Loading...
HomeMy WebLinkAbout20120809 Ver 1_Application_20120828STATE OF NORTH CAROLINA q06 2 1� � 2 CJ )Z"'8 D;T4 oR,yhq ny DEPARTMENT OF TRANSPORTATION '�R, BEVERLY EAVES PERDUE GOVERNOR August 22 2012 Ms Liz Hair US Army Corp of Engineers Asheville Regulatory Field Office 151 Patton Avenue Room 208 Asheville N C 28801 5006 EUGENE A CONTI JR SECRETARY 270809 SUBJECT Bridge #129 Replacement SR 1577 (Pisgah Ridge Circle) Iredell County Dear Ms Hair The North Carolina Department of Transportation (NCDOT) requests authorization to replace Bridge 4129 on SR 1577 (Pisgah Ridge Circle) in Iredell County with double 50 foot corrugated arched metal pipes The main flow pipe will be 142 x 91 CMPA and will be buried based upon the existing streambed elevation The 128 x 83 flood flow pipe will be installed at streambed elevation and will tie into existing stream benches Approximately 15 feet of riprap will be used at the pipe outlet and 5 feet at the pipe inlet for structure /bank stabilization Temporary cofferdams /bypass pumping will be used to divert the stream flow around the construction sites as needed Upon project completion any areas affected by temporary cofferdams will be restored to pre project conditions The total scope of the work will impact 70 feet of an unnamed tributary to Snow Creek which is classified as a WS IV watershed by the Division of Water Quality The project is not located within '/z mile of any critical watershed area nor is SR 1577 a rural or urban arterial therefore hazardous spill basins are not required Enclosed is the hazardous spill basin checklist This office has conducted a GIS and field survey for the project for historical sites and threatened /endangered species sites No sites listed on the National Register of Historic Places are located in the vicinity of the project nor did there appear to be any eligible structures The federally listed species for Iredell County (USFWS listed date September 22 2010) include the Dwarf flowered heartleaf (Hexastylis naniora) and the Bog Turtle (Clemmys muhlenbergit) Post Office Box 47 Shelby North Carolina 28151 0047 Bridge #129 SR 1577 Pisgah Ridge Circle Page 2 August 22 2012 The Natural Heritage Program records document the nearest dwarf flowered heartleaf location approximately 18 miles northwest of the proposed project The heartleaf is usually found on dry to moist ravine slopes (usually north facing and of the oak hickory pine forest type) and in boggy areas near sprmgheads There is no potential habitat within the proposed project area and no species were observed National Heritage Program records document the nearest bog turtle location approximately 6 5 west of the proposed project area Bog turtles are usually found in bogs marshes and wet pastures There is no suitable habitat located within the project area The proposed project will have a finding of no effect on the dwarf flowered heartleaf (Hexastylis naniora) species or bog turtle (Clemmys muhlenbergn) I have enclosed a pre construction notification for a NW #14 sketches of planned activities and location maps relative to the project Please advise if mitigation is required Any necessary mitigation that may be necessary for the construction of the project will be provided in accordance with the procedures detailed in the U S Army Corp of Engineers letter dated September 1 2004 from Mr Ken Jolly to Dr Gregory J Thorpe Project information for the 401 Automated Payment Procedure is as follows • Work order number 150465 55120005 12B 204911 3300 • TIP # NA • Project Category $240 00 Fee If you have any questions or concerns please feel free to contact me at (704) 480 -9044 Thank you for your time and consideration to this matter BY Enclosures Respectfully yours M L Holder P E Division Engineer Twelfth Division Trish Beam Division 12 Environmental Supervisor Cc David Wainwright DWQ 401 /Transportation Permitting Unit Alan Johnson DWQ Mooresville Regional Office Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version Pre - Construction Notification PC Form A Applicant Information 1 Processing 1 a Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 14 or General Permit (GP) number 1c Has the N WP or GP number been verified by the Corps? ❑Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Bridge #129 SR 1577 (Pisgah Ridge Circle) 2b County Iredell 2c Nearest municipality / town Statesville 2d Subdivision name NA 2e NCDOT only T I P or state project no NA 3 Owner Information 3a Name(s) on Recorded Deed NCDOT Right of Way 3b Deed Book and Page No 3c Responsible Party (for LLC i f applicable) 3d Street address 3e City state zip 3f Telephone no 3g Fax no 3h Email address Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name Mike Holder 4c Busines s name (if applicable) N C Department of Transportation Division 12 4d Street address 1710 East Marion Street 4e City state zip Shelby NC 28151 4f Telephone no 704 480 9020 4g Fax no 704 480 5401 4h Email address mholder @ncdot gov 5 Agent/Consultant Information (if applicable) 5a Name Trish Beam 5b Business name (if applicable) N C Department of Transportation Division 12 5c Street address 1710 East Marion Street 5d City state zip Shelby NC 28151 5e Telephone no 704 480 9044 5f Fax no 704 480 5401 5g Email address pdbeam @ncdot gov Page 2 of 10 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) NA lb Site coordinates (in decimal degrees) Latitude 35 92458 Longitude 8098587 (DD DDDDDD) ( DD DDDDDD) 1c Property size 0 10 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to proposed project UT to Snow Creek 2b Water Quality Classification of nearest receiving water WS IV 2c River basin Yadkin 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Existing timber bridge on paved secondary road Landuse in vicinity of bridge is mostly wooded 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 100 3d Explain the purpose of the proposed project To replace a deteriorating timber deck bridge for the safety of the traveling public 3e Describe the overall project in detail including the type of equipment to be used NCDOT proposes to replace a timber deck bridge with a double 50 foot long CMPA s with a 142 x 91 main flow pipe and a 128 x 83 flood flow pipe Fifteen feet of riprap will be used at the corners of the culverts for structure stabilization 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments Jurisdictional stream determination made by Division 12 DEO ❑ Yes ® No ❑ Unknown 4b If the Corps made the jurisdictional determination what type of determination was made? ❑ Preliminary ❑ Final 4c If yes who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain Page 3 of 10 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ —non 404 other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non 404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Fill from culvert Ut to Snow Creek ® PER ® Corps 10 50 construction E:1 INT ®DWQ S2 ®P ❑ T Riprap Structure Stabilization Ut to Snow Creek ® PER ❑ INT ® Corps ® DWQ 10 20 S3 ❑ PET Impervious dike for culvert Ut to Snow Creek ® PER E:1 INT ® Corps ®DWQ 10 100 construction S4 ❑ P ❑ T ❑ PER ❑ Corps [:11 NT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 70 31 Comments Permanent Impacts Page 4 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody Zone 1 impact Zone 2 impact Permanent (P) or impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or impact required Temporary T B1 ❑P ❑T F-1 Yes 01 ❑P ❑T 02 ❑P ❑T B2 ❑ P ❑ T 03 ❑P ❑T ❑ Yes 04 ❑P ❑T ❑ No 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed the complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded I Filled I Excavated FloodedJ Filled I Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If anv impacts reauire mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Tem ora T impact required B1 ❑P ❑T F-1 Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h Total buffer impacts 61 Comments Page 5 of 10 PCN Form — Version 1 3 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Disturbance to existing instream floodplain benches to be minimized and the high flow pipe will be installed to tie into these existing benches 1b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Minimization of impacts by installing appropriate erosion control measures 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigat ion option will be used for this project? ❑ Mitigation bank ❑Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments Any mitigation necessary shall be provided in accordance with the procedures detailed in the USACE letter dated September 1 2004 from Mr Ken Jolly to Dr Gregory J Thorpe 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 7 of 10 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why Complies with NCDOT s individual NPDES permit NCS000250 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? NA ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c if you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 26 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description The project is classified as a minimum criteria checklist project which has low potential for cumulative /indirect impacts and will not result in additional development which could impact water quality 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Page 9 of 10 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? E:1 