HomeMy WebLinkAboutNCG210471_Inspection Report_20210317ROY COOPER
Governor
MICHAEL S. PECAN
Secretary
BRIAN WRENN
Director
WNC Dry Kiln Inc
Attention: Joe Lyle
65 Jacktown Road
Marion, North Carolina 28752
NORTH CAROLINA
Environmental Quality
March 17, 2021
Subject: Compliance Evaluation Inspection
WNC Dry Kiln
Permit: NCG210000
Certificate of Coverage: NCG210471
McDowell County, North Carolina
Dear Mr. Lyle:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on March 2, 2021.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Isaiah Reed, El, CPSWQ, N
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
_ Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
828.296.4500
Permit: NCG210471
SOC:
County: McDowell
Region: Asheville
Contact Person: Joe Lyle
Compliance Inspection Report
Effective: 11/22/19 Expiration: 07/31/23 Owner: Wnc Dry Kiln Inc
Effective: Expiration: Facility: WNC Dry Kiln
65 Jacktown Rd
Title:
Marion NC 28752
Phone:828-925-6699
Directions to Facility:
From exit 86 on 140 go north one mile on Hwy 226, take a left on Jacktown Rd. facility is 0.10 mile on left.
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 03/02/2021 Entry Time 10:30AM Exit Time: 11:30AM
Primary Inspector: Isaiah L Reed Phone: 828-296-4614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge CDC
Facility Status: ❑ Compliant 0 Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG210471 Owner - Facility: Wnc Dry Kiln Inc
Inspection Date: 03/02/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On March 2, 2021 this facility was inspected for compliance. I met with Joe Lyal on site. During the inspection, it was noted
that the Stormwater Pollution Prevention Plan (SWPPP) has not been maintained as outlined in the NCG210000 General
Permit. The permittee shall immediately begin efforts to maintain and update all necessary SWPPP documentation and
conduct all required monitoring as outlined in the NCG210000 General Permit. It is recommended that the monitoring point
be evaluated and modified to all for collection of a more representative sample.
If you have any questions, please call this office at (828) 296-4614
Page 2 of 3
Permit: NCG210471 Owner - Facility: Wnc Dry Kiln Inc
Inspection Date: 03/02/2021 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0 ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
0 ❑ ❑ ❑
# Does the Plan include a detailed site map including oulfall locations and drainage areas?
0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ 0 ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
N ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑ N ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ 0 ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ 0 ❑ ❑
Comment: The Stormwater Pollution Prevention Plan has not been maintained.
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually?
❑ 0 ❑ ❑
Comment: Annually
Analytical Monitoring
Yes No NA NE
Has the facility conducted its Analytical monitoring?
❑ 0 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
❑ ❑ N ❑
Comment: Annually
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
0 ❑ ❑ ❑
# Were all outfalls observed during the inspection?
0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑ ❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
❑ 0 ❑ ❑
Comment
Page 3 of 3