Loading...
HomeMy WebLinkAboutNCG030321_WW AFCO Inspection Letter_20210316GREENSBORO NORTH CAROLINA WATER RESOURCES March 16, 2021 Joey Dehart W&W AFCO Steel 9035 W. Market Street Colfax, NC 27235 RE: Industrial Compliance Inspection Inspection location: W&W AFCO Steel 9035 W. Market St, Colfax, NC 27235 SW Permit #: NCG030321 Dear Mr. Dehart: On March 11, 2021 the City of Greensboro Stormwater Management Division completed an industrial compliance inspection of W&W AFCO Steel. Local regulations permit an inspection of industrial facilities under authority granted by City of Greensboro Code of Ordinance Chapter 30, Article 12, Section 7.1 (C-5). This inspection consisted of two parts: a review of the facility files/records and an on -site facility inspection. The inspection was performed by Jordan Lerew, and the following deficiencies/observations were noted during the inspection. Storm water Pollution Prevention Plan/Spill Plan Review Site Maps and SWP3 • Update general location and/or site map to identify whether any receiving water are impaired or if the site is located in a watershed for which a TMDL has been established. Please refer to permit Part II, Section A(I.a). Spill Prevention and Response Plan • Have personnel identified as responsible for implementing the SPRP sign and date the SPRP annually to acknowledge responsibilities. Please refer to permit Part II Section A(3). PO BOX 1170 • GREENSBORO NC 27402-1170 • WWW.GREENSBORO-NC.GOV • 336-373-CITY (2489) WR 5035 Monitoring • Include a review and comparison of sample analytical data to benchmark values over the past year, including a discussion of Tiered Response status. Please refer to permit Part II Section A(8.f). Solvent Management Plan • Annually updated and quantified inventory of the total toxic organic compounds present on site during the previous 3 years. Please refer to permit Part II Section A(10). Employee Training • No deficiencies observed. Site Inspection Preventative Maintenance/Good Housekeeping • Attempt to stabilize areas surrounding inlets or install inlet protections to keep gravel and trash from entering the stormwater system. • Sweep shot blast regularly • Seal used containers and drums Non-Stormwater Discharges • No deficiencies observed. It is recommended that W&W AFCO take appropriate actions to correct the noted deficiencies. If you have any questions concerning this inspection, please contact me at 336-373-7665 or Jordan.lerew@greensboro-nc.gov. Sincerely, Jordan Lerew City of Greensboro, Water Resources Department cc: Peter Schneider, Water Quality Supervisor Levi Hiatt, N.C. Dept. of Environment Quality Industrial Inspection File PO BOX 1170 • GREENSBORO NC 27402-1170 • WWW.GREENSBORO-NC.GOV • 336-373-CITY (2489) WR 5035 r M GREENSBORO City of Greensboro Stormwater Industrial Inspection Report Facility Information Facility Name: W* w A F C 0 S}ee 1 Date: 3- 1) - 2-1 Address: Qp,-k,r' w. Marke4 S+ Phone #: 3`;(,- 33 S - 2e1yS Contact Person: NAICS/SIC Code: 3ggl N.C. Permit lD#: Industrial Activity: / e-+a I QL;ratio-, Insaection Tvne/Purpose (Select one ROUTINE COMPLIANCE INSPECTION Inspector Name: ZarAar, Lerew RESPONSE TO COMPLAINT Telephone: 33(, - a73- yGGs SPILL Entry Time: /410o OTHER DESCRIBE Exit Time: /(goo Stormwater Pollution Prevention Plan/Spill Plan Review A. SITE MAPS & SWP3 YES NO NA 1. Is a copy of the current NPDES permit at the facility? 2. If the facility has an expired individual permit, did the facility submit the Renewal Application Form at least 180 days prior to expiration? X 3. Is a copy of the SWP3 at the facility? 4. Is the SWP3 signed? seepermit: Pt. II, Sec. A, Par. 8 5. Is the general location map present? 6. Is there a site map that shows drainage patterns, outfalls, floor drains, etc.? 7. Is there a written or unwritten Stormwater Facility Inspection Program (i.e. routine site observations noting potential issues)? 8. Are records present documenting the description and releases of stormwater accumulated in any secondary containment? seepermit: Pt. II, Sec. A Par. 2b X 9. Are the names of receiving waters listed or shown and labeled on the site map)? 10. Is there a signed, annual certification stating that the facility has been tested for non- stormwater discharges from the site? seepermit: Pt. II, Sec. A, Par. 1 e X B. SPILL PREVENTION & RESPONSE PLAN YES NO NA 1. Are procedures in place fors ill response and cleanup? 2. Is there a list of significant spills that have occurred since permit was issued? 3. Does the spill plan state how to properly dispose of materials after a spill? 4. Are the contactperson(s) and plan up-to-date? C. MONITORING YES NO NA 1. Is analytical water quality sampling up-to-date and are records readily available? 2. Have any of the required sampling arameters been outside of the benchmark values? 3. If so, have Tiered Response procedures been implemented and documented? 4. Is qualitative monitoring up-to-date and are records readily available? D. EMPLOYEE TRAINING YES NO NA 1. Are employees trained at least annually on spill responseprocedures? 2. Does training include stormwater discharge prohibitions and wastewater discharge requirements? X 3. Are employees properly trained at least annually on the appropriate record -keeping and inspections of the stormwater drainage network? 4. Are training records readily available and a part of the SWP3? ly 5. Are the training records up-to-date? Recommendations/Requirements: Aq)Dtoo4 rmDt 4r (ecr i4) WL6t-k. ljy) S;jt,4ut&% nUAAJ Poe dr�4�_ ej 4 p% l\ tYJoe s t,�mni.. 0/, 2018 Stormwater Industrial Inspection Report (cont'd) Site Inspection A. PREVENTATIVE MAINTENANCE/GOOD HOUSEKEEPING YES NO NA 1. Are materials stored in areas that limit exposure to precipitation or runoff (Dumpsters covered, pallets properly stored, etc.)? 2. Is there adequate secondary containment for above -ground storage tanks and material handling areas (i.e. appropriate storage capacity based on visual observation)? x 3. Is there a process in place for properly removing rainwater from the secondary containment areas? Y 4. Do secondary containment valves have functioning locks? 5. Are materials (e.g. chemicals properly labeled? 6. Was the vehicle/equipment maintenance area evaluated at time of inspection? 7. Is vehicle and/or equipment washing done in an area so that the wastewater can be properly managed? k 8. Are leaks present at material -handling and fueling stations? 9. If leaks are present, are they properlycontained? 10. Are loading and unloading areas being properly maintained to prevent non- stormwater discharges? �( 11. Are appropriate spill containment and cleanup materials/equipment kept onsite and located in an obvious or convenient location? B. N©N-STORMWATER DISCHARGES YES NO NA 1. Was the stormwater drainage system inspected for non-stormwater discharges or evidence thereof? 2. Do the stormwater outfalls listed on the site map match what was visually observed in X the field? Recommendations/Requirements: t, �• _� << • arcc� Q�o�.c( akL e� ��aiy ��v�T{,�/rw Final Evaluation (Check most appropriate box.) No deficiencies were observed during inspection. _Minor issues were observed during inspection. Major issues were observed during inspection. Site needs to be forwarded to the North Carolina Department of Environment Quality for reinspection. Water quality violation (or significant threat) was observed. Local enforcement is recommended and site should be referred to the N.C. Department of Environment Quality. Inspector Signature: Date: Z-1t - z 2018