Loading...
HomeMy WebLinkAboutNCG210471_Inspection Report_20210317ROY COOPER Governor MICHAEL S. PECAN Secretary BRIAN WRENN Director WNC Dry Kiln Inc Attention: Joe Lyle 65 Jacktown Road Marion, North Carolina 28752 NORTH CAROLINA Environmental Quality March 17, 2021 Subject: Compliance Evaluation Inspection WNC Dry Kiln Permit: NCG210000 Certificate of Coverage: NCG210471 McDowell County, North Carolina Dear Mr. Lyle: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on March 2, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Isaiah Reed, El, CPSWQ, N Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources _ Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 828.296.4500 Permit: NCG210471 SOC: County: McDowell Region: Asheville Contact Person: Joe Lyle Compliance Inspection Report Effective: 11/22/19 Expiration: 07/31/23 Owner: Wnc Dry Kiln Inc Effective: Expiration: Facility: WNC Dry Kiln 65 Jacktown Rd Title: Marion NC 28752 Phone:828-925-6699 Directions to Facility: From exit 86 on 140 go north one mile on Hwy 226, take a left on Jacktown Rd. facility is 0.10 mile on left. System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/02/2021 Entry Time 10:30AM Exit Time: 11:30AM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge CDC Facility Status: ❑ Compliant 0 Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG210471 Owner - Facility: Wnc Dry Kiln Inc Inspection Date: 03/02/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: On March 2, 2021 this facility was inspected for compliance. I met with Joe Lyal on site. During the inspection, it was noted that the Stormwater Pollution Prevention Plan (SWPPP) has not been maintained as outlined in the NCG210000 General Permit. The permittee shall immediately begin efforts to maintain and update all necessary SWPPP documentation and conduct all required monitoring as outlined in the NCG210000 General Permit. It is recommended that the monitoring point be evaluated and modified to all for collection of a more representative sample. If you have any questions, please call this office at (828) 296-4614 Page 2 of 3 Permit: NCG210471 Owner - Facility: Wnc Dry Kiln Inc Inspection Date: 03/02/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including oulfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ N ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: The Stormwater Pollution Prevention Plan has not been maintained. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: Annually Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ N ❑ Comment: Annually Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment Page 3 of 3