HomeMy WebLinkAbout20110713 Ver 1_Inspection_20120830�l -cj-7�3
!r 1 4C_
WDENR l I
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild P E Dee Freeman
Governor Director Secretary
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
August 30 2012
Subject Stormwater Inspection
TIP No B 4851
Bridge No 31
NCSR 1308 Double Island Road
Yancey County
Dear Mr Swain
On August 27 2012 I inspected the construction work on TIP Project No B 4851 on NCSR 1308 (Double
Island Road) in Yancey County The inspection included a review of the construction compliance with the
401 Water Quality Certification and Stormwater Permit
Please ensure that all sediment and erosion control structures are mamtamed and seeding and mulching are
performed as required to protect State surface waters Also please refer to the attached inspection report for
any specific items noted during the inspection
If you have questions please call me at 828 296 4500
Sincerely
Michael R Parker
Environmental Senior Specialist
Attachment
cc Garry Moore P E
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
B 4851 NCSR 1308 August 2012 Stormwater Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296 -45001 FAX 828 299 7043 One
Internet www ncwaterouality org NorthCarolina
An Equal Opportunity Affirmative Action Employer ;Vaturallry
Wetland Inspection Report
Project Num
20110713 Version 1
Project Name
NCDOT Bridge No 31 on SR 1308 (B -4851)
County
Yancey
Location
NCDOT Bridge No 31 on SR 1308 (6-4851)
Latitude
+36 0014
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 08/27/2012
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person Title
On Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Status Issued
Project Type Replace bridge with bridge
Region Asheville
Longitude 851401
Facility compliance Status E Compliant n Not Compliant
Program Area Construction SW (NCG010000)
Question Areas
E NCG010000 Permit
Inspection Summary
Work on the bridge is approximately 95 /o complete
All sediment and erosion control structures appear to be working properly
All records and reports are being maintained in a good and orderly manner
Seed and mulch all bare areas as soon as possible
Phone
Phone 828 296 4500
Page 1
Project Num 20110713 Owner NC DOT PDEA
Inspection Date 08/27/2012 Inspection Type Site Inspection (DOT) Reason for Visit Routine
NCG010000 Permit
# Is this inspection related to a DLR/delegated program inspection?
If Yes what was the DLR/delegated program inspection date?
Is the site following its E &SC Plan as per DLR or delegated program?
Is the site maintaining their E &SC measures as per DLR or delegated program?
Is a copy of the approved E &SC plan on site?
Is a rain gauge present on site or is MPE in use for the site?
Is rain gauge data or MPE data recorded?
Are inspection records complete?
Is the site compliant with other conditions of the NCG010000 permit?
Comment Records appear to be maintained In a good orderly manner
Yes No NA NE
■nnn
■ n n n
■ n n n
■nnn
■nnn
■nnn
■nnn
nnnn
Page 2