HomeMy WebLinkAbout740095_Plan of Action_20210316_ �FoFi�Fo/N
N9�p��
PLAYS OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILQW� C� '�9
THIRTY Q30) DAY DRAIN DOWN PERIOD 16o
4,9i0/2a are�
h��9rog goer
in
I. TOTAL PAN TO i:E LAND APPLIED PER WASTE STRUCTURE o�sS
k,e
1. Structure Name/Identifier (ID): J.R. Lewis Lagoon #2 (Connected by Pipe)
2. Current liquid volume in 25 yrJ24 hr. storm storage & structural freeboard
a. current liquid level according to marker 17 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19 inches
c. line b - line a (inches in red zone) = t 1 inches
d. top of dike surface area according to design 34.405 ft2
(area.at below structural freeboard elevation) 211/ y�
-e. line c x line d x 7.48 gallons = 4.6 gallons
12 .ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
gallons
g. volume of waste produced according to structural- design 45,422 ft3
h. actual waste produced = current herd # x line g = 23,810 ft3
certified herd #
i. volume of wash water according to structural design
ft3
j. excess rainfall over evaporation according to design 35,730 ft3
k. (lines h + i +i) x 7.48 x 30 days = 74.226.5
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/17/2015 6 lb/1000 gal.
Yfe lb PAN
m. (lines e + k) x line I =
1000
REPEAT SECTION / FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE 'ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2/21100 1
S9, Y
1. structure ID:Lagoon 2 (Connected by Pipe) line m = '1g Ib PAN
2. structure ID: line m = Ib PAN
3. structure ID: line m = Ib PAN
4. structure ID: line m = Ib PAN
5. structure ID: line m = Ib PAN
6. structure ID: line m = Ib PAN
n. lines 1 +2+3+4+5+6 =
Lit
20.9 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN
o. tract #
p. field #
.
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(Ib/acre)
t. TOTAL PAN
BALANCE '
FOR FIELD
(Ibs.)
column r x s
. _. "vr.
u.
application
window'
/
i
_
r
e` - /7V c i'.
./` .
,\....
r c';w,• ;
,
/
l ! / Ili
,.✓t
i G y
\
\. `/
Ai.: \
4/ ' ('r
�y
,/ \
' i , . mC
g
�I +��^
if9 76 b
t :,--F
dove -lc
3, v
. 42• t
•
. /.'
'
7,6
, , 'St
AI r,
Lr
y
it ?
..20,0
.
s
3./
4,4
.2,s
1 S, u
7
//2.
30,4
'
.2 • D
151il
9
A.8'
•1d.5
,ri'I/
6
7 /
•
1
/ S
3,f
Id. 7
`
,
tate current crop ending application date or next crop application beginning date for available receiving
crops during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) = _ lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
PoA (30 Day) 2/21/00
2
w. Total PAN to be land applied (line n from section ll) = J �
x. Crop's remaining PAN balance (line v from section ill =� lb. PA
y. Overall PAN balance (w - x) =
Vb• ANN
lb.PAN
Line y must show as a deficit. if line y does not show as a deficit, lust course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. if new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. if animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
PoA (30 Day) 2/21/00 3