Loading...
HomeMy WebLinkAbout740095_Plan of Action_20210316_ �FoFi�Fo/N N9�p�� PLAYS OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILQW� C� '�9 THIRTY Q30) DAY DRAIN DOWN PERIOD 16o 4,9i0/2a are� h��9rog goer in I. TOTAL PAN TO i:E LAND APPLIED PER WASTE STRUCTURE o�sS k,e 1. Structure Name/Identifier (ID): J.R. Lewis Lagoon #2 (Connected by Pipe) 2. Current liquid volume in 25 yrJ24 hr. storm storage & structural freeboard a. current liquid level according to marker 17 inches b. designed 25 yr./24 hr. storm & structural freeboard 19 inches c. line b - line a (inches in red zone) = t 1 inches d. top of dike surface area according to design 34.405 ft2 (area.at below structural freeboard elevation) 211/ y� -e. line c x line d x 7.48 gallons = 4.6 gallons 12 .ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days gallons g. volume of waste produced according to structural- design 45,422 ft3 h. actual waste produced = current herd # x line g = 23,810 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 35,730 ft3 k. (lines h + i +i) x 7.48 x 30 days = 74.226.5 line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 12/17/2015 6 lb/1000 gal. Yfe lb PAN m. (lines e + k) x line I = 1000 REPEAT SECTION / FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE 'ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21100 1 S9, Y 1. structure ID:Lagoon 2 (Connected by Pipe) line m = '1g Ib PAN 2. structure ID: line m = Ib PAN 3. structure ID: line m = Ib PAN 4. structure ID: line m = Ib PAN 5. structure ID: line m = Ib PAN 6. structure ID: line m = Ib PAN n. lines 1 +2+3+4+5+6 = Lit 20.9 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN o. tract # p. field # . q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE ' FOR FIELD (Ibs.) column r x s . _. "vr. u. application window' / i _ r e` - /7V c i'. ./` . ,\.... r c';w,• ; , / l ! / Ili ,.✓t i G y \ \. `/ Ai.: \ 4/ ' ('r �y ,/ \ ' i , . mC g �I +��^ if9 76 b t :,--F dove -lc 3, v . 42• t • . /.' ' 7,6 , , 'St AI r, Lr y it ? ..20,0 . s 3./ 4,4 .2,s 1 S, u 7 //2. 30,4 ' .2 • D 151il 9 A.8' •1d.5 ,ri'I/ 6 7 / • 1 / S 3,f Id. 7 ` , tate current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = _ lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2/21/00 2 w. Total PAN to be land applied (line n from section ll) = J � x. Crop's remaining PAN balance (line v from section ill =� lb. PA y. Overall PAN balance (w - x) = Vb• ANN lb.PAN Line y must show as a deficit. if line y does not show as a deficit, lust course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. if new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. if animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2/21/00 3