creek (Sites #7 #17 and 928) and UT No 9 to Bull Run (Site 91) stream relocations indicate that the planted vegetation is surviving and the streambanks remain stable at this time Individual biannual monitoring reports are available on NEU s website for 2006 2010 A site visit was conducted to all sites on August 2nd 2011 with the regulatory agencies and NCDOT personnel present It was determined at that meeting that the site success criteria had been met and that no further monitoring would be required NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required and that these sites are closed If you have any questions about this project please contact Mr Randy Griffin at (919) 707 6121 Sincerely Philip S Harris III P E Unit Head PDEA Natural Environment Unit cc Ms Amy Euliss DWQ Mr Travis Wilson WRC Mr Chris Milrtscher EPA Mr Gary Jordan USFWS Mr Scott McLendon ACOE Mr Brian Wrenn DWQ Mr David Harris P E NCDOT REU Mr Jerry Parker NCDOT DEO7 Mr Randy Griffin NCDOT NEU