HomeMy WebLinkAboutNCG140315_CEI_20210316ROY COOPER
Governor
MICHAEL S. REGAN`
Secretary'
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Qualify
March 16, 2021
S & W Ready Mix Concrete Company, LLC
Attn: Hank Gay, Environmental Manager
PO Box 872
Clinton, NC 28329
Subject: COMPLIANCE EVALUATION INSPECTION
NPDES Stormwater General Permit NCG140000
S & W Ready Mix Concrete Company, LLC
S & W Ready Mix Concrete -Lumberton, Certificate of Coverage NCG140315
Robeson County
Dear Mr. Gay:
On March 10, 2021, a site inspection was conducted for the S & W Ready Mix Concrete -Lumberton facility located on South
Roberts Avenue in Lumberton, Robeson County, North Carolina. A copy of the Compliance InspectionReport is enclosed
for your review. Mr. Robbie Nobles, Plant Manager, and Mr. Timmy Duhon, Operations Manager, were also present during
the inspection and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject
facility is covered by NPDES Stormwater General Permit NCG140000 under Certificate of Coverage NCG140315. Permit
coverage authorizes the discharge of stormwater and/or wastewater, as approved in the original permitlapplication or
subsequent permit modification from the facility to receiving waters designated as Lumber River, class C;Sw waters in the
Lumber River Basin.
As a result of the inspection, the facility was found to be compliant with the conditions of the NCG140000 permit. Please
refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection.
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty
assessment of up to $26,000 per day for each violation. If you or your staff have any questions, comments, or needs
assistance with understanding any aspect of your permit, please contact me at (910) 433-3394 or via e-mail at
mike.lawyer@ncdenr.gov.
Sincerely,
Michael Lawyer, CPSWQ
Environmental Program Consultant
Division of Energy, Mineral and Land Resources
Enclosure: Compliance Inspection Report
cc: FRO — DEMLR, Stormwater Files
/Q Er„ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
,•lam."te ;i�� Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NCf7Ti1 F.1�gfN Mla
oeuaunakdit—ftlQW14 ,y�/+" 910.433.3300
Permit: NCG140315
SOC:
County: Robeson
Region: Fayetteville
Contact Person: Hank Gay
Directions to Facility:
Compliance Inspection Report
Effective: 08/01/17 Expiration: 06/30/22 Owner: S & W Ready Mix Concrete Company LLC
Effective: Expiration: Facility: S & W Ready Mix Concrete -Lumberton
S Roberts Ave
System Classifications: SWNC,
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
On -site representative
On -site representative
On -site representative
Related Permits:
Title: Environmental Manager
Certification:
Hank Gay
Timmy Duhon
Robbie Nobles
Lumberton NC 28358
Phone: 910-592-0180 Ext.4
Phone:
910-592-0180 ext4
910-738-1164
910-738-1164
Inspection Date: 03/10/2021 Entry Time 10:OOAM Exit Time: 11:30AM
Primary Inspector: Mike Lawyer Phone: 910-433-3394
Secondary Inspector(s):
Reason for Inspection: Complaint Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG140315 Owner - Facility: S & W Ready Mix Concrete Company LLC
Inspection Date: 03/10/2021 Inspection Type : Compliance Evaluation Reason for Visit: Complaint
Inspection Summary:
Inspection conducted in response to a complaint from business owner located across the road from the facility concerning
runoff and build-up of material in drainage pipe that runs across their property. At the time of inspection, there was no
evidence of runoff or concrete material leaving the facility. Reviewed facility's Stormwater Pollution Prevention Plan, which
contains all permit -required components as well as supporting documentation pertaining to facility inspections and the
annual review/update requirements. Monitoring records for 2017 through the first quarter of 2021 were also reviewed. Facility
has two discharge outfalls both of which receive process wastewater and stormwater flows. There are no stormwater-only
discharge outfalls. Monitoring has been conducted quarterly throughout the current permit term even though all monitioring
results indicate no wastewater limit violations. After the records review, observations were made of overall site conditions
including secondary containment structures for ASTs, raw material stockpiles, waste concrete stockpiles, vehicle cleaning
area and the discharge outfalls. At the time of inspection, facility appeared to be well operated and maintained.
Page 2 of 3
Permit: NCG140315 Owner - Facility:S & W Ready Mix Concrete Company LLC
Inspection Date: 03/10/2021 Inspection Type : Compliance Evaluation
Reason for Visit: Complaint
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0 ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
M ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
M ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
M ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
0 ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
M ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0 ❑ ❑ El
Has the Stormwater Pollution Prevention Plan been implemented?
0 ❑ ❑ ❑
Comment:
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment: Facility has no stormwater-only discharge outfalls.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? M ❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? M ❑ ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑
Comment: Facility has no stormwater-only discharge outfalls.
Page 3 of 3