Loading...
HomeMy WebLinkAbout20120662 Ver 1_Application_20120826 Page 1 of 11 PCN Form – Version 1.3 December 10, 2008 Version Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Co rps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mi tigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coast al counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of En vironmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: 17BP.2.R.17 Lenoir 163 Bridge To Pipe Replacement S R 1324, Kennedy Home Road Over Canal WBS Element Number 17BP.2.R.17 2b. County: Lenoir 2c. Nearest municipality / town: Kinston 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 17BP.2.R.17 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Departm ent of Transportation 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 105 Pactolus Highway NC 33 P .O. Box 1587 3e. City, state, zip: Greenville, NC 27835 3f. Telephone no.: 252-429-2800 3g. Fax no.: 252-830-3341 3h. Email address: jbjohnson@ncdot.gov Page 3 of 11 PCN Form – Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID ): 17BP.2.R.17 Lenoir 163 Bridge To Pipe Replacement SR 1324, Kennedy Home Road Over Canal 1b. Site coordinates (in decimal degrees): Latitude: N 35.251571 Longitude: - W 77.702084 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: N/A acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, e tc.) to proposed project: Falling Creek, a Tributary of The Neuse River 2b. Water Quality Classification of nearest receiving w ater: C;Sw, NSW 2c. River basin: Middle Neuse 03020202 3. Project Description 3a. Describe the existing conditions on the site and th e general land use in the vicinity of the project at t he time of this application: SR 1324, Kennedy Home Road is a paved Secondary Stat e Highway. Woodlands and Agriculture dominate the landscape. 3b. List the total estimated acreage of all existing wetlands on the property: 0 Square Feet (0.0 Acres) of 404 Wetland Impacts For The Bridge To Pipe Replacement. 3c. List the total estimated linear feet of all exis ting streams (intermittent and perennial) on the pr operty: 60' This site is part of a longer adjacent stream sys tem 3d. Explain the purpose of the proposed project: Bridge To Pipe Replacement ; the existing bridge ha s deteoriated and needs replacing. 3e. Describe the overall project in detail, including the type of equipment to be used: The Existing 76' Long Timber Bridge on Timber Pilin gs will be replaced with a Proposed 2 @ 112" x 75" x 48.5' CMPA with Headwalls. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinat ions by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: Yes No Unknown 4b. If the Corps made the jurisdictional determinat ion, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdiction al determinations or State determinations and attac h documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the pas t? Yes No Unknown 5b. If yes, explain in detail according to “help file ” instructions.