HomeMy WebLinkAbout820691_POA_20190828PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-691 County: Sampson Facility Name: Ronald Peterson & Sons 5-10 Certified Operator Name: Ronald Peterson Operator Number: 20266 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 5-10 Spillway(Y or N): N Level(inches): 16 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ronald Peterson Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: Date: II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: 5-10 n. lines + 2 + 3 + 4 + 5 + 6 = line m = 679.1 Ib PAN line m = lb PAN line m = Ib PAN line m = lb PAN Tine m = Ib PAN line m= lb PAN 679.1 Ib PAN TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres `s. remaining IRR- 2 PAN balance (Ib/acre) I. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 6033 1 CB 1.38 249.31 344.0 MAR-SEP 6033 5 CB 3.64 130.40 474.7 MAR-SEP 6033 12 CB 4.63 197.50 914.4 MAR-SEP 6033 10 CB 4.74 191.40 907.2 MAR-SEP 6033 6 CB 3.42 158.10 540.7 MAR-SEP v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) _ 3181.1 Ib. PAN 679.1 Ib. PAN 3181.1 Ib. PAN -2502 lb. PAN 30 DAY DRAW DOWN PERIOD I, TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 5-10 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = top of dike surface area according to design d. (area at below structural freeboard elevation) e. line c112 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 4410 certified herd # 16.0 19.0 inches inches 3.0 inches 139392 ft2 260663 gallons 180 145389 4410 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I 8/20/2019 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 145389 ft3 0 81312 ft3 ft3 282621 gallons 1.25 679 lbs. PAN