Raleigh 5c if yes ind icate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Program database 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? No salt marshes oyster reefs or seagrass beds in the vicinity of the project 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? The National Register of Historic Places were reviewed for historic sites in the vicinity of the project however the bridge replacement project occur within a previously impacted area (NC DOT Right of Way) 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes ® No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? FEMA FIRM panal number 3710470800E M L �1 �r ,�oCL. '� g a� - 0- Applicant/Agents Printed Name Date Applicant/Agents Signature (Agents signature is valid only if an authorization letter from the applicant is provided ) Page 10 of 10 PCN Form — Version 1 3 December 10 2008 Version Vicinity Map Pisgah Ridge Circle, SR 1577 Iredell County h aao Sreo ount eMon L ch c arm c � 01 oop e� �co� rO�e E ob Farm 0 cefhs dne `a 'Da ui a cus Chu Bridge 129 G o0\1 �Ge Ivy Oak goo <c�e R b c ams D 0 � o HU a ..tea O � X Bolt ° '6e,�A Snow reek e R y �o��e rd Fa % G en �9 d n G�c h Bail y Farm G \xo o�� (a a0i = y O� B egill c Q at B woo 0 De1t� �N est adk n a e 0y 0 N 0 05 1 2 Mlles I I I I I I I I j E.�p��� �� r t a a i �' ' "a. �r} 4�Il�l �• y 4l7 _ it All [?�LL1 1 i r ��d111 ,t\ k y. 11 \Y j Ail `4 ' A fit` N1 LC71 0, {'•�� is a { } i i '\ a :L of "� S' + 1 ice°. 1 ♦ j f +y� ± i y Li MJ4 ?� — 4 r✓ t�i�'�� �``I I r � ;f� °,f` 4 ��"'C-- .'�-"L �"ti�``'�= � � lYf dt��,�r �d It Bridge #129 Replacement Rs �'- -� .r J/ ���- -.��.`ty �7 x.. -,i i �k�y 9 ti ',—,mss F • �{J/ f'r'.J tr t� {r .,. ,� 1J- ibO + ti i1 r r '� + + k t ``l k i .•- ,•° f .w, jr.r" � —,0 _ pkA @�Ziaq�_ It w 4 ) s ,� , i L, j� r i r } iris le� f-Y" x" 1� 7 F f � .� f l .✓rP` ti � � � � �I J�) � � j �,�� ! JtE f `• �� --� r I�.*� i �`'�� —� ti } � t (, � / � l "� ~ f�r'C f3J' ±F'F }'� { f f 'f Name CENTRAL Location 035 9245851 N 080 9858742 W Date 8/17/2012 Caption Bridge #129 Replacement SR 1577 (Pisgah Ridge Circle) Ut to Scale 1 inch equals 1000 feet Snow Creek WS IV watershed Yadkin River Basin Copynght (C) 1998 Maptech Inc o o, Up m { l0 s m m OO oflVo 3N�41105 Lo CL C y sp o p o (—n 00 =fir CD -1 Ob� m � (n7� -�a co Q) O m n 5Z � 5t O O D II II 0 o O Q 7 S O = O W un T v H tD /0 O Q O ri i v C -Oh l0 y C O C S �. OR C O o m F� 3 03 m3 y fVi iv - N �x° r- v fTl n =°moo m� °u3 'i�o 3DO�rno O CL m 0 Cr Uf N a O' O O -+ V { �" N °{ O �� °' ^0-n 0 3 n °mss on, Zvi°* �cc z -+ o C rn o Q 3 ao ° c �� CL a a- i7 m o Syi �a g m o 0 Q U ca w N V La Cl °+-qzv O G tp It n 3 S W S N � O A O l0 Ln d 7O 3 CMX a - p lD rr ^^ 3 Vl n' �m m o� n 3- o O p W M ( 7 O 'T , j o � n D mo O W� L 5 710 p O D m v 0 (� � Nam m � to o� o- V p° (� n 3 m N CL < S3 s H 1O21D DID 1D1O,D1O100000 � 'D'D,D,D �D �O%DIO 100000 O� -`NWA TJ VOG%DO NW TO-4MID O 1O 21O 1O 10 %D%0 �D%D%DOOOO O NWAUIO -4MIDO. -`NW 0 N 10 A O (� O [P ( -fi 0 Qn X La ? (0 � ~, a- a H _ —Lo F\) (0 N 3 C (0 M La r Q (0 3 N T 0 n� N ICS A N n Ln ti. p O to m o � No 7C1 Q 3 (71 Ln o Ul r) aD x (/n N tn 10, aLm N r, { v O '0 w 3 O 0 La LA o D -S-0 W S N X La ? (0 � ~, a- a H _ —Lo F\) (0 N M La r Q (0 3 o X f fl T 0 n� S � O 3 A N n Ln 3 m 3 3 Z 7C1 Q 3 (71 Ln o Ul r) C7 i v O N V c� c v °I \6 D` CA D. N N 0 W F O W v o 9F V 9 o F4 w N N 38 w S w ,p N A r�14 w 0o N W 9J�i4 N � A cn 932 W 9 2 La A_ DIN W ..n O- DOV ,D CO V o o g o T o � � A � J C Q. W A � N A N Nq N L" A Ln O V O N CO cn m x_ y C7 n � — vc- Q LO m ln\e a Do X W W C1 a V W 2 '0,0101010 1010\0%010 O O 00 O.-'N WACn O�VOC �D O.+NW V A � T w N 9 0 W F 0 W 0 9F V 9 o FF N N 9�8 rn 9Z, m S W.. W A 1 T N 7L 9 N O, A 9 Ln m 30 A Ln 10 O a� ,r V O N m m X ti -F to 7I7 (� a- x Cl 3 D �O 2 W O O 00 O.-'NWA Ul0 -4M 1O 0 -NW A_ OI2 N -n O_ ,D CO V o o � oD � � o A (71 O� W A N r+ CJI A Ln 10 O a� ,r V O N m m X ti -F to 7I7 (� a- x Cl 3 D �O 2 W O O 00 O.-'NWA Ul0 -4M 1O 0 -NW v� s } xFp *` u' �•+�� � '. lye \ � � ' � , s � � 4S. v� s } xFp *` u' �•+�� � '. lye \ � � ' � , NCDOT HAZARDOUS SPILL BASIN CHECKLIST Division 19 County Tredell Project ID 1213204911 River Basin Yadkin Bridge No 129 Route SR 1577, Pisgah Ridge Circle Stream UT to Snow Creek Water Quality Criteria Yes No Stream Crossing Blue Line On USGS w - ORW F 1V WSI F WS II,III OR IV, Crossing Within 0 5mi of W S Critical Area f Roadway Critena Route Designation- Arterial Urban Arterial Rural Additional Site Information Is a Hazardous Spill Basin Required? rdm -1if r ry r Yes No r- r Criteria Based Upon NCDOT "Best Management Practices for the Protection of Surface Waters" (March, 1997)