Loading...
HomeMy WebLinkAboutNC0024538_Authorization to Construct_20160422NPDES DOCUMENT SCANNING. COVER :SHEET NPDES Permit: NC0024538 Shelby / First Broad River WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Inspection Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: April 22, 2016 This document is printed on reuse paper - ignore arty content on the reIrerse side FYZ hdrinc.com April 22, 2016 Mr. Ron Berry Complex Permitting Unit DENR/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 RE: City of Shelby FBR WWTP Upgrades Project HDR Project 233904 I HDR File: C-104 Authorization to Construct No. 024538A02 Subject: Engineer's Certification Dear Mr. Berry: RECEIVEDINCDEQ/DWR APR 25 2016 Water Quality Permitting Section I'm pleased to submit the Engineer's Certification on behalf of the City of Shelby for the First Broad River Wastewater Treatment Plant Upgrades Project. Please contact us at (704) 338-6796 if you have any questions. Sincerely, HDR Engineering, Inc. of the Carolinas Will Shull Project Engineer cc: David Hux, City of Shelby Brad Green, City of Shelby Mary Knosby, HDR Christopher Crotwell, HDR Angie Hudson, HDR 440 S Church Street, Suite 1000, Charlotte, NC 28202-2075 704.338.6700 C =3 q--0502- 0 City of Shelby First Broad River WWTP Authorization to Construct No. 024538A02 Issued,February 26, 2014 C S PY24Jrc r. : C s 3"bz—v Engineer's Certification Will Shull , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe kperiodicallylweekly/fill time) the construction of the modifications and improvements to the First Broad River Wastewater Treatment Plant, located in Cleveland County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of one (1) new inclined rotating drum screen system with piping and controls; installation of one (1) new aeration basin distribution box with piping and controls; installation of one (1) new (third) 0.75 MG aeration basin partitioned with 0.125 MG anoxic and 0.625 MG aerobic zones and consisting of three (3) submersible mixers, fine bubble diffuser system, one (1) 4,167 GPM maximum variable speed internal recycle pump, piping and other controls; installation of three (3) new 3,550 SCFM blowers with piping and controls; installation of one (1) new (third) non -potable 225 GPM pump with piping and controls; installation of two (2) new RAS flow meters stations; installation of one (1) new 0.11 MG gravity sludge thickener with piping and controls; installation of one (1) new thickened sludge pump station consisting of two (2) grinders, two (2) TWAS 100 GPM pumps, piping and controls; installation of one (1) new sludge receiving station consisting of 15 ft x 15 ft drying bed basin, liquid collection system, piping; conversion of two (2) existing (first and second) 0.75 MG aeration basins to partitioning for 0.125 MG anoxic and 0.625 aerobic zones and the addition to each basin of three (3) new submersible mixers, new fme bubble diffuser system, one (1) new 4,167 GPM maximum variable speed internal recycle pump, new piping and other controls; conversion of two (2) existing 0.p4 MG gravity thickener tanks to equalization basins with the addition to each tank of two (2) new equalization 44.5 GPM pumps, new piping and controls; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial come fiance, intent and in conformity with all applicable regulations and statutes and the project plans;specifications, and other supporting documentation comprising the Authorization to Construct Perrot Application package. Signature Date 4/i5/I6 Mail this Certification to: Registration No. 043278 Attn: Ron Berry Complex Permitting Unit DENR/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 ool I I I U iiii, `�N CgR� ', 000ao , .',qv' OpESSIp`�, 'I. • 0 9°7 — - - g <0 SEAL •o _ 043278 e o — o ▪ 0 H 5r" • `` iiiiU I i i++t�'` Pat McCrory Govemor AtrA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Thomas A. Reeder Director • February 26, 2014 Brad Caldwell, Public Utilities Director City of Shelby 924 West Grove Street Shelby, NC 28�150 Dear Mr. Caldwell: John E. Skvarla, III Secretary SUBJECT: Authorization to Construct A to C No. 024538A02 City of Shelby First Broad River WWTP A letter of request for an Authorization to Construct was received December 3, 2013, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 6.0 MGD First Broad River WWTP, with discharge of treated wastewater into the First Broad River in the Broad River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of one (1) new inclined rotating drum screen system with piping and controls; installation of one (1) new aeration basin distribution box with piping and controls' installation of one (1) new (third) 0.75 MG aeration basin partitioned with 0.125 MG anoxic and 0.625 MG aerobic zones and consisting of three (3) submersible mixers, fine bubble diffuser system, one (1) 4,167 GPM maximum variable speed internal recycle pump, piping and other controls; installation of three (3) new ,550 SCFM blowers with piping and controls; installation of one (1) new (third) r on -potable 225 GPM pump with piping and controls; installation of two (2) new RA. flow meters stations; installation of one (1) new 0.11 MG gravity sludge thickener with piping and controls; installation of one (1) new thickened sludge pump station consisting of two (2) grinders, two (2) TWAS 100 GPM pumps, piping and controls; installation of one (1) new sludge receiving station consisting of 15 ft x 15 ft drying bed basin, liquid collection system, piping; conversion of two (2) existing (first and second) 0.75 MG aeration basins to partitioning for 0.125 MG anoxic and 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 Fax: 919-807-6489 Internet: www.ncwateraualitv.ort An Equal OpportunityW flrmative Action Employer Brad Caldwell, Public Utilities Director February 26, 2014 Page 2 of 3 0.625 aerobic zones and the addition to each basin of three (3) new submersible mixers, new fine bubble diffuser system, one (1) new 4;167 GPM maximum variable speed internal recycle pump, new piping and other controls; conversion of two (2) .existing 0.04 MG gravity thickener tanks to equalization basins with the addition to each tank of two (2) new equalization 44.5 GPM pumps, new piping and controls; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0024538 issued August 1, 2010, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0024538. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Mooresville Regional Office, telephone number (704) 663-1619, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: NPDES Unit, DWRIDENR, 1617 Mail Service Center, Raleigh, NC 27699-1617. • Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. Brad Caldwell, Public Utilities Director February 26, 2014 Page 3 of 3 A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Ron Berry at telephone number (919) 807-6396. Sincere Thomas A. Reeder cc: Christopher Crotwell, P.E. HDR Engineering, Inc of the Carolinas 440 South Church Street Suite 1000 Charlotte, NC 28202 DWR/Mooresville Regional Office, Water Quality Programs Central Files NC0024538 NPDES File NC0024538 Without Engineer's Certificate attached: Cleveland County Health Department DWI/ Ken Pohlig