HomeMy WebLinkAbout20021157 Ver 4_PreFiling Email 30-Day Clock Reached Email_20210316Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Tuesday, March 16, 2021 12:01 AM
To: brubino@quible.com
Cc: Tankard, Robert
Subject: Pre -Filing Time Clock has been reached for Lot 66 Beachside Extension - 20021157
Ver 4
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Lot 66 Beachside
Extension that you submitted on 2/13/2021. The ID number for that project is 20021157, Version 4.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored
ID#* 20021157 Version* 4
Regional Office* Washington Regional Office - (252) 946-6481
Reviewer List* Robert Tankard
Pre -Filing Meeting Request submitted 2/13/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Brian Rubino
brubino@quible.com
Lot 66 Beachside Extension
Sarah and Christopher Folliard
Hyde
Street Address
7751 Cheathams Rd.
Address Line 2
aty
Amelia Courthouse
Rbstal / Zip Code
23002
Is this a transportation project?* r Yes r No
State / Frovince / Region
VA
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
401 Cert 02-1157
Do you know the name of the staff member you would like to request a meeting with?
Chris Pullinger
Please give a brief project description below.*
Chris,
This is a lot that had a prior 401 cert in 2006 for the previous owner.
Authorized 404 fill impacts for this lot at that time were 0.05 acres of
404 wetlands. The prior owner performed the permitted fill (but did
not build) after fulfilling mitigation requirements through NCEEP
(currently NCDMS). The 401 approval for this project included Lots
66 and 58 (both owned by Ann Warner at the time). Total permitted
fill was 0.09 acres in 2006 (0.05 acres for Lot 66 and 0.04 acres for
Lot 58). This also received a Nationwide 18 Permit.
Now, the owners of Lot 66 are Sarah and Chris Folliard. They would
like to build a residential home that has been designed, and in order
to do this, they propose to fill and additional 400 sq.ft. (.009 ac) of
404 wetlands as shown on the attached plan. I have been in
communication with Billy Standridge, USACE about this current
request. This is not a waterfront property and constitutes less than
0.1 ac of wetlands total (past and current permit request combined). I
believe this to be notification to DWR only, but am available to meet if
necessary.
Thanks,
Brian Rubino
Please give a couple of dates you are available for a meeting.
2/25/2021
2/15/2021
Please attach the documentation you would like to have the meeting about.
hines-pamlico point -lot 66-rev prelim-01 -31 - 625.09KB
21.pdf
USGS_OCRACOKE.pdf 1.14MB
NRCS_Soi I_Ma p. pdf 320.16KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 2/13/2021