Loading...
HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20120821Beverly Eaves Perdue Governor A74i NCDENR X21 North Carolina Department of Environment and Natural Reso <201 Division of Water Quality s9NOSRpU 2 Charles Wakild P E QFreeman Director &fptary August 17 2012 Mr J B Setzer P E Division 14 Engineer N C Department of Transportation 253 Webster Road Sylva North Carolina 28779 Subject Inspection NCSR 1783 Upward Road DWQ Project 08 1327 TIP No R 4430 Henderson County Dear Mr Setzer On August 2 2012 I inspected the construction work on Upward Road between US Highway 176 and Howard Gap Road in Henderson County Construction work is continuing all along Upward Road between Howard Gap Road and US Highway 176 with the main focus on gradmg paving and moving traffic onto the new section of Upward Road Please ensure that all sediment and erosion control structures are being maintained as required and that seeding and mulching are being performed as needed to protect State surface waters Please refer to the attached copy of the inspection report for additional comments regarding the inspection If you have questions please call me at 828 296 4500 Sincerely Michael R Parker Environmental Senior Specialist Attachment cc Aaron Powell Mark Davis Division 14 DEO Ed Ingle Roadside Environmental Transportation Permittmg Unit Mike Parker Asheville Regional Office Upward Road R 4430 Inspection Letter August 2012 SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778-8211 Phone 828 296 -45001 FAX 828 299 7043 Internet www ncwaterguality org An Equal Opportunity 1 Affirmative Action Employer NorthiCarollna lVaturallu P Wetland Inspection Report Project Num 20081327 Version 1 Status Issued Protect Name NCDOT SR 1783 (R 4430) Project Type Road /Highway Widening County Henderson Region Asheville Location NCDOT SR 1783 (R 4430) Latitude +35 1751 Longitude 82 2425 SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 08/02/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person Title Phone On Site Representative(s) Primary Inspector Michael R Parker Phone 828 296 4500 Secondary Inspector(s) Facility compliance Status E Compliant n Not Compliant Program Area 401 (includes isolated /non 404) Question Areas 0 Permit (401 WQC) Inspection Summary Reviewed project with DOT representatives Temporary seed and mulch all disturbed areas as soon as possible Repair silt fence along west bound on ramp at 1 26 Repair and stabilize slopes below the temporary bridge Repair slopes and place rip rap on slopes at inlet to 48 inch pipe Also stabilize stream above headwall to prevent head cut Install matting on disturbed areas around headwall Page 1 Project Num 20081327 Owner NC DOT PDEA Inspection Date 08/02/2012 Inspection Type Site Inspection (DOT) Reason for Visit Routine Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment 0000 0000 ■000 Page 2 J.