Loading...
HomeMy WebLinkAboutNCG140315_CEI_20210316ROY COOPER Governor MICHAEL S. REGAN` Secretary' BRIAN WRENN Director NORTH CAROLINA Environmental Qualify March 16, 2021 S & W Ready Mix Concrete Company, LLC Attn: Hank Gay, Environmental Manager PO Box 872 Clinton, NC 28329 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater General Permit NCG140000 S & W Ready Mix Concrete Company, LLC S & W Ready Mix Concrete -Lumberton, Certificate of Coverage NCG140315 Robeson County Dear Mr. Gay: On March 10, 2021, a site inspection was conducted for the S & W Ready Mix Concrete -Lumberton facility located on South Roberts Avenue in Lumberton, Robeson County, North Carolina. A copy of the Compliance InspectionReport is enclosed for your review. Mr. Robbie Nobles, Plant Manager, and Mr. Timmy Duhon, Operations Manager, were also present during the inspection and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG140000 under Certificate of Coverage NCG140315. Permit coverage authorizes the discharge of stormwater and/or wastewater, as approved in the original permitlapplication or subsequent permit modification from the facility to receiving waters designated as Lumber River, class C;Sw waters in the Lumber River Basin. As a result of the inspection, the facility was found to be compliant with the conditions of the NCG140000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to $26,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3394 or via e-mail at mike.lawyer@ncdenr.gov. Sincerely, Michael Lawyer, CPSWQ Environmental Program Consultant Division of Energy, Mineral and Land Resources Enclosure: Compliance Inspection Report cc: FRO — DEMLR, Stormwater Files /Q Er„ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ,•lam."te ;i�� Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 NCf7Ti1 F.1�gfN Mla oeuaunakdit—ftlQW14 ,y�/+" 910.433.3300 Permit: NCG140315 SOC: County: Robeson Region: Fayetteville Contact Person: Hank Gay Directions to Facility: Compliance Inspection Report Effective: 08/01/17 Expiration: 06/30/22 Owner: S & W Ready Mix Concrete Company LLC Effective: Expiration: Facility: S & W Ready Mix Concrete -Lumberton S Roberts Ave System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): On -site representative On -site representative On -site representative Related Permits: Title: Environmental Manager Certification: Hank Gay Timmy Duhon Robbie Nobles Lumberton NC 28358 Phone: 910-592-0180 Ext.4 Phone: 910-592-0180 ext4 910-738-1164 910-738-1164 Inspection Date: 03/10/2021 Entry Time 10:OOAM Exit Time: 11:30AM Primary Inspector: Mike Lawyer Phone: 910-433-3394 Secondary Inspector(s): Reason for Inspection: Complaint Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140315 Owner - Facility: S & W Ready Mix Concrete Company LLC Inspection Date: 03/10/2021 Inspection Type : Compliance Evaluation Reason for Visit: Complaint Inspection Summary: Inspection conducted in response to a complaint from business owner located across the road from the facility concerning runoff and build-up of material in drainage pipe that runs across their property. At the time of inspection, there was no evidence of runoff or concrete material leaving the facility. Reviewed facility's Stormwater Pollution Prevention Plan, which contains all permit -required components as well as supporting documentation pertaining to facility inspections and the annual review/update requirements. Monitoring records for 2017 through the first quarter of 2021 were also reviewed. Facility has two discharge outfalls both of which receive process wastewater and stormwater flows. There are no stormwater-only discharge outfalls. Monitoring has been conducted quarterly throughout the current permit term even though all monitioring results indicate no wastewater limit violations. After the records review, observations were made of overall site conditions including secondary containment structures for ASTs, raw material stockpiles, waste concrete stockpiles, vehicle cleaning area and the discharge outfalls. At the time of inspection, facility appeared to be well operated and maintained. Page 2 of 3 Permit: NCG140315 Owner - Facility:S & W Ready Mix Concrete Company LLC Inspection Date: 03/10/2021 Inspection Type : Compliance Evaluation Reason for Visit: Complaint Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? M ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? M ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? M ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? M ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ El Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Facility has no stormwater-only discharge outfalls. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? M ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? M ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: Facility has no stormwater-only discharge outfalls. Page 3 of 3