Loading...
HomeMy WebLinkAbout820217_Structure Evaluation Inspection_20210120Structure Evaluation Inspection Facility Number: -- Time in: Y/L3 Time out: Date: / Farm Name: P7-14,ciii ,,,,/v)// Farm 911 address: Owner Name: /14- Phone Facility Contact: _ Onsite Representative: - -e-e integrator: Certified Operator: Cert. Number Is storage capacity less than adequate? Yes No ----- If yes is waste level into the structural freeboard? Yes Was non -compliant level reported to DWR Structure: Identifier: Spillway? Designed Freeboard (in.): Observed Freeboard (in.): No 2 3 POA received 4 5 Are there any immediate threats to the integrity of any of the structures observed? Yes No Do any structures lack adequate markers as required by the permit? Yes No Does any part of the waste management system need repair Yes No Condition of field's Condition of receiving crop Comments: tu) =,-(3