Loading...
HomeMy WebLinkAbout20210209 Ver 1_Meeting Request Review_20210312 -,414117 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWircnmenred Quaffry ID#* 20210209 Version* 1 Regional Office* Asheville Regional Office-(828)296-4500 Reviewer List* Kevin Mitchell Pre-Filing Meeting Request submitted 3/12/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Kevin Barnett Contact Email Address* khbarnett@ncdot.gov Project Name* Replacement of Bridge#237 over Sorrell Creek on SR1129(Little East Fork Rd) Project Owner* NC DOT Project County* Haywood Owner Address: Street Address 253 Webster Rd Address Line 2 City State/Bovine/Region Sylva NC Fbstal/Zip Code Country 28779 US Is this a transportation project?* 6. Yes r No Type(s) of approval sought from the DWR: I� 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* Yes c No Please list all existing project ID's associated with this projects.* 17BP.14.R.177 Do you know the name of the staff member you would like to request a meeting with? Kevin Mitchell Please give a brief project description below.* This is a bridge replacement and associated pond fill on the entry road to a Boy Scout Camp. Please give a couple of dates you are available for a meeting. 3/22/2021 3/24/2021 Please attach the documentation you would like to have the meeting about. Haywood County-B237- Design Plans.pdf 9.21 MB Haywood County-B237- PJD(Final).pdf 234.36KB Haywood County-B237- Plan sheet with 446.82KB historic marked.pdf Haywood County-B237- USGS Topo 716.61 KB Map1.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature �f 1Y Submittal Date 3/12/2021 Reviewer Meeting Request Decision Has a meeting been scheduled?* C Yes r No Comment for Email: No project required. Pre file request form was previously submitted